Planning application
Norwich Railway Station Station Approach Norwich NR1 1EF
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Internal alterations to 1st floor office accommodation.
As published by the council, reference 20/00695/L
Application record
- Reference
- 20/00695/L
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 22 Jun 2020
- Validated
- 22 Jun 2020
- Decided
- 11 Aug 2020
- Ward
- Thorpe Hamlet
- Decision by
- Delegated Decision
- Postcode
- NR1 1EF
Site history
Applications at this address on the Norwich register
This site has had 6 applications since 2020: 5 approved, 1 refused.
-
26/00586/D Granted
Norwich Railway Station Station Approach Norwich NR1 1EF
Details of Condition 5(a): replacement concourse clock of previous consent 23/01271/L.
-
26/00444/TPO Refused
Norwich Railway Station Station Approach Norwich NR1 1EF
4no. plane trees: Crown lift lower branches to provide suitable clearance over pedestrian and operational areas - Reduce over extended limbs where required - Remove any deadwood or damaged branches identified during the works
-
24/01152/L Granted
Norwich Railway Station Station Approach Norwich NR1 1EF
Replacement of existing timber fencing and gates with new blue powder coated security palisade fencing and matching gates.
-
22/01510/TPO Granted
Norwich Railway Station Station Approach Norwich NR1 1EF
4no. plane: Crown lift to improve visibility of regulatory signage and ensure clearance for vehicular access, current crown height from ground is 3m, increase to 4m.
-
20/00463/L Granted
Norwich Railway Station Station Approach Norwich NR1 1EF
Replace existing advertisements with 6 digital units. Replacement clock.
Timeline
Dates from the published record
-
22 Jun 2020
Received by Norwich
-
11 Aug 2020
Decision issued: Approved
-
9 Aug 2026
Added to PlanIndex
What this grant of permission means
Norwich granted permission on 11 August 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Unit 1 Norwich Railway Station Station Approach Norwich NR1 1EG
Interior alterations to vacant retail unit.
Granted Heritage and listed buildings -
Norwich Railway Station Station Approach Norwich NR1 1EF
4no. plane trees: Crown lift lower branches to provide suitable clearance over pedestrian and operational areas - Reduce over extended limbs where required - Remove any deadwood or damaged branches identified during the works
Refused Trees 3 docs -
Norwich Railway Station Station Approach Norwich NR1 1EF
Details of Condition 5(a): replacement concourse clock of previous consent 23/01271/L.
Granted 18 docs -
Norwich Railway Station Station Approach Norwich NR1 1EF
Replacement of existing timber fencing and gates with new blue powder coated security palisade fencing and matching gates.
Granted Heritage and listed buildings 11 docs -
Norwich Railway Station Station Approach Norwich NR1 1EF
Replace existing advertisements with 6 digital units. Replacement clock.
Granted Heritage and listed buildings -
Unit 5 Norwich Railway Station Station Approach Norwich NR1 1EG
Alterations to facilitate occupation by Costa.
Granted Heritage and listed buildings
Other heritage and listed building applications
In Norwich
-
26/01044/L Awaiting decision
16 Gentlemans Walk Norwich NR2 1LZ
Replacement and repair of certain internal doors that do not comply with Heath & Safety and security procedures
-
26/01043/L Awaiting decision
Pivotal House 5 Orford Yard Red Lion Street Norwich NR1 3TB
Creating two dormers in existing hip-to-gable roof. Transforming cloakroom into shower-room.
-
26/00826/L Granted
The Assembly House Theatre Street Norwich NR2 1RQ
Creating a new entrance to the Undercroft bedroom suite from the east courtyard; installing a new cladding screen to the undercroft entrance and the elevations of Rooms 3 and 4; adjusting the boundary treatment along The Chantry with associated resurfacing; installing a new vehicular and pedestrian gate, car port and laundry room along The Chantry; installation of 5no. new air conditioning units.
-
26/00857/L Granted
3 West Parade Norwich NR2 3DN
Construction of new ground floor cloakroom off hall. Partial demolition of existing utility space off kitchen with new insulated brick wall, window and rooflight. Removal of 1960's metal window and brickwork below to make double doors from kitchen with reinstatement of former open fronted glazed verandah.
-
26/00756/L Granted
St Gregory's Church St Gregorys Alley Norwich NR2 1ER
Repair works to north elevation and porch including flintwork rebuilding, masonry repairs, leadwork, window conservation and replacing cast-iron rainwater goods to match existing.