Planning application
Land Comprising Former Prisoner Of War Camp Walshford Corner Cottages To Deighton Gates Kirk Deighton North Yorkshire LS22 5HH
Works: New dwelling Demolition Several homes
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
The redevelopment of prisoner of war hostel and agricultural land, including the demolition structures, apart from existing water tower (to be retained) and the construction of three new dwellings and new access, with landscaping and associated works.
As published by the council, reference 26/03699/FUL
Application record
- Reference
- 26/03699/FUL
- Category
- Full applications
- Status
- Registered
- Received
- 6 Jul 2026
- Validated
- 20 Jul 2026
- Postcode
- LS22 5HH
Timeline
Dates from the published record
-
6 Jul 2026
Received by North Yorkshire
-
20 Jul 2026
Validated
Checked as complete and ready for consideration.
-
4 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Yorkshire took a median of 57 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with North Yorkshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land Comprising Former Prisoner Of War Camp Walshford Corner Cottages To Deighton Gates Kirk Deighton North Yorkshire LS22 5HH
91% historically approved · decision due ~14 Sep
The redevelopment of prisoner of war hostel and agricultural land, including the demolition structures, apart from existing water tower (to be retained) and the construction of three new dwellings and new access, with landscaping and associated works.
Awaiting decision Full applications New dwelling Demolition 46 docsSeveral homes -
Land Comprising Former Prisoner Of War Camp Walshford Corner Cottages To Deighton Gates Kirk Deighton North Yorkshire LS22 5HH
91% historically approved · decision due ~14 Sep
The redevelopment of prisoner of war hostel and agricultural land, including the demolition structures, apart from existing water tower (to be retained) and the construction of three new dwellings and new access, with landscaping and associated works.
Awaiting decision Full applications New dwelling Demolition 36 docsSeveral homes -
Midway House Loshpot Lane Kirk Deighton Wetherby North Yorkshire LS22 5HJ
Two storey side extension, single storey rear extension, alterations to existing front porch, loft conversion with roof lights and dormers to front and rear and erection of detached garage/carport with room in roof.
Granted Full applications Extension Loft or dormer 18 docsSmall domestic -
Midway House Loshpot Lane Kirk Deighton Wetherby North Yorkshire LS22 5HJ
Two storey side extension, single storey rear extension, alterations to existing front porch, loft conversion with roof lights and dormers to front and rear and erection of detached garage/carport with room in roof.
Granted Full applications Extension Loft or dormer 18 docsSmall domestic -
Midway House Loshpot Lane Kirk Deighton Wetherby North Yorkshire LS22 5HJ
Two storey side extension, single storey rear extension, alterations to existing front porch, loft conversion with roof lights and dormers to front and rear and erection of detached garage/carport with room in roof.
Granted Full applications Extension Loft or dormer 18 docsSmall domestic
Other full applications applications
In North Yorkshire
-
26/01023/FUL Granted
26 Rossett Green Lane Harrogate North Yorkshire HG2 9LH
Demolition of existing Garage. Erection of first floor side extension, part two-storey, part single-storey rear extension, two-storey front extension, loft conversion and new detached garage with studio over. Alterations to fenestration. Widening of existing highway crossing and erection entrance gates, gate posts and railings. Widening of existing driveway.
-
ZE26/00152/MFUL Granted
Land At 477211 470238 York Road Malton North Yorkshire
Erection of factory and energy centre with all associated works
-
ZD25/00633/FULL Granted
Greystones Market Place Middleham Leyburn North Yorkshire DL8 4NR
Householder application for rooftop solar PV and ground mounted air source heat pump installation
-
25/04211/FUL Refused
41 Gap Road Hunmanby Gap Filey North Yorkshire YO14 9QP
Erection of 1 no. dwelling following demolition of existing dwelling
-
ZE26/00730/MFUL Awaiting decision
Land West Of Outgang Lane Pickering North Yorkshire
Erection of 92 dwellings and associated infrastructure, landscaping and open space