Planning application
Street Record Panama Viaduct Carham Berwick Borough Footpath 011 Carham Northumberland
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Temporary access and vegetation clearance to enable works at Bridge Pier 3. The works involve temporarily diverting the watercourse using cofferdams and a pipe to dewater the work area, excavating riverbed and bank material, and installing geotextile and rip-rap erosion protection. On completion, the riverbed and banks will be reinstated using site-won material, topsoil, biodegradable geotextile, and grass seeding to restore the area and encourage vegetation growth.
As published by the council, reference 26/02304/FUL
Application record
- Reference
- 26/02304/FUL
- Type
- Full Application
- Status
- Withdrawn
- Decision
- Withdrawn
- Received
- 29 Jun 2026
- Validated
- 9 Jul 2026
- Decided
- 3 Sep 2026
- Ward
- Wooler
- Parish
- Carham
- Decision by
- Delegated Decision
Site history
Applications at this address on the Northumberland National Park register
This site has had 2 applications since 2026.
-
26/02305/LBC Withdrawn
Street Record Panama Viaduct Carham Berwick Borough Footpath 011 Carham Northumberland
Listed Building Consent is sought for temporary access and vegetation clearance to enable works at Bridge Pier 3. The works involve temporarily diverting the watercourse using cofferdams and a pipe to dewater the work area, excavating riverbed and bank material, and installing geotextile and rip-rap erosion protection. On completion, the riverbed and banks will be reinstated using site-won material, topsoil, biodegradable geotextile, and grass seeding to restore the area and encourage vegetation growth.
Timeline
Dates from the published record
-
29 Jun 2026
Received by Northumberland National Park
-
9 Jul 2026
Validated
Checked as complete and ready for consideration.
-
15 Aug 2026
Added to PlanIndex
-
3 Sep 2026
Decision issued: Withdrawn
Related applications
Cases linked to this one on the register
- Application: 26/02305/LBC (Withdrawn)
Who's behind it
Company information only, from the register and Companies House
Balfour Beatty Agent, registered in London
Active · incorporated 1945 · London
29 applications on PlanIndex · across 10 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
- CONSULTEE COMMENT SUBMITTED ONLINE
- CONSULTEE COMMENT SUBMITTED ONLINE
- SUSTAINABILITY PLAN
- CONSULTEE COMMENT SUBMITTED ONLINE
- NATURAL ENGLAND
- CONSULTEE COMMENT SUBMITTED ONLINE
- CONSULTEE COMMENT SUBMITTED ONLINE
- CONSULTEE COMMENT SUBMITTED ONLINE
- CONSULTEE COMMENT SUBMITTED ONLINE
- CONSULTEE COMMENT SUBMITTED ONLINE
- EXISTING ELEVATIONS
- EXISTING SITE PLAN
- EXISTING SITE PLAN
- PROPOSED SITE PLAN
- FLOOD RISK ASSESSMENT
- WATERCOURSE DIVERSION CHECK
- PROPOSED SITE PLAN
- PROPOSED WORKS PLAN
- REDACTED
- PROPOSED WORKS PLAN
- PHOTOGRAPHS
- HERITAGE STATEMENT
- DESIGN AND ACCESS STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Northumberland National Park decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Street Record Carham Berwick Borough Footpath 011 Carham Northumberland
90% historically approved · decision due ~10 Nov
Temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.
Awaiting decision Full applications 22 docs -
Street Record Panama Viaduct Carham Berwick Borough Footpath 011 Carham Northumberland
Listed Building Consent is sought for temporary access and vegetation clearance to enable works at Bridge Pier 3. The works involve temporarily diverting the watercourse using cofferdams and a pipe to dewater the work area, excavating riverbed and bank material, and installing geotextile and rip-rap erosion protection. On completion, the riverbed and banks will be reinstated using site-won material, topsoil, biodegradable geotextile, and grass seeding to restore the area and encourage vegetation growth.
Withdrawn Heritage and listed buildings 18 docs -
Street Record Carham Berwick Borough Footpath 011 Carham Northumberland
89% historically approved · decision due ~10 Nov
Listed Building Consent for temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.
Awaiting decision Heritage and listed buildings 18 docs
Other full applications
In Northumberland National Park
-
26/01608/FUL Granted
Loudside Farm Eachwick Newcastle Upon Tyne Northumberland NE18 0BJ
Conversion of agricultural buildings to provide enlargement of residential dwelling, new build extension to west gable, rear and change of use of areas of agricultural land to residential curtilage
-
26/02874/COU Granted
Unit 1 Birchwood Way Ashwood Business Park Ashington Northumberland NE63 0XD
Change of use from Catergory E(D) back to B2/B8 industrial
-
26/03019/FUL Granted
Percy Arms Hotel Main Road Chatton Alnwick Northumberland NE66 5PS
Proposed installation of Georgian style door and fixed side screen to replace the existing west elevation window and provision of new internal bar
-
26/03549/FUL Awaiting decision
Bari Tea 28 Narrowgate Alnwick Northumberland NE66 1JG
Full planning permission for structural repair, stabilisation works and associated conservation works
-
26/02856/FUL Granted
King Edward Vi School, Morpeth Adult Learning Centre Cottingwood Lane Morpeth Northumberland NE61 1DN
Change of Use of Morpeth Adult Learning Centre into a single family dwelling