Skip to content
PlanIndex Get alerts
Menu

Planning application

White Swan Hotel Market Place Pickering YO18 7AA

Awaiting decision North Yorkshire ZE26/00256/FUL Full Application

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 8no. residential apartments and change of use of existing letting accommodation for residential use with associated parking, plus installation of solar panels

As published by the council, reference ZE26/00256/FUL

Application record

Reference
ZE26/00256/FUL
Type
Full Application
Status
Registered
Received
24 Mar 2026
Validated
11 May 2026
Ward
Pickering
Parish
Pickering Town Council
Decision by
Delegatable Decision
Postcode
YO18 7AA

Timeline

Dates from the published record

  1. 24 Mar 2026

    Received by North Yorkshire

  2. 11 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 4 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    North Yorkshire took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

33 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with North Yorkshire for determination, against a statutory target of eight weeks. Over the last year North Yorkshire decided full applications in a median of 74 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • White Swan Hotel Market Place Pickering North Yorkshire YO18 7AA

    ZE26/00423/LBC Submitted 13 May 2026 0m away

    88% historically approved · decision due ~8 Jul

    Change of use of existing Bothy building to a one bedroom dwelling, plus installation of solar panels

    Awaiting decision Heritage and listed buildings 7 docs
    Domestic
  • White Swan Hotel Market Place Pickering YO18 7AA

    ZE26/00256/FUL Submitted 24 Mar 2026 0m away

    91% historically approved · decision due ~6 Jul

    Erection of 8no. residential apartments and change of use of existing letting accommodation for residential use with associated parking, plus installation of solar panels

    Awaiting decision Full applications New dwelling 33 docs
  • White Swan Hotel Market Place Pickering North Yorkshire YO18 7AA

    ZE26/00423/LBC Submitted 13 May 2026 0m away

    86% historically approved · decision due ~8 Jul

    Change of use of existing Bothy building to a one bedroom dwelling, plus installation of solar panels

    Awaiting decision Heritage and listed buildings 7 docs
    Domestic
  • White Swan Hotel Market Place Pickering YO18 7AA

    ZE26/00256/FUL Submitted 24 Mar 2026 0m away

    91% historically approved · decision due ~6 Jul

    Erection of 8no. residential apartments and change of use of existing letting accommodation for residential use with associated parking, plus installation of solar panels

    Awaiting decision Full applications New dwelling 33 docs
  • White Swan Hotel Market Place Pickering North Yorkshire YO18 7AA

    ZE26/00423/LBC Submitted 13 May 2026 0m away

    86% historically approved · decision due ~8 Jul

    Change of use of existing Bothy building to a one bedroom dwelling, plus installation of solar panels

    Awaiting decision Heritage and listed buildings 7 docs
    Domestic
  • Pickering Post Office 7 Market Place Pickering North Yorkshire YO18 7AA

    ZE26/00544/LBC Submitted 1 Jul 2026 31m away

    86% historically approved · decision due ~26 Aug

    Repainting of the primary (south) facade (Retrospective)

    Awaiting decision Heritage and listed buildings 10 docs

In North Yorkshire

  • 26/01023/FUL Granted

    26 Rossett Green Lane Harrogate North Yorkshire HG2 9LH

    Demolition of existing Garage. Erection of first floor side extension, part two-storey, part single-storey rear extension, two-storey front extension, loft conversion and new detached garage with studio over. Alterations to fenestration. Widening of existing highway crossing and erection entrance gates, gate posts and railings. Widening of existing driveway.

    27 Feb 2026 Full applications
  • ZE26/00152/MFUL Granted

    Land At 477211 470238 York Road Malton North Yorkshire

    Erection of factory and energy centre with all associated works

    23 Feb 2026 Full applications
  • ZD25/00633/FULL Granted

    Greystones Market Place Middleham Leyburn North Yorkshire DL8 4NR

    Householder application for rooftop solar PV and ground mounted air source heat pump installation

    11 Nov 2025 Full applications
  • 25/04211/FUL Refused

    41 Gap Road Hunmanby Gap Filey North Yorkshire YO14 9QP

    Erection of 1 no. dwelling following demolition of existing dwelling

    28 Nov 2025 Full applications
  • ZE26/00730/MFUL Awaiting decision

    Land West Of Outgang Lane Pickering North Yorkshire

    Erection of 92 dwellings and associated infrastructure, landscaping and open space

    25 Aug 2026 Full applications