Planning application
3A And 5 Bearton Avenue Hitchin Hertfordshire SG5 1NZ
Works: New dwelling Extension Loft or dormer Demolition Windows or glazing Several homes
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Conversion of existing 4 flats into two self-contained 4-bed dwellings including single storey rear and side extensions, insertion of rear dormer windows to facilitate conversion of loft space to habitable accommodation following demolition of existing detached double garage. Installation of boundary fences to 3A. Installation of rear hardstanding, provision of rear 6 parking spaces and two front parking spaces and formation of vehicular accesses off Bearton Avenue.
As published by the council, reference 26/02040/FP
Application record
- Reference
- 26/02040/FP
- Category
- Full applications
- Status
- Registered
- Received
- 15 Sep 2026
- Validated
- 15 Sep 2026
- Postcode
- SG5 1NZ
Timeline
Dates from the published record
-
15 Sep 2026
Received by North Hertfordshire
-
17 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Hertfordshire took a median of 48 days over the applications it decided in the last year.
What happens while it is decided
This application is with North Hertfordshire for determination, against a statutory target of eight weeks. Over the last year North Hertfordshire decided full applications in a median of 62 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
3 Bearton Avenue Hitchin Hertfordshire SG5 1NZ
Erection of one detached 3-bed dwelling. (Development already carried out).
Granted Full applications 11 docsDomestic -
6 Bearton Avenue Hitchin Hertfordshire SG5 1NZ
Single storey side extension linking garage to existing dwelling. Alterations to existing garage to include rear extension and alterations to fenestration following removal of existing garage doors to facilitate garage conversion into habitable accommodation. Insertion of rear dormer window, front and side rooflights to facilitate loft conversion. Replacement roof to existing single storey rear element and insertion of rooflight. Alterations to fenestration and insertion of first floor rear dormer window.
Granted Householder Extension Loft or dormer +2 7 docsSmall domestic -
58 Fishponds Road Hitchin Hertfordshire SG5 1NS
T1: Silver Birch - Reduce in height by approx 3m to viable growth points and bring the sides into shape. T2: Field Maple - Reduce in height by approx 2-3m to viable growth points and bring the sides into shape. T3 : Magnolia - Reduce overlong branches to match the average outline of the canopy. Remove excessive weight
Granted Trees 7 docs -
Hitchin Town Football Club Bedford Road Hitchin Hertfordshire SG5 2TY
Replace wooden terracing with metal modular terracing.
Granted Full applications 10 docs -
33 Lancaster Avenue Hitchin Hertfordshire SG5 1PA
Single storey rear/side extension
Granted Householder Extension 8 docsSmall domestic -
23 Lancaster Road Hitchin Hertfordshire SG5 1PD
Single storey side/rear extension
Granted Householder Extension 8 docsSmall domestic
Other full applications
In North Hertfordshire
-
26/02233/FP Awaiting decision
38 Broadway Letchworth Garden City Hertfordshire SG6 3BX
Replacement shopfront.
-
26/02122/FP Awaiting decision
25 Lower Road Breachwood Green Hitchin Hertfordshire SG4 8NS
Erection of four dwellings including landscaping, parking, cycle stores and installation of four air source heat pumps. Creation of vehicular access off Lower Road.
-
26/00612/FP Decided
The Biggin Queen Street Hitchin Hertfordshire SG5 1AB
Installation of perimeter railing, gate and wall following removal of existing fence. Installation of free-standing Air Source Heat Pump and associated enclosure, new bin and cycle store together with hard and soft landscaping works including low-level lighting (as amended by plans received on 10/09/2026).
-
26/01636/FP Awaiting decision
22-24 High Street Kimpton Hitchin Hertfordshire SG4 8RJ
Alterations to existing roof and structure including insertion of rooflights and replacement windows.
-
26/02049/FP Awaiting decision
Hitchin Rugby Football Club King George V Playing Field Old Hale Way Hitchin Hertfordshire SG5 1XL
Installation of floodlights and 6 lighting columns.