Skip to content
PlanIndex Get alerts
Menu

Planning application

Nelson Hotel Prince Of Wales Road Norwich NR1 1DX

Awaiting decision Norwich 24/01050/F Full

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Hybrid (Part Full/Part Outline) for the redevelopment of Nelson Hotel. A full planning application for demolition of existing buildings and structures and phased development comprising of new hotel (Class C1), purposed built student accommodation (Sui Generis), and Class E floorspace, public realm, landscaping, with improvements to River Walkway; with new primary access from Mountergate and egress onto Baltic Wharf; internal roads, car and cycle parking, servicing, plant and associated works. An outline application with all matters reserved for the demolition of existing buildings and structures and replacement with a residential (Class C3) development, landscaping and cycle parking with associated works.

As published by the council, reference 24/01050/F

Application record

Reference
24/01050/F
Type
Full
Status
Awaiting decision
Received
1 Oct 2024
Validated
1 Oct 2024
Ward
Thorpe Hamlet
Postcode
NR1 1DX

Site history

Applications at this address on the Norwich register

This site has had 3 applications since 2020: 2 approved, 0 refused.

  • 21/01272/TCA Granted

    Nelson Hotel Prince Of Wales Road Norwich NR1 1DX

    Raise the canopy of all trees to 4m from ground level.

    Decided 8 Oct 2021 Trees
  • 20/01292/TCA Granted

    Nelson Hotel Prince Of Wales Road Norwich NR1 1DX

    T1 - Robinia: Fell.

    Decided 3 Dec 2020 Trees

Timeline

Dates from the published record

  1. 1 Oct 2024

    Received by Norwich

  2. 9 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 26 November 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Norwich took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Savills Limited Agent, registered in London

Active · incorporated 1987 · London

2,469 applications on PlanIndex · across 194 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

