Skip to content
PlanIndex Get alerts
Menu

Planning application

Former Alnwick The Dukes Middle School The Dunterns Alnwick Northumberland NE66 1AJ

Awaiting decision Northumberland 26/01687/VARYCO

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of Condition 2 (Approved Plans), 29 (Permeable Paving), 30 (Permitted Devlopment Rights - Permeable Paving) and 31 (Foul Drainage) on approved application 24/03628/FUL in order to refinement of the drainage strategy to provide a more comprehensive and simplified drainage solution, including integrating the approved landscape strategy into this design and layout, updated site layout to protect the boundary tree planting and minor amendments to house-type J elevations

As published by the council, reference 26/01687/VARYCO

Application record

Reference
26/01687/VARYCO
Status
Registered
Received
13 May 2026
Validated
13 May 2026
Ward
Alnwick Hotspur
Parish
Alnwick
Decision by
Delegated Decision
Postcode
NE66 1AJ

Site history

Applications at this address on the Northumberland register

This site has had 2 applications since 2026.

  • 26/01686/DISCON Awaiting decision

    Former Alnwick The Dukes Middle School The Dunterns Alnwick Northumberland NE66 1AJ

    Discharge of Conditions 4 (Materials), 5 (Floor Levels), 8 (Construction Method Statement), 14 (Estate Street Details), 16 (Adoptable Streets), 24 (Construction Environment Management Plan) and 26 (Surface Water Disposal) of approved application 24/03628/FUL (as amended)

    Submitted 13 May 2026

Timeline

Dates from the published record

  1. 13 May 2026

    Received by Northumberland

  2. 9 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Northumberland took a median of 50 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 24/03628/FUL (Permitted)

Documents

Plans, drawings, consultee responses and the officer's report

57 documents on file for this application

  • AGENT RE UPDATES Correspondence · 09 Sep 2026
  • PROPOSED EXTERNAL FINISHES PLAN Amended Plan · 09 Sep 2026
  • PROPOSED BOUNDARY TREATMENTS PLAN Amended Plan · 09 Sep 2026
  • PROPOSED EVCP & PV LOCATION PLAN Amended Plan · 09 Sep 2026
  • DRAINAGE LAYOUT - SHEET 1 OF 2 Amended Plan · 09 Sep 2026
  • DRAINAGE LAYOUT - SHEET 2 OF 2 Amended Plan · 09 Sep 2026
  • ADDENDUM FRA & DS V3 Report/ Statement · 09 Sep 2026
  • ECOLOGY Consultee Response · 08 Sep 2026
  • BNG ASSESSMENT V2 Report/ Statement · 26 Aug 2026
  • BNG METRIC ON-SITE ONLY BNG Metric Calculation Tool · 26 Aug 2026
  • BNG METRIC OFF-SITE INCLUDED BNG Metric Calculation Tool · 26 Aug 2026
  • AGENT RESPONSE TO BHD Correspondence · 26 Aug 2026
  • ARBORICULTURAL IMPACT ASSESSMENT Report/ Statement · 26 Aug 2026
  • AIA TREE PROTECTION PLAN Plan · 26 Aug 2026
  • ARBORICULTURAL METHOD STATEMENT Report/ Statement · 26 Aug 2026
  • AMS TREE PROTECTION PLAN Plan · 26 Aug 2026
  • LLFA Consultee Response · 13 Aug 2026
  • FRA & DS V2 Report/ Statement · 23 Jul 2026
  • ENGINEERING LAYOUT - OVERALL LAYOUT Plan · 23 Jul 2026
  • ENGINEERING LAYOUT - SHEET 1 OF 2 Plan · 23 Jul 2026
  • ENGINEERING LAYOUT - SHEET 2 OF 2 Plan · 23 Jul 2026
  • LEVELS PLAN - SHEET 1 OF 2 Plan · 23 Jul 2026
  • LEVELS PLAN - SHEET 2 OF 2 Plan · 23 Jul 2026
  • PRIVATE DRAINAGE MANHOLE SCHEDULE Report/ Statement · 23 Jul 2026
  • DRAINAGE LAYOUT - SHEET 1 OF 2 Superseded · 23 Jul 2026
  • DRAINAGE LAYOUT - SHEET 2 OF 2 Superseded · 23 Jul 2026
  • FLOOD ROUTING PLAN Report/ Statement · 23 Jul 2026
  • FOOTPATHS & SHARED DRIVES SECTIONS - SHEET 2 OF 4 Plan · 23 Jul 2026
  • FOOTPATHS & SHARED DRIVES SECTIONS - SHEET 3 OF 4 Plan · 23 Jul 2026
  • ATTENUATION BASIN DETAILS Plan · 23 Jul 2026
  • SUDS IDENTIFICATION PLAN Plan · 23 Jul 2026
  • HYDRAULIC CALCULATIONS - NORTHERN SITE 2026.07.01 Report/ Statement · 23 Jul 2026
  • HYDRAULIC CALCULATIONS - SOUTHERN SITE 2026.07.01 Report/ Statement · 23 Jul 2026
  • HIGHWAYS Consultee Response · 22 Jul 2026
  • PROPOSED SITE LAYOUT Amended Plan · 15 Jul 2026
  • TOWN COUNCIL Consultee Response · 19 Jun 2026
  • HIGHWAYS Consultee Response · 09 Jun 2026
  • ECOLOGY Consultee Response · 09 Jun 2026
  • LLFA Consultee Response · 08 Jun 2026
  • ARCHAEOLOGY Consultee Response · 03 Jun 2026
  • BUILT HERITAGE AND DESIGN Consultee Response · 26 May 2026
  • NORTHUMBRIA POLICE Consultee Response · 19 May 2026
  • NORTHUMBERLAND FIRE AND RESCUE SERVICE Consultee Response · 18 May 2026
  • REDACTED Application Form · 13 May 2026
  • COVER LETTER Report/ Statement · 13 May 2026
  • PROPOSED SITE LAYOUT Superseded · 13 May 2026
  • PROPOSED COLOURED SITE LAYOUT Plan · 13 May 2026
  • PROPOSED EXTERNAL FINISHES PLAN Superseded · 13 May 2026
  • PROPOSED BOUNDARY TREATMENT PLAN Superseded · 13 May 2026
  • PROPOSED EVCP PV PLAN Superseded · 13 May 2026
  • PROPOSED PHASING PLAN Plan · 13 May 2026
  • LANDSCAPE STRATEGY PLAN Plan · 13 May 2026
  • DRAINAGE LAYOUT - SHEET 1 OF 2 Superseded · 13 May 2026
  • DRAINAGE LAYOUT - SHEET 2 OF 2 Superseded · 13 May 2026
  • REFUSE TRACKING Plan · 13 May 2026
  • HOUSE TYPE BOOKLET Plan · 13 May 2026
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Superseded · 13 May 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Northumberland for determination, against a statutory target of eight weeks. Over the last year Northumberland's median decision took 50 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Northumberland's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Former Alnwick The Dukes Middle School The Dunterns Alnwick Northumberland NE66 1AJ

