Planning application
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of Air Quality and Dust Management Plan part pursuant to condition 40 (Phase 2 Enabling, Phase 2 Construction, Phase 3 Enabling, Phase 3 Construction, Phase 4 Enabling and Phase 4 Construction only) of planning permission reference: 201379OUT dated 22.12.2021 for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market dwellings (up to 61,940sqm(GIA)) in 8 Blocks of between 8 storeys and 18 storeys, new open and amenity space, vehicle and cycle parking, rear service road, alterations to vehicular accesses and associated public realm works. Appearance to be a 'reserved' matter.
As published by the council, reference 243169CND
Application record
- Reference
- 243169CND
- Type
- Discharge Condition
- Status
- Approved
- Decision
- Granted As published: Approved
- Received
- 15 Aug 2024
- Validated
- 15 Aug 2024
- Decided
- 22 Oct 2024
- Ward
- South Acton
- Decision by
- Delegated Decision
- Postcode
- W3 8QU
Site history
Applications at this address on the Old Oak and Park Royal Development Corporation register
This site has had 13 applications since 2024: 13 approved, 0 refused.
-
262319CND Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of Solar Glare pursuant to Condition 16 of planning permission ref: 243527VAR dated 26th June 2025 in so far as it relates to the Phase 2 Enabling and Construction only
-
262287CND Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of Photovoltaic Panels part pursuant to Condition 28 of planning permission ref: 243527VAR dated 26th June 2025 for Phase 2 Enabling and Phase 2 Construction.
-
260288CND Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of ground and airborne building vibration pursuant to condition 49 of planning permission ref: 243527VAR dated 26/06/2025 for Phase 3 Enabling and Phase 3 Construction.
-
260130NMA Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Application for a Non-Material Amendment in (S96a) seeking to allow amendments of wording in relation to planning permission reference 243527VAR dated 26/06/2025.
-
254595NMA Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Application for a Non Material Amendment (S96a) to alter approved drawings to enable the delivery of a Passivhaus design for Phase 3 of planning permission 243796REM dated 27/06/2025.
-
254594NMA Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Application for a Non Material Amendment (S96a) to alter conditions and approved drawings to enable the delivery of a Passivhaus design for Phase 3 of planning permission 243527VAR dated 27.06.2025 as amended by 260130NMA dated 29.01.2026.
-
254489CND Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of Ventilation Strategy pursuant to condition 39 of planning permission ref: 243527VAR dated 26/06/2025 for Phase 2 Enabling and Phase 2 Construction.
-
254280CND Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Submission of a Bird Hazard Management Plan pursuant to condition 59 of planning permission 243527VAR dated 26.06.2025 for Phase 2 Enabling, Phase 2 Construction, Phase 3 Enabling and Phase 3 Construction
-
253747CND Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South London W3 8QU
Details of arrangements for temporary vehicle turning and manoeuvring pursuant to condition 18 (for Phase 3 Enabling and Phase 3 Construction) of planning permission ref: 243527VAR dated 26/06/2025 for: Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4, Condition 5, Condition 27 , Condition 31, Condition 37, and Condition 58 pursuant to planning permission ref: 201379OUT for Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works
-
243753CPL Granted
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Confirmation that the proposed partial demolition of an existing gas/water meter house would constitute the lawful commencement of planning permission ref: 201379OUT, dated 22/12/2021 for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market dwellings (up to 61,940sqm(GIA)) in 8 Blocks of between 8 storeys and 18 storeys, new open and amenity space, vehicle and cycle parking, rear service road, alterations to vehicular accesses and associated public realm works. Appearance to be a 'reserved' matter'. (Lawful Development Certificate for a Proposed Development)
Timeline
Dates from the published record
-
15 Aug 2024
Received by Old Oak and Park Royal Development Corporation
-
22 Oct 2024
Decision issued: Approved
-
3 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Carter Jonas LLP Agent
927 applications on PlanIndex · across 132 councils · 88% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Old Oak and Park Royal Development Corporation granted permission on 22 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Details of Air Quality and Dust Management Plan part pursuant to condition 40 (Phase 2 Enabling, Phase 2 Construction, Phase 3 Enabling, Phase 3 Construction, Phase 4 Enabling and Phase 4 Construction only) of planning permission reference: 201379OUT dated 22.12.2021 for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market dwellings (up to 61,940sqm(GIA)) in 8 Blocks of between 8 storeys and 18 storeys, new open and amenity space, vehicle and cycle parking, rear service road, alterations to vehicular accesses and associated public realm works. Appearance to be a 'reserved' matter.