236 documents on file for this application

  • Committee report Committee Report · 02 Jul 2026
  • Norwich nelson masterplan site secondary exports pre and post development Nutrient Neutrality Budget Calculator · 19 Jun 2026
  • Email from agent Correspondence · 17 Jun 2026
  • Email from agent Correspondence · 17 Jun 2026
  • Nutrient neutral assessment and mitigation strategy report Nutrient Neutrality Assessment and Mitigation · 17 Jun 2026
  • Norwich nelson masterplan 75 dwelling residential Nutrient Neutrality Budget Calculator · 17 Jun 2026
  • Norwich nelson baseline 185 room hotel Nutrient Neutrality Budget Calculator · 17 Jun 2026
  • Norwich nelson proposed 248 room hotel Nutrient Neutrality Budget Calculator · 17 Jun 2026
  • Sale agreement Nutrient Neutrality Credits Allocation Certificate · 15 Jun 2026
  • Sale agreement ptp upgrades & nutrient credits Additional Information · 15 Jun 2026
  • Email from agent Correspondence · 12 Jun 2026
  • Credit purchase agreement and credit certificate Nutrient Neutrality Credits Allocation Certificate · 22 May 2026
  • Credit purchase agreement and credit certificate Nutrient Neutrality Credits Allocation Certificate · 22 May 2026
  • Nelson masterplan site secondary exports pre and post development Nutrient Neutrality Budget Calculator · 19 May 2026
  • Nutrient neutral assessment and mitigation strategy report Nutrient Neutrality Assessment and Mitigation · 19 May 2026
  • Updated bat emergence survey Bat Survey · 14 May 2026
  • Preliminary ecological appraisal of norwich nelson_2026 update Ecological Assessment · 20 Apr 2026
  • 2026 04 14 natural england Consultation Response · 16 Apr 2026
  • Norfolk county council planning obligations Consultation Response · 20 Mar 2026
  • Email to natural england Correspondence · 19 Mar 2026
  • Email from agent Correspondence · 18 Mar 2026
  • Norwich nelson masterplan 491 bed pbsa Nutrient Neutrality Budget Calculator · 17 Mar 2026
  • Norwich nelson baseline 185 room hotel Nutrient Neutrality Budget Calculator · 17 Mar 2026
  • Norwich nelson proposed 248 room hotel Nutrient Neutrality Budget Calculator · 17 Mar 2026
  • Nutrient neutral assessment and mitigation strategy report Nutrient Neutrality Assessment and Mitigation · 17 Mar 2026
  • Norwich nelson masterplan 491 bed pbsa Nutrient Neutrality Budget Calculator · 17 Mar 2026
  • Norwich nelson masterplan 75 dwelling residential Nutrient Neutrality Budget Calculator · 17 Mar 2026
  • Consultation response Historic System Migration · 23 Feb 2026
  • Consultation response Historic System Migration · 06 Feb 2026
  • Consultation response Historic System Migration · 10 Nov 2025
  • Consultation response Historic System Migration · 09 Oct 2025
  • Press notice Historic System Migration · 06 Oct 2025
  • Additional transport statement Historic System Migration · 29 Sep 2025
  • Revised planning statement Historic System Migration · 29 Sep 2025
  • Economic statement Historic System Migration · 29 Sep 2025
  • Economic statement Historic System Migration · 29 Sep 2025
  • Revised composite plans - proposed Historic System Migration · 29 Sep 2025
  • Superseded other plans Historic System Migration · 29 Sep 2025
  • Revised composite plans - proposed Historic System Migration · 29 Sep 2025
  • Revised composite plans - proposed Historic System Migration · 29 Sep 2025
  • Revised landscaping details Historic System Migration · 29 Sep 2025
  • Covering letter Historic System Migration · 29 Sep 2025
  • Additional visual impact assessment Historic System Migration · 29 Sep 2025
  • Revised cil additional information requirement form Historic System Migration · 29 Sep 2025
  • Revised composite plans - proposed Historic System Migration · 29 Sep 2025
  • Additional visual impact assessment Historic System Migration · 29 Sep 2025
  • Superseded application form Historic System Migration · 29 Sep 2025
  • Additional design and access statement Historic System Migration · 29 Sep 2025
  • Additional design and access statement Historic System Migration · 29 Sep 2025
  • Revised composite plans - proposed Historic System Migration · 29 Sep 2025
  • Additional design and access statement Historic System Migration · 29 Sep 2025
  • Revised other plans Historic System Migration · 29 Sep 2025
  • Revised composite plans - proposed Historic System Migration · 29 Sep 2025
  • Revised additional information Historic System Migration · 29 Sep 2025
  • Additional visual impact assessment Historic System Migration · 29 Sep 2025
  • Additional design and access statement Historic System Migration · 29 Sep 2025
  • Economic statement Historic System Migration · 29 Sep 2025
  • Additional design and access statement Historic System Migration · 29 Sep 2025
  • Revised composite plans - proposed Historic System Migration · 29 Sep 2025
  • Revised composite plans - proposed Historic System Migration · 29 Sep 2025
  • Superseded additional information Historic System Migration · 29 Sep 2025
  • Revised other plans Historic System Migration · 29 Sep 2025
  • Revised composite plans - existing Historic System Migration · 29 Sep 2025
  • Covering letter Historic System Migration · 29 Sep 2025
  • Revised additional information Historic System Migration · 29 Sep 2025
  • Revised additional information Historic System Migration · 29 Sep 2025
  • Consultation response Historic System Migration · 09 Sep 2025
  • Consultation response Historic System Migration · 22 Aug 2025
  • Additional information Historic System Migration · 21 Aug 2025
  • Consultation response Historic System Migration · 08 Aug 2025
  • Consultation response Historic System Migration · 08 Aug 2025
  • Consultation response Historic System Migration · 31 Jul 2025
  • Additional information Historic System Migration · 08 Jul 2025
  • Additional information Historic System Migration · 08 Jul 2025
  • Additional information Historic System Migration · 08 Jul 2025
  • Ecological assessment Historic System Migration · 08 Jul 2025
  • Bng calculator Historic System Migration · 08 Jul 2025
  • Consultation response Historic System Migration · 30 May 2025
  • Consultation response Historic System Migration · 21 May 2025
  • Consultation response Historic System Migration · 14 May 2025
  • Nutrient neutrality budget calculator Historic System Migration · 30 Apr 2025
  • Revised surface water drainage Historic System Migration · 30 Apr 2025
  • Nutrient neutrality budget calculator Historic System Migration · 30 Apr 2025
  • Revised surface water drainage Historic System Migration · 30 Apr 2025
  • Revised surface water drainage Historic System Migration · 30 Apr 2025
  • Revised surface water drainage Historic System Migration · 30 Apr 2025
  • Nutrient neutrality budget calculator Historic System Migration · 30 Apr 2025
  • Additional information Historic System Migration · 30 Apr 2025
  • Additional information Historic System Migration · 30 Apr 2025
  • Revised surface water drainage Historic System Migration · 30 Apr 2025
  • Revised surface water drainage Historic System Migration · 30 Apr 2025
  • Nutrient neutrality budget calculator Historic System Migration · 30 Apr 2025
  • Nutrient neutrality budget calculator Historic System Migration · 30 Apr 2025
  • Consultation response Historic System Migration · 28 Apr 2025
  • Consultation response Historic System Migration · 16 Apr 2025
  • Consultation response Historic System Migration · 08 Apr 2025
  • Consultation response Historic System Migration · 26 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Superseded landscaping details Historic System Migration · 17 Mar 2025
  • Landscaping details Historic System Migration · 17 Mar 2025
  • Landscaping details Historic System Migration · 17 Mar 2025
  • Landscaping details Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Landscaping details Historic System Migration · 17 Mar 2025
  • Landscaping details Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Revised travel plan Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Letter correspondence Historic System Migration · 17 Mar 2025
  • Revised plans - proposed Historic System Migration · 17 Mar 2025
  • Consultation response Historic System Migration · 14 Mar 2025
