Planning application

426 Unthank Road Norwich NR4 7QH

Granted Norwich 24/00689/F Full

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey extension to rear of property with flat roof and parapet wall upstand. Approx. 15m2 in footprint, projecting 1.5m from existing elevation. window and door to front elevation replaced with window only.

As published by the council, reference 24/00689/F

Application record

Reference
24/00689/F
Type
Full
Status
Decided
Decision
Approved
Received
10 Jun 2024
Validated
16 Aug 2024
Decided
17 Oct 2024
Ward
Eaton
Decision by
Delegated Decision
Postcode
NR4 7QH

Timeline

Dates from the published record

  1. 10 Jun 2024

    Received by Norwich

  2. 16 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 17 Oct 2024

    Decision issued: Approved

  4. 9 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

3 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 422 Unthank Road Norwich NR4 7QH

    24/01370/TCA Submitted 25 Nov 2024 0m away

    Refer to tree specification sheet.

    Decided Trees 5 docs
  • 406 Unthank Road Norwich NR4 7QH

    24/00976/F Submitted 27 Aug 2024 0m away

    Erection of garden room outbuilding to rear garden.

    Granted Full applications 15 docs
  • 422A Unthank Road Norwich NR4 7QH

    21/01646/F Submitted 22 Nov 2021 0m away

    Extension to existing garage and two storey rear extension.

    Granted Full applications Extension
  • 422A Unthank Road Norwich NR4 7QH

    24/00893/TPO Submitted 5 Aug 2024 0m away

    G1 - 2x Maple, 3x Lime and 3x Sycamore: Internal thin of approximately 25% by removing secondary branches within crown of all trees in group.

    Granted Trees 4 docs
  • 400 Unthank Road Norwich NR4 7QH

    26/00741/TCA Submitted 27 Jul 2026 3m away

    91% historically approved · decision due ~21 Sep

    Robinia: Removal of limb which is sagging and overhangs adjacent properties gardens.

    Decided Trees
  • 422 Unthank Road Norwich NR4 7QH

    20/00650/TCA Submitted 9 Jun 2020 17m away

    T1 - Leyland cypress x 2: Fell. T2 - Eucalyptus: Fell. T3 - Leopold maple: Fell. T4 - Cherry: Fell. T5 - Western red cedar: Fell.

    Decided Trees

In Norwich

  • 26/00868/F Awaiting decision

    Pivotal House 5 Orford Yard Red Lion Street Norwich NR1 3TB

    Creating two dormers in existing hip-to-gable roof.

    2 Sep 2026 Full applications
  • 26/00869/F Awaiting decision

    Rear Of 64 - 66 Westwick Street Norwich NR2 4SZ

    Erecting a veranda at the rear of building to create a wellbeing centre.

    2 Sep 2026 Full applications
  • 26/00837/F Awaiting decision

    39 - 41 West End Street Norwich NR2 4NA

    Change of use to managers/staff accommodation, to include external alterations, new doors/windows if required.

    25 Aug 2026 Full applications
  • 26/00830/F Awaiting decision

    10 Thomas Wyatt Close Norwich NR2 2TB

    Air source heat pump and acoustic enclosure in rear garden.

    24 Aug 2026 Full applications
  • 26/00825/F Awaiting decision

    The Assembly House Theatre Street Norwich NR2 1RQ

    Creating a new entrance to the Undercroft bedroom suite from the east courtyard; installing a new cladding screen to the undercroft entrance and the elevations of Rooms 3 and 4; adjusting the boundary treatment along The Chantry with associated resurfacing; installing a new vehicular and pedestrian gate, car port and laundry room along The Chantry; installation of 5no. new air conditioning units.

    20 Aug 2026 Full applications