Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

Granted North Somerset 25/P/1749/DCM Development Consent Order - Major

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Formal submission to discharge Requirement 5(2)(d) (Construction Traffic Management Plan Addendum) for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

As published by the council, reference 25/P/1749/DCM

Application record

Reference
25/P/1749/DCM
Type
Development Consent Order - Major
Status
Decided
Decision
Approve
Received
26 Aug 2025
Validated
26 Aug 2025
Decided
21 Oct 2025
Parish
Unparished
Decision by
Delegated Decision

Site history

Applications at this address on the North Somerset register

This site has had 30 applications since 2019: 29 approved, 0 refused.

  • 26/P/1813/DCM Awaiting decision

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth

    Formal submission to discharge Requirement 10 (Replacement Planting) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

    Submitted 4 Sep 2026
  • 26/P/1284/DCM Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

    Formal submission to extend the time for discharge of Requirements 15 (Reinstatement schemes) and 20 (Removal of temporary bridges and culverts) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

    Decided 20 Aug 2026
  • 26/P/0912/DCM Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

    Formal submission to extend the time to discharge Requirements 15 (Reinstatement schemes) and 20 (Removal of temporary bridges and culverts) for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

    Decided 18 Jun 2026 Full applications
  • 25/P/2633/DCM Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth

    Formal submission to discharge Requirement 15 (Reinstatement schemes) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

    Decided 29 Apr 2026 Full applications
  • 25/P/1772/DCM Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth

    Formal submission to discharge Requirement 15 (Reinstatement schemes) for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

    Decided 21 Oct 2025 Full applications
  • 25/P/1750/DCM Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth

    Formal submission to discharge Requirement 22 (Highway Works (Bellmouth Design)) for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

    Decided 17 Oct 2025 Full applications
  • 23/P/0407/DCM Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

    Formal Submission to discharge of Requirement 6(1)(f) (Emergency Response Plan for Flood Events for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as amended)

    Decided 18 Apr 2023 Full applications
  • 23/P/0240/DCM Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

    Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

    Decided 25 Apr 2023 Full applications
  • 22/P/2976/DCM Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

    Formal submission to discharge Requirement 10 (Scheme of Replacement Planting for Stage 8 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

    Decided 6 Feb 2023 Full applications
  • 22/P/2194/DCO Granted

    Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth

    Formal Submission to discharge of Requirement 20 (Removal of temporary bridges and culverts for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016

    Decided 15 Mar 2023

Timeline

Dates from the published record

  1. 26 Aug 2025

    Received by North Somerset

  2. 21 Oct 2025

    Decision issued: Approve

  3. 26 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Arup Agent, registered in London

Active · incorporated 1990 · London

205 applications on PlanIndex · across 47 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

North Somerset granted permission on 21 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In North Somerset

  • 26/P/0871/FUL Granted

    8 Upper Church Road Weston-super-Mare BS23 2DT

    Proposed change of use of existing Class E property to form 1no. self-contained flat including alterations to fenestration.

    24 Apr 2026 Full applications
  • 26/P/1320/FUL Granted

    Ground Floor 40 Clevedon Road Weston-super-Mare BS23 1DQ

    Proposed addition of insulation and new finish to the rear flat roof not exceeding more than 150mm in height from existing flat roof line.

    23 Jun 2026 Full applications
  • 26/P/1527/FUL Granted

    Waterloo Hall 17 Waterloo Street Weston-super-Mare BS23 1LF

    Proposed alterations to existing entrance to provide level access

    21 Jul 2026 Full applications
  • 26/P/1428/FUL Granted

    Former YHC Hire Solutions Site Searle Crescent Weston-super-Mare BS23 3XP

    Sub-division of existing warehouse into 2no units. Change of use of warehouse from B8 use, with unit 1 to be used as car sales (sui generis) and unit 2 to a community transport centre (sui generis). Alterations to external appearance of building.

    7 Jul 2026 Full applications
  • 26/P/1571/FUL Granted

    Unit 7 Old Mill Road Portishead BS20 7BX

    Proposed removal of the existing Asbestos cement roof sheets and erection of a new built up steel profiled roof system, raising the ridge line by circa 100mm.

    28 Jul 2026 Full applications