Planning application
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Formal submission to discharge Requirement 15 (Reinstatement schemes) for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
As published by the council, reference 25/P/1772/DCM
Application record
- Reference
- 25/P/1772/DCM
- Type
- Development Consent Order - Major
- Status
- Decided
- Decision
- Approve
- Received
- 28 Aug 2025
- Validated
- 28 Aug 2025
- Decided
- 21 Oct 2025
- Parish
- Unparished
- Decision by
- Delegated Decision
Site history
Applications at this address on the North Somerset register
This site has had 30 applications since 2019: 29 approved, 0 refused.
-
26/P/1813/DCM Awaiting decision
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 10 (Replacement Planting) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
26/P/1284/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to extend the time for discharge of Requirements 15 (Reinstatement schemes) and 20 (Removal of temporary bridges and culverts) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
26/P/0912/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to extend the time to discharge Requirements 15 (Reinstatement schemes) and 20 (Removal of temporary bridges and culverts) for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/2633/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 15 (Reinstatement schemes) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/1750/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 22 (Highway Works (Bellmouth Design)) for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/1749/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 5(2)(d) (Construction Traffic Management Plan Addendum) for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
23/P/0407/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal Submission to discharge of Requirement 6(1)(f) (Emergency Response Plan for Flood Events for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as amended)
-
23/P/0240/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
22/P/2976/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 10 (Scheme of Replacement Planting for Stage 8 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
22/P/2194/DCO Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal Submission to discharge of Requirement 20 (Removal of temporary bridges and culverts for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016
Timeline
Dates from the published record
-
28 Aug 2025
Received by North Somerset
-
21 Oct 2025
Decision issued: Approve
-
26 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Arup Agent, registered in London
Active · incorporated 1990 · London
205 applications on PlanIndex · across 47 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
North Somerset granted permission on 21 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In North Somerset
-
26/P/0871/FUL Granted
8 Upper Church Road Weston-super-Mare BS23 2DT
Proposed change of use of existing Class E property to form 1no. self-contained flat including alterations to fenestration.
-
26/P/1320/FUL Granted
Ground Floor 40 Clevedon Road Weston-super-Mare BS23 1DQ
Proposed addition of insulation and new finish to the rear flat roof not exceeding more than 150mm in height from existing flat roof line.
-
26/P/1527/FUL Granted
Waterloo Hall 17 Waterloo Street Weston-super-Mare BS23 1LF
Proposed alterations to existing entrance to provide level access
-
26/P/1428/FUL Granted
Former YHC Hire Solutions Site Searle Crescent Weston-super-Mare BS23 3XP
Sub-division of existing warehouse into 2no units. Change of use of warehouse from B8 use, with unit 1 to be used as car sales (sui generis) and unit 2 to a community transport centre (sui generis). Alterations to external appearance of building.
-
26/P/1571/FUL Granted
Unit 7 Old Mill Road Portishead BS20 7BX
Proposed removal of the existing Asbestos cement roof sheets and erection of a new built up steel profiled roof system, raising the ridge line by circa 100mm.