Planning application

Street Record Carham Berwick Borough Footpath 011 Carham Northumberland

Awaiting decision Northumberland National Park 26/03194/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.

As published by the council, reference 26/03194/FUL

Application record

Reference
26/03194/FUL
Type
Full Application
Status
Registered
Received
9 Sep 2026
Validated
15 Sep 2026
Ward
Wooler
Parish
Carham
Decision by
Delegated Decision

Comment by 6 October 2026

The council is taking comments on this application until then. Have your say on Northumberland National Park's portal.

Site history

Applications at this address on the Northumberland National Park register

This site has had 2 applications since 2026.

  • 26/03195/LBC Awaiting decision

    Street Record Carham Berwick Borough Footpath 011 Carham Northumberland

    Listed Building Consent for temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.

    Submitted 10 Sep 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 9 Sep 2026

    Received by Northumberland National Park

  2. 15 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 17 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 10 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Northumberland National Park took a median of 38 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Balfour Beatty Agent, registered in London

Active · incorporated 1945 · London

21 applications on PlanIndex · across 7 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Northumberland National Park for determination, against a statutory target of eight weeks. Over the last year Northumberland National Park decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Street Record Panama Viaduct Carham Berwick Borough Footpath 011 Carham Northumberland

    26/02304/FUL Submitted 29 Jun 2026 0m away

    Temporary access and vegetation clearance to enable works at Bridge Pier 3. The works involve temporarily diverting the watercourse using cofferdams and a pipe to dewater the work area, excavating riverbed and bank material, and installing geotextile and rip-rap erosion protection. On completion, the riverbed and banks will be reinstated using site-won material, topsoil, biodegradable geotextile, and grass seeding to restore the area and encourage vegetation growth.

    Withdrawn Full applications 25 docs
  • Street Record Panama Viaduct Carham Berwick Borough Footpath 011 Carham Northumberland

    26/02305/LBC Submitted 29 Jun 2026 1m away

    Listed Building Consent is sought for temporary access and vegetation clearance to enable works at Bridge Pier 3. The works involve temporarily diverting the watercourse using cofferdams and a pipe to dewater the work area, excavating riverbed and bank material, and installing geotextile and rip-rap erosion protection. On completion, the riverbed and banks will be reinstated using site-won material, topsoil, biodegradable geotextile, and grass seeding to restore the area and encourage vegetation growth.

    Withdrawn Heritage and listed buildings 18 docs
  • Street Record Carham Berwick Borough Footpath 011 Carham Northumberland

    26/03195/LBC Submitted 10 Sep 2026 1m away

    90% historically approved · decision due ~10 Nov

    Listed Building Consent for temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.

    Awaiting decision Heritage and listed buildings 16 docs

In Northumberland National Park

  • 26/02540/FUL Refused

    Lyneburn House Fenrother Lane Fenrother Northumberland NE61 3DS

    Single storey side extension improving kitchen, utility and storage (retrospective)

    21 Jul 2026 Full applications
  • 26/02552/FUL Granted

    Alnwick Retail Park Taylor Drive Alnwick Northumberland

    Installation of electric vehicle charging hub with associated infrastructure including lighting/CCTV.

    21 Jul 2026 Full applications
  • 26/02535/FUL Granted

    Moor View Moor Road Prudhoe Northumberland NE42 5PB

    Single storey rear and side extension and internal reconfiguration.

    21 Jul 2026 Full applications
  • 26/02556/FUL Granted

    9 Longmeadows Darras Hall Ponteland Northumberland NE20 9DX

    Front, side and rear extensions

    21 Jul 2026 Full applications
  • 26/03259/FUL Awaiting decision

    Brook House Ridley Mill Road Stocksfield Northumberland NE43 7QU

    Erection of a two-storey pitched roof extension to replace the approved single-storey flat-roof extension on the same footprint as the previously approved scheme (ref: 24/01893/FUL)

    15 Sep 2026 Full applications