Planning application
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Formal Submission to discharge of Requirement 6(1)(b) (Drainage Management Plan for Stage 2.1 of the authorised development) and 17 (Surface Water Drainage for Stage 2.1 of the authorised development) and 19 (Inspection of Temporary Watercourses for Stage 2.1 of the authorised development) and 21 (Accumulation and Deposits for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended)
As published by the council, reference 19/P/2898/DCM
Application record
- Reference
- 19/P/2898/DCM
- Type
- Development Consent Order - Major
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 20 Nov 2019
- Validated
- 20 Nov 2019
- Decided
- 20 Dec 2019
- Parish
- Unparished
- Decision by
- Delegated Decision
Site history
Applications at this address on the North Somerset register
This site has had 30 applications since 2019: 29 approved, 0 refused.
-
26/P/1813/DCM Awaiting decision
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 10 (Replacement Planting) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
26/P/1284/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to extend the time for discharge of Requirements 15 (Reinstatement schemes) and 20 (Removal of temporary bridges and culverts) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
26/P/0912/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to extend the time to discharge Requirements 15 (Reinstatement schemes) and 20 (Removal of temporary bridges and culverts) for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/2633/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 15 (Reinstatement schemes) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/1772/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 15 (Reinstatement schemes) for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/1750/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 22 (Highway Works (Bellmouth Design)) for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/1749/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 5(2)(d) (Construction Traffic Management Plan Addendum) for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
23/P/0407/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal Submission to discharge of Requirement 6(1)(f) (Emergency Response Plan for Flood Events for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as amended)
-
23/P/0240/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
22/P/2976/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 10 (Scheme of Replacement Planting for Stage 8 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
Timeline
Dates from the published record
-
20 Nov 2019
Received by North Somerset
-
20 Dec 2019
Decision issued: Approve
-
22 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Somerset granted permission on 20 December 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In North Somerset
-
26/P/0895/FUL Granted
85 High Street Nailsea BS48 1AW
Proposed conversion of first floor to form 1no. 1-bed flat including the erection of a rear extension.
-
25/P/1418/FUL Granted
Land To South Of Yew Tree Farm Yew Tree Lane Kingston Seymour BS21 6XG
Installation of a solar farm comprising ground mounted solar PV panels with a generating capacity of up to 49.99MW(AC) with connection to new substation located on land to south of Puxton Road, Puxton; works to include mounting system, inverters, substations, underground cabling, stock proof fence, CCTV, internal tracks and associated infrastructure, landscaping, biodiversity net gain and environmental enhancements for a temporary period of 50 years.
-
25/P/2043/FUL Granted
Oxford Plasma Technology North End Road Yatton BS49 4AP
Residential redevelopment comprising the demolition of existing buildings and the erection of 58no. houses; and associated access improvements; car parking; engineering works, and hard/soft landscape works
-
26/P/0717/FUL Granted
Tyntesfield House Tyntesfield Wraxall BS48 1NX
Proposed connection of existing Mansion power supply to a borehole North-East of the former lake to facilitate a water supply to the Rose Garden, West Lawns and Southern Terrace utilising combined trenches below existing pathways.
-
26/P/0379/FUL Granted
45 Clevedon Road Tickenham Clevedon BS21 6RB
Proposed erection of a self-build dwelling following demolition of the existing dwelling and garage. Erection of detached garage and ground mounted solar panels.