  • Consultation response Historic System Migration · 11 Mar 2025
  • Superseded surface water drainage Historic System Migration · 10 Mar 2025
  • Superseded surface water drainage Historic System Migration · 10 Mar 2025
  • Superseded surface water drainage Historic System Migration · 10 Mar 2025
  • Superseded surface water drainage Historic System Migration · 10 Mar 2025
  • Superseded surface water drainage Historic System Migration · 10 Mar 2025
  • Superseded surface water drainage Historic System Migration · 10 Mar 2025
  • Superseded surface water drainage Historic System Migration · 10 Mar 2025
  • Consultation response Historic System Migration · 07 Mar 2025
  • Consultation response Historic System Migration · 06 Mar 2025
  • Consultation response Historic System Migration · 28 Feb 2025
  • Consultation response Historic System Migration · 24 Feb 2025
  • Consultation response Historic System Migration · 19 Feb 2025
  • Air quality assessment Historic System Migration · 17 Feb 2025
  • Covering letter Historic System Migration · 17 Feb 2025
  • Habitats regulations assessment Historic System Migration · 17 Feb 2025
  • Additional information Historic System Migration · 17 Feb 2025
  • Additional information Historic System Migration · 12 Feb 2025
  • Consultation response Historic System Migration · 15 Jan 2025
  • Consultation response Historic System Migration · 15 Jan 2025
  • Consultation response Historic System Migration · 15 Jan 2025
  • Consultation response Historic System Migration · 15 Jan 2025
  • Consultation response Historic System Migration · 10 Dec 2024
  • Consultation response Historic System Migration · 05 Dec 2024
  • Consultation response Historic System Migration · 05 Dec 2024
  • Consultation response Historic System Migration · 27 Nov 2024
  • Additional information Historic System Migration · 27 Nov 2024
  • Consultation response Historic System Migration · 26 Nov 2024
  • Consultation response Historic System Migration · 19 Nov 2024
  • Consultation response Historic System Migration · 08 Nov 2024
  • Consultation response Historic System Migration · 04 Nov 2024
  • Consultation response Historic System Migration · 30 Oct 2024
  • Consultation response Historic System Migration · 30 Oct 2024
  • Consultation response Historic System Migration · 28 Oct 2024
  • Consultation response Historic System Migration · 24 Oct 2024
  • Consultation response Historic System Migration · 24 Oct 2024
  • Consultation response Historic System Migration · 24 Oct 2024
  • Consultation response Historic System Migration · 24 Oct 2024
  • Consultation response Historic System Migration · 21 Oct 2024
  • Press notice Historic System Migration · 21 Oct 2024
  • Consultation response Historic System Migration · 21 Oct 2024
  • Site notice Historic System Migration · 16 Oct 2024
  • Site notice Historic System Migration · 16 Oct 2024
  • Site notice Historic System Migration · 16 Oct 2024
  • Consultation response Historic System Migration · 10 Oct 2024
  • Bng calculator Historic System Migration · 02 Oct 2024
  • Flood risk assessment Historic System Migration · 02 Oct 2024
  • Superseded additional information Historic System Migration · 02 Oct 2024
  • Additional information Historic System Migration · 02 Oct 2024
  • Ecological assessment Historic System Migration · 02 Oct 2024
  • Superseded additional information Historic System Migration · 02 Oct 2024
  • Additional information Historic System Migration · 02 Oct 2024
  • Superseded surface water drainage Historic System Migration · 02 Oct 2024
  • Arboricultural method statement Historic System Migration · 02 Oct 2024
  • Risk assessment Historic System Migration · 02 Oct 2024
  • Constructon management plan Historic System Migration · 02 Oct 2024
  • Tree survey or arboricultural implications Historic System Migration · 02 Oct 2024
  • Superseded surface water drainage Historic System Migration · 02 Oct 2024
  • Flood risk assessment Historic System Migration · 02 Oct 2024
  • Landscaping details Historic System Migration · 02 Oct 2024
  • Superseded composite plans - proposed Historic System Migration · 02 Oct 2024
  • Additional information Historic System Migration · 02 Oct 2024
  • Additional information Historic System Migration · 02 Oct 2024
  • Superseded additional information Historic System Migration · 02 Oct 2024
  • Flood risk assessment Historic System Migration · 02 Oct 2024
  • Visual impact assessment Historic System Migration · 02 Oct 2024
  • Superseded other plans Historic System Migration · 02 Oct 2024
  • Superseded additional information Historic System Migration · 02 Oct 2024
  • Visual impact assessment Historic System Migration · 02 Oct 2024
  • Visual impact assessment Historic System Migration · 02 Oct 2024
  • Landscaping details Historic System Migration · 02 Oct 2024
  • Superseded other plans Historic System Migration · 02 Oct 2024
  • Acoustic report Historic System Migration · 02 Oct 2024
  • Superseded composite plans - proposed Historic System Migration · 02 Oct 2024
  • Archaeological desk based assessment+égÇÖ Historic System Migration · 02 Oct 2024
  • Superseded composite plans - proposed Historic System Migration · 02 Oct 2024
  • Risk assessment Historic System Migration · 02 Oct 2024
  • Superseded surface water drainage Historic System Migration · 02 Oct 2024
  • Superseded other plans Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Transport assessment Historic System Migration · 02 Oct 2024
  • Superseded composite plans - existing Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Sustainability appraisal Historic System Migration · 02 Oct 2024
  • Superseded surface water drainage Historic System Migration · 02 Oct 2024
  • Superseded composite plans - proposed Historic System Migration · 02 Oct 2024
  • Transport assessment Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Energy statement Historic System Migration · 02 Oct 2024
  • Transport assessment Historic System Migration · 02 Oct 2024
  • Superseded planning statement Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Statement of community involvement Historic System Migration · 02 Oct 2024
  • Superseded additional information Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Superseded travel plan Historic System Migration · 02 Oct 2024
  • Additional information Historic System Migration · 02 Oct 2024
  • Visual impact assessment Historic System Migration · 02 Oct 2024
  • Superseded surface water drainage Historic System Migration · 02 Oct 2024
  • Superseded cil additional information requirement form Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Superseded composite plans - existing Historic System Migration · 02 Oct 2024
  • Superseded composite plans - proposed Historic System Migration · 02 Oct 2024
  • Superseded surface water drainage Historic System Migration · 02 Oct 2024
  • Daylight or sunlight assessment Historic System Migration · 02 Oct 2024
  • Transport assessment Historic System Migration · 02 Oct 2024
  • Transport assessment Historic System Migration · 02 Oct 2024
  • Superseded application form Historic System Migration · 02 Oct 2024
  • Covering letter Historic System Migration · 02 Oct 2024
  • Superseded composite plans - proposed Historic System Migration · 02 Oct 2024
  • Superseded surface water drainage Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Air quality assessment Historic System Migration · 02 Oct 2024
  • Superseded composite plans - proposed Historic System Migration · 02 Oct 2024
  • Superseded surface water drainage Historic System Migration · 02 Oct 2024
  • Design and access statement Historic System Migration · 02 Oct 2024
  • Daylight or sunlight assessment Historic System Migration · 02 Oct 2024
  • Superseded composite plans - proposed Historic System Migration · 02 Oct 2024
  • Superseded additional information Historic System Migration · 02 Oct 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Norwich for determination, against a statutory target of eight weeks. Over the last year Norwich decided full applications in a median of 65 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Norwich