Granted Conditions Demolition 4 docs -
29-39 Stirling Road Acton W3 8DJ
90% historically approved · decision due ~27 Feb
Change of use of ground and first floor from Class E(g) to Class B8
Awaiting decision Outline -
1 Stirling Road/1-9 Colville Road And 67-81 Stirling Road Acton W3 8DJ
83% historically approved · decision due ~5 Nov
Application for a Non-Material Amendment in (S96a) seeking to allow Amendment to the wording of Condition 22 (Details of materials) of the planning permission to change the trigger point for discharge in relation to planning permission reference 232800FUL dated 08/05/2024 for: Demolition of existing buildings and construction of a mixed use development comprising commercial floorspace, residential units (Use Class C3) and purpose built student housing (Sui Generis), within two buildings, comprising 20 and 11 storeys, with landscaping, and associated ancillary and enabling works
Awaiting decision Amendments Demolition 3 docs -
29-39 Stirling Road Acton W3 8DJ
91% historically approved · decision due ~27 Feb
Change of use of ground and first floor from Class E(g) to Class B8
Awaiting decision Outline -
1 Stirling Road/1-9 Colville Road And 67-81 Stirling Road Acton W3 8DJ
Details pursuant to part (d) of Condition 36 (Energy and CO2) in relation to planning permission 232800FUL dated 08.05.2024 for 'Demolition of existing buildings and construction of a mixed use development comprising commercial floorspace, residential units (Use Class C3) and purpose built student housing (Sui Generis), within two buildings, comprising 20 and 11 storeys, with landscaping, and associated ancillary and enabling works'
Granted Conditions Demolition 6 docs -
1 Stirling Road/1-9 Colville Road And 67-81 Stirling Road Acton W3 8DJ
Details pursuant to part (d) of Condition 36 (Energy and CO2) in relation to planning permission 232800FUL dated 08.05.2024 for 'Demolition of existing buildings and construction of a mixed use development comprising commercial floorspace, residential units (Use Class C3) and purpose built student housing (Sui Generis), within two buildings, comprising 20 and 11 storeys, with landscaping, and associated ancillary and enabling works'
Granted Demolition 4 docs
Other condition discharge and variation applications
In Old Oak and Park Royal Development Corporation
-
262549CND Granted
Ealing Studios Ealing Green Ealing W5 5EP
Details of design elements of the brickwork, render and windows pursuant to condition 3 of planning permission reference: 223791LBC dated 27/10/2022 for: Demolition of an existing link structure attached to the listed building and construction of replacement facade and windows. (Listed Building Consent)
-
261517CND Granted
59 Friars Place Lane Acton W3 7AQ
Details of an enhanced sound insulation for the floor/ceiling/wall structures pursuant to condition 7 of planning permission ref: 254295FUL dated 07/01/2026 for: Conversion of a single family dwellinghouse into two self-contained flats; associated internal and external alterations including changes to rear fenestration; and provision bin and cycle storage
-
261515CND Granted
59 Friars Place Lane Acton W3 7AQ
Details of cycle parking pursuant to condition 5 of planning permission ref: 254295FUL dated 07/01/2026 for: Conversion of a single family dwellinghouse into two self-contained flats; associated internal and external alterations including changes to rear fenestration; and provision bin and cycle storage
-
254020CND Granted
131 - 139 Broadway West Ealing W13 9BE
Details of plant/ machinery/ equipment /mechanical installations and noise level including mitigation measures pursuant to condition 21 of planning permission ref: 235015FUL dated 03/04/2025 for: Construction of a building stepped from 4 to 9 storeys comprising co-living units (Sui Generis) and associated communal amenity facilities and ground floor commercial space (Use Classes E(a), E(b) and F2(b); and associated refuse storage and cycle parking (following demolition of the existing buildings and structures)
-
254019CND Granted
131 - 139 Broadway West Ealing W13 9BE
Details of enhanced sound insulation of lifts and lift shafts and mitigation measures pursuant to condition 20 of planning permission ref: 235015FUL dated 03/04/2025 for: Construction of a building stepped from 4 to 9 storeys comprising co-living units (Sui Generis) and associated communal amenity facilities and ground floor commercial space (Use Classes E(a), E(b) and F2(b); and associated refuse storage and cycle parking (following demolition of the existing buildings and structures)