    26/01686/DISCON Submitted 13 May 2026 50 yards away

    89% historically approved · decision due ~8 Jul

    Discharge of Conditions 4 (Materials), 5 (Floor Levels), 8 (Construction Method Statement), 14 (Estate Street Details), 16 (Adoptable Streets), 24 (Construction Environment Management Plan) and 26 (Surface Water Disposal) of approved application 24/03628/FUL (as amended)

    Awaiting decision 25 docs
  • Hope House Hope Terrace Alnwick Northumberland NE66 1AJ

    26/01955/TREECA Submitted 3 Jun 2026 50 yards away

    Trees in a Conservation Area: T1 (Mature Beech) requires thinning out the central crown by approximately 15% removing all crossing/rubbing limbs and deadwood. Crown lifting between 2-3m over house roof, 6-8m over roadside and 5-6m over garden

    Granted Trees 6 docs
  • Former Alnwick The Dukes Middle School The Dunterns Alnwick Northumberland NE66 1AJ

    26/01686/DISCON Submitted 13 May 2026 50 yards away

    80% historically approved · decision due ~8 Jul

    Discharge of Conditions 4 (Materials), 5 (Floor Levels), 8 (Construction Method Statement), 14 (Estate Street Details), 16 (Adoptable Streets), and 26 (Surface Water Disposal) of approved application 24/03628/FUL

    Awaiting decision Conditions 28 docs
  • Former Alnwick The Dukes Middle School The Dunterns Alnwick Northumberland NE66 1AJ

    26/01687/VARYCO Submitted 13 May 2026 50 yards away

    80% historically approved · decision due ~8 Jul

    Variation of Condition 2 (Approved Plans), 29 (Permeable Paving), 30 (Permitted Devlopment Rights - Permeable Paving) and 31 (Foul Drainage) on approved application 24/03628/FUL in order to refinement of the drainage strategy to provide a more comprehensive and simplified drainage solution, including integrating the approved landscape strategy into this design and layout, updated site layout to protect the boundary tree planting and minor amendments to house-type J elevations

    Awaiting decision Conditions 59 docs
  • Hope House Hope Terrace Alnwick Northumberland NE66 1AJ

    26/01955/TREECA Submitted 3 Jun 2026 50 yards away

    Trees in a Conservation Area: T1 (Mature Beech) requires thinning out the central crown by approximately 15% removing all crossing/rubbing limbs and deadwood. Crown lifting between 2-3m over house roof, 6-8m over roadside and 5-6m over garden

    Granted Trees 6 docs
  • 2 Percy Villas Percy Terrace Alnwick Northumberland NE66 1AF

    22/04081/LBC Submitted 2 Nov 2022 50 yards away

    Listed building consent to repair/point the rubble gable or replace concrete render with lime mix render. Middle gable replace heavily eroded stone with like for like using Whitton Fell Stone. Rebuild chimney stack Whitton Fell Stone.

    Granted Heritage and listed buildings 14 docs