  • 26/00714/F Granted

    20 Bank Plain Norwich NR2 4SF

    New library, archive, entrance, cafe, gallery and associated learning and support spaces.

    Received 17 Jul, published by the council 28 Aug 2026 Full applications
  • 26/00716/F Granted

    4 Spynke Road Norwich NR3 2SE

    Renovation of fire damaged dwelling, including internal configuration alterations, rear extension, new windows, doors, fascias, soffits and rainwater goods. Render applied to existing extension and new extension walls. New timber canopy structure to front entrance.

    Received 20 Jul, published by the council 2 Aug 2026 Full applications
  • 26/00609/F Withdrawn

    1 Calthorpe Road Norwich NR5 8RX

    Subdivision of the curtilage of 1 Calthorpe Road and erection of new 2 storey dwelling.

    Received 18 Jun, published by the council 24 Jul 2026 Full applications
  • 26/00678/F Granted

    53 Cecil Road Norwich NR1 2QN

    Two storey side extension with front lean-to roof.

    Received 9 Jul, published by the council 13 Aug 2026 Full applications
  • 26/00825/F Granted

    The Assembly House Theatre Street Norwich NR2 1RQ

    Creating a new entrance to the Undercroft bedroom suite from the east courtyard; installing a new cladding screen to the undercroft entrance and the elevations of Rooms 3 and 4; adjusting the boundary treatment along The Chantry with associated resurfacing; installing a new vehicular and pedestrian gate, car port and laundry room along The Chantry; installation of 5no. new air conditioning units.

    Received 20 Aug, published by the council 28 Aug 2026 Full applications