Planning application
41 Belvue Road Northolt UB5 5HW
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey front extension; two storey side and rear extension (following demolition of existing shed); alteration to front porch
As published by the council, reference 261259HH
Application record
- Reference
- 261259HH
- Type
- Householder
- Status
- Granted with Conditions
- Decision
- Grant with Conditions
- Received
- 24 Mar 2026
- Validated
- 24 Mar 2026
- Decided
- 18 May 2026
- Ward
- Northolt Mandeville
- Decision by
- Delegated Decision
- Postcode
- UB5 5HW
Site history
Applications at this address on the Old Oak and Park Royal Development Corporation register
This site has had 2 applications since 2026: 2 approved, 0 refused.
-
260510PALHE Granted
41 Belvue Road Northolt UB5 5HW
Single storey rear extension (max 6m deep and max 2.96m high) (42 Days Prior Approval Notification Process)
Timeline
Dates from the published record
-
24 Mar 2026
Received by Old Oak and Park Royal Development Corporation
-
18 May 2026
Decision issued: Grant with Conditions
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
10 applications on PlanIndex · across 6 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Old Oak and Park Royal Development Corporation granted permission on 18 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About householder applications
Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
41 Belvue Road Northolt UB5 5HW
Single storey rear extension (max 6m deep and max 2.96m high) (42 Days Prior Approval Notification Process)
Granted Prior approval Extension 6 docsSmall domestic -
41 Belvue Road Northolt UB5 5HW
Single storey rear extension (max 6m deep and max 2.96m high) (42 Days Prior Approval Notification Process)
Granted Prior approval Extension 6 docsSmall domestic -
North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound
Granted Extension 34 docs -
North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA
Application for a Non-Material Change (Section 21, Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017) seeking to allow changes to earthworks including a retaining wall to facilitate the relocation of the perimeter drainage channel and associated below ground services in relation to approval reference 230131HS2 dated 06/03/2023 for Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound
Granted Extension 13 docs -
North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA
Application for a Non-Material Change (Section 21, Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017) seeking to allow changes to earthworks including a retaining wall to facilitate the relocation of the perimeter drainage channel and associated below ground services in relation to approval reference 230131HS2 dated 06/03/2023 for Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound
Granted Extension 13 docs -
North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound
Granted Extension 34 docs
Other householder applications
In Old Oak and Park Royal Development Corporation
-
261571HH Granted
55 Ramillies Road Chiswick W4 1JW
Single storey rear extension; alteration of roof from hip to gable end; rear roof extension; installation of two rooflights to front roofslope; alterations to side fenestrations; replacement glazing throughout, replacement external render and hung tiles
-
262060HH Granted
8 Carlyle Gardens Southall UB1 2BN
Construction of single storey rear extension; first floor rear extension; alterations to the front, side and rear elevations involving modifications and insertion of windows; together with associated internal alterations (Retrospective)
-
262480HH Refused
270 Norwood Road Southall UB2 4JH
Alteration of roof from hip to gable end; rear roof extension; installation of three rooflights to front roofslope; alteration to first floor rear extension roof; external alterations
-
262450HH Granted
83 Bilton Road Perivale UB6 7BB
Formation of vehicle crossover
-
262646HH Granted
130 Bridge Avenue Hanwell W7 3AR
Single storey rear extension