Skip to content
PlanIndex Get alerts
Menu

Planning application

Land East Of Failand Weston Road Failand BS8 3US

Awaiting decision North Somerset 26/P/0188/OUT Outline Application

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Outline planning permission for residential development for up to 330 dwellings including 300 sq.m of Class E floorspace, land reserved for educational use, a mobility hub, car park, public open space, relocation of the Failand Observatory, landscaping, highway and associated infrastructure works, with the proposed access provided in detail, other matters of appearance, landscaping, layout and scale are reserved for subsequent approval

As published by the council, reference 26/P/0188/OUT

Application record

Reference
26/P/0188/OUT
Type
Outline Application
Status
Registered
Received
28 Jan 2026
Validated
16 Feb 2026
Ward
Long Ashton
Parish
Long Ashton
Postcode
BS8 3US

Timeline

Dates from the published record

  1. 28 Jan 2026

    Received by North Somerset

  2. 16 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    North Somerset took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Boyer Ltd. Agent

198 applications on PlanIndex · across 53 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

107 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with North Somerset for determination, against a statutory target of eight weeks. Over the last year North Somerset decided outline applications in a median of 57 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Ashton Hill House Weston Road Failand Bristol BS8 3US

    21/P/0998/FUH Submitted 1 Apr 2021 0m away

    Creation of driveway and new vehicular access.

    Granted Householder 11 docs
    Domestic
  • Land East Of Failand Weston Road Failand BS8 3US

    26/P/0188/OUT Submitted 28 Jan 2026 0m away

    66% historically approved · decision due ~13 Apr

    Outline planning permission for residential development for up to 330 dwellings including 300 sq.m of Class E floorspace, land reserved for educational use, a mobility hub, car park, public open space, relocation of the Failand Observatory, landscaping, highway and associated infrastructure works, with the proposed access provided in detail, other matters of appearance, landscaping, layout and scale are reserved for subsequent approval

    Awaiting decision Outline New dwelling 107 docs
    Major scheme
  • Ashton Hill House Weston Road Failand Bristol BS8 3US

    21/P/1364/FUH Submitted 7 May 2021 0m away

    Proposed single story rear extension and front entrance hall extension. Replacement of existing roof tiles and associated external alterations.

    Granted Householder Extension Roofing 12 docs
    Domestic
  • Ashton Hill House Weston Road Failand BS8 3US

    26/P/0721/FUH Submitted 31 Mar 2026 0m away

    Proposed formation of a secondary vehicular access and (retrospective) non-material amendment to ref. 21/P/0998/FUH to allow for change in the access design along Weston Road as constructed on site.

    Granted Householder 10 docs
    Domestic
  • Ashton Hill House Weston Road Failand Bristol BS8 3US

    21/P/1364/FUH Submitted 7 May 2021 0m away

    Proposed single story rear extension and front entrance hall extension. Replacement of existing roof tiles and associated external alterations.

    Granted Householder Extension Roofing 12 docs
    Domestic
  • Ashton Hill House Weston Road Failand Bristol BS8 3US

    21/P/0998/FUH Submitted 1 Apr 2021 0m away

    Creation of driveway and new vehicular access.

    Granted Householder 11 docs
    Domestic

In North Somerset

  • 26/P/1738/OUT Awaiting decision

    Heath Cottage Old Weston Road Congresbury BS49 5ED

    Outline planning permission for the removal of an existing outbuilding and erection of a detached two storey dwelling, with access for approval (Appearance, landscaping, layout and scale reserved for subsequent approval)

    24 Aug 2026 Outline
  • 26/P/0750/PIP Refused

    F Sweeting And Sons Station Road Sandford Winscombe BS25 5RQ

    Permission in principle for the demolition of existing industrial buildings and erection of 9no. dwellings

    2 Apr 2026 Outline
  • 26/P/0881/CM2A Granted

    Lloyds Tsb Bank Plc Combe Road Portishead BS20 6BJ

    Application to determine if prior approval is required for the change of use of former bank staff room and toilets to 1no. one bedroom self contained flat

    27 Apr 2026 Outline
  • 26/P/0256/CM2A Granted

    2 North Lane Weston-super-Mare BS23 1QR

    Determination as to whether Prior Approval is required for the change of use of part of property from Use Class E (g)(i) offices to 1no. dwelling (Use Class C3)

    4 Feb 2026 Outline
  • 26/P/0930/AGA Granted

    Seawall Farm Lower Strode Road Clevedon BS21 6UX

    Application to determine if prior approval is required for the proposed erection of an agricultural steel framed building for the storage of straw and agricultural machinery in connection with the established farming operations at Seawall Farm.

    1 May 2026 Outline