Skip to content
PlanIndex Get alerts
Menu

Planning application

Norwich Railway Station Station Approach Norwich NR1 1EF

Granted Norwich 26/00586/D

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of Condition 5(a): replacement concourse clock of previous consent 23/01271/L.

As published by the council, reference 26/00586/D

Application record

Reference
26/00586/D
Status
Decided
Decision
Granted As published: Approved
Received
10 Jun 2026
Validated
29 Jul 2026
Decided
22 Sep 2026
Ward
Thorpe Hamlet
Postcode
NR1 1EF

Site history

Applications at this address on the Norwich register

This site has had 6 applications since 2020: 5 approved, 1 refused.

  • 26/00444/TPO Refused

    Norwich Railway Station Station Approach Norwich NR1 1EF

    4no. plane trees: Crown lift lower branches to provide suitable clearance over pedestrian and operational areas - Reduce over extended limbs where required - Remove any deadwood or damaged branches identified during the works

    Decided 1 Jul 2026 Trees
  • 24/01152/L Granted

    Norwich Railway Station Station Approach Norwich NR1 1EF

    Replacement of existing timber fencing and gates with new blue powder coated security palisade fencing and matching gates.

    Decided 26 Nov 2024 Heritage and listed buildings
  • 22/01510/TPO Granted

    Norwich Railway Station Station Approach Norwich NR1 1EF

    4no. plane: Crown lift to improve visibility of regulatory signage and ensure clearance for vehicular access, current crown height from ground is 3m, increase to 4m.

    Decided 20 Mar 2023 Trees
  • 20/00695/L Granted

    Norwich Railway Station Station Approach Norwich NR1 1EF

    Internal alterations to 1st floor office accommodation.

    Decided 11 Aug 2020 Heritage and listed buildings
  • 20/00463/L Granted

    Norwich Railway Station Station Approach Norwich NR1 1EF

    Replace existing advertisements with 6 digital units. Replacement clock.

    Decided 3 Jul 2020 Heritage and listed buildings

Timeline

Dates from the published record

  1. 10 Jun 2026

    Received by Norwich

  2. 29 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Aug 2026

    Added to PlanIndex

  4. 22 Sep 2026

    Decision issued: Approved

  5. 22 Sep 2026

    Status changed to Decided

    Previously Awaiting decision.

Cases linked to this one on the register

  • Application: 23/01271/L (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

  • Existing train station ga lease/location plan Location Plan · 29 Jul 2026
  • Existing concourse plan ground floor level Plans Existing · 29 Jul 2026
  • Existing concourse plan first floor level Plans Existing · 29 Jul 2026
  • Existing concourse elevation Elevations Existing · 29 Jul 2026
  • Existing concourse section Sections Existing · 29 Jul 2026
  • Proposed concourse plan ground floor level Plans Proposed · 29 Jul 2026
  • Proposed concourse plan first floor level Plans Proposed · 29 Jul 2026
  • Proposed concourse elevation & clock materials & finish Elevations Proposed · 29 Jul 2026
  • Proposed concourse section Sections Proposed · 29 Jul 2026
  • Proposed concourse clock details sheet Detailed Plans · 29 Jul 2026
  • Applicationformredacted Application Form · 10 Jun 2026
  • Inspection certificate Additional Information · 10 Jun 2026
  • Screenshot 2026-05-13 121225 1 Additional Information · 10 Jun 2026
  • Screenshot 2026-05-13 121849 1 Additional Information · 10 Jun 2026
  • Inspection certificate - mill certificate Additional Information · 10 Jun 2026
  • Can 450 use and maintenance manual Specification · 10 Jun 2026
  • Screenshot 2026-05-13 121252 1 Additional Information · 10 Jun 2026
  • Mill test certificate Additional Information · 10 Jun 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Norwich granted permission on 22 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Norwich's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles