Planning application
Part Of 10-12 Wallace Way Hitchin Hertfordshire SG4 0SE
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of existing industrial building (B2) to use as a Gymnasium club
As published by the council, reference 26/02609/FP
Application record
- Reference
- 26/02609/FP
- Category
- Full applications
- Status
- Registered
- Received
- 27 Oct 2026
- Validated
- 27 Oct 2026
- Postcode
- SG4 0SE
Timeline
Dates from the published record
-
27 Oct 2026
Received by North Hertfordshire
-
28 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Hertfordshire took a median of 48 days over the applications it decided in the last year.
What happens while it is decided
This application is with North Hertfordshire for determination, against a statutory target of eight weeks. Over the last year North Hertfordshire decided full applications in a median of 67 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land At New Pound Farm East Side Of Old Hale Way Hitchin Hertfordshire SG4 0SA
Erection of one detached dwelling.
Decided Full applications New dwelling 14 docsDomestic -
Land Adjacent To Unit 3 On The West Side Of Cadwell Lane Hitchin Hertfordshire SG4 0SA
Use of land for the siting of 20 No. steel shipping containers for long-term self-storage (Use Class B8) with associated palisade security fencing, vehicular access gates, external lighting, CCTV and hard surface (amended plans received 21/10/2022 and 20/01/2023).
Granted Full applications -
National Grid Cadwell Lane Hitchin Hertfordshire SG4 0SL
Demolition of gasholder and associated structure.
Granted Other Demolition 9 docs -
Telecommunications Mast National Grid Cadwell Lane Hitchin Hertfordshire
Notification under the Electronic Communications Code Regulations of the intention to install Upgraded Electronic Communications Apparatus. Removal of 6 no. antenna and installation of 9 no. replacement antenna and ancillary radio equipment onto existing supporting poles at existing lattice mast and associated ancillary development thereto
Granted 5 docs -
Unit 9 Cam Centre Wilbury Way Hitchin Hertfordshire SG4 0TW
80% historically approved · decision due ~2 Nov
Change of use and conversion of existing outbuilding from industrial storage unit to skills training centre and associated gymnasium centre including Installation of air conditioning unit and alterations to fenestration and external cladding.
Awaiting decision Full applications Windows or glazing -
Unit 14 Cam Centre Wilbury Way Hitchin Hertfordshire SG4 0TW
Change of Use to include Sui generis (R) - Hot food takeaway
Granted Full applications 7 docs
Other full applications
In North Hertfordshire
-
26/02233/FP Decided
38 Broadway Letchworth Garden City Hertfordshire SG6 3BX
Replacement shopfront.
-
26/02039/FP Decided
77 Park Lane Old Knebworth Knebworth Hertfordshire SG3 6PP
Erection of one detached three-bedroom dwelling including detached double garage with Air Source Heat Pump and soft and hard landscaping works following demolition of existing detached structures.
-
26/02527/FP Awaiting decision
Land To The West Of London Road Barkway Hertfordshire SG8 8EY
Erection of stables and menage and installation gravel drive and replace existing access gates.
-
26/01819/FP Decided
Health Centre Bedford Road Hitchin Hertfordshire SG5 1HF
Installation of air source heat pump and acoustic enclosure.
-
26/02568/FP Awaiting decision
Royston Leisure Centre Woodcock Road Royston Hertfordshire SG8 7XT
Erection of a single-storey learner pool extension to the east elevation of Royston Leisure Centre, including changing facilities, filtration plant and stores, installation of an air source heat pump and roof-mounted photovoltaic panels, relocation of the staff covered cycle store, alterations to the kerb line, and associated works.