Planning application
Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
Works: Demolition Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of 5 brick boundary wall planters, part demolition of the station yard boundary wall and removal of stone flags
As published by the council, reference 26/02820/LB
Application record
- Reference
- 26/02820/LB
- Type
- Listed Building consent
- Status
- Awaiting decision
- Received
- 3 Jun 2026
- Validated
- 12 Jun 2026
- Ward
- Castle
- Parish
- Scarborough
- Postcode
- YO11 1TN
Site history
Applications at this address on the North York Moors National Park register
This site has had 3 applications since 2025: 1 approved, 0 refused.
-
25/04675/LB Granted
Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
Installation of a new CCTV system comprising forty-one CCTV cameras removal of all cameras that are being replaced, along with redundant cabling, containment and conduit, and to make good legacy damage
-
25/03921/RG3 Awaiting decision
Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
Public realm improvements to Scarborough Station forecourt, including alterations to accessible parking, taxi rank and drop-off areas, together with the creation of a pedestrian plaza and changes to pedestrian areas at the junction of Westborough, Northway and Valley Bridge Road.
Timeline
Dates from the published record
-
3 Jun 2026
Received by North York Moors National Park
-
12 Jun 2026
Validated
Checked as complete and ready for consideration.
-
2 Aug 2026
Added to PlanIndex
-
18 Aug 2026
Status changed to Awaiting decision
Previously Registered.
-
Decision
Awaiting decision
Decision expected by 7 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North York Moors National Park took a median of 57 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Align Property Services Ltd Agent, registered in Northallerton
Active · incorporated 2023 · Northallerton
84 applications on PlanIndex · across 3 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with North York Moors National Park for determination, against a statutory target of eight weeks. Over the last year North York Moors National Park decided heritage and listed building applications in a median of 100 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
88% historically approved · decision due ~7 Aug
Demolition of 5 brick boundary wall planters, part demolition of the station yard boundary wall and removal of stone flags
Awaiting decision Heritage and listed buildings Demolition 15 docsSmall domestic -
Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
91% historically approved · decision due ~26 Jan
Public realm improvements to Scarborough Station forecourt, including alterations to accessible parking, taxi rank and drop-off areas, together with the creation of a pedestrian plaza and changes to pedestrian areas at the junction of Westborough, Northway and Valley Bridge Road.
Awaiting decision 81 docs -
Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
91% historically approved · decision due ~26 Jan
Public realm improvements to Scarborough Station forecourt, including alterations to accessible parking, taxi rank and drop-off areas, together with the creation of a pedestrian plaza and changes to pedestrian areas at the junction of Westborough, Northway and Valley Bridge Road.
Awaiting decision 81 docs -
Network Rail Ltd Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
86% historically approved · decision due ~9 Nov
Installation of a new permanent electrical supply, associated distribution equipment, underground cable routes, cable containment systems and ancillary electrical infrastructure, together with the removal of the existing standby diesel generator and fuel storage tank
Decided Heritage and listed buildings -
Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
86% historically approved · decision due ~7 Aug
Demolition of 5 brick boundary wall planters, part demolition of the station yard boundary wall and removal of stone flags
Decided Heritage and listed buildings DemolitionSmall domestic -
Central Railway Station Westborough Scarborough North Yorkshire YO11 1TN
91% historically approved · decision due ~26 Jan
Public realm improvements to Scarborough Station forecourt, including alterations to accessible parking, taxi rank and drop-off areas, together with the creation of a pedestrian plaza and changes to pedestrian areas at the junction of Westborough, Northway and Valley Bridge Road.
Decided 81 docs
Other heritage and listed building applications
In North York Moors National Park
-
ZE26/00311/LBC Granted
Hovingham Church Of England Primary School Main Street Hovingham North Yorkshire YO62 4LF
Change of Use of former primary school to form offices and associated works including, removal of stud walls and installation of partitions, reconfiguration of WCs and installation of accessible WC, installation of kitchenette, resurfacing of courtyard and inclusion of a section of first floor level accommodation associated with the former primary school to form additional residential accommodation associated with School House.
-
ZE26/00064/LBC Granted
Pear Tree Villa High Street Wrelton North Yorkshire YO18 8PG
Replace all existing windows with double glazed units, relocation of existing boiler flue to ground floor level on the east elevation, removal of gas pipe on the north elevation and repair of existing outhouse door (retrospective)
-
ZD25/00278/LBC Granted
Officers Mess - GAZA 28 Jaffa Road Hipswell Catterick Garrison North Yorkshire DL9 4AU
Listed Building Consent to repair and replace internal doors and frames that are currently a mixture of colours and constructed from either solid wood or mixed materials that do not currently hold the required fire rating, with modern manufactured internal doors which are FD30 and made from solid hard wood incorporating fire resistant glass where required
-
ZE26/00784/LBC Awaiting decision
The Black Swan Hotel 18 Birdgate Pickering North Yorkshire YO18 7AL
Installation of waterproof barrier to prevent water reaching the wall, to maintain a breathable zone adjacent to existing stonework and protect the basement from water ingress. In addition to repointing of the internal and external walls of the basement using lime mortar
-
25/04315/LB Granted
Royal Hotel West Cliff Whitby North Yorkshire YO21 3HA
External painting of the east, north and west elevation of the building together with the boundary walls, railings and re-painting of the timber windows and doors