Skip to content
PlanIndex Get alerts
Menu

Planning application

Dunston Trading Estate, Units 20 and 21 Foxwood Road Sheepbridge Chesterfield S41 9RF

Refused North East Derbyshire CHE/21/00431/FUL Full Application

Works: Extension

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Canopy extension in existing service yard

As published by the council, reference CHE/21/00431/FUL

Application record

Reference
CHE/21/00431/FUL
Type
Full Application
Status
Decided
Decision
refused
Received
7 Jun 2021
Validated
15 Jun 2021
Decided
26 Aug 2021
Ward
Dunston
Decision by
Delegated Decision
Postcode
S41 9RF

Timeline

Dates from the published record

  1. 7 Jun 2021

    Received by North East Derbyshire

  2. 15 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 26 Aug 2021

    Decision issued: refused

  4. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In North East Derbyshire

  • CHE/26/00522/FUL Withdrawn

    468 Sheffield Road Whittington Moor Chesterfield Derbyshire S41 8LP

    Change of use of existing car sales pitch to car wash with new metal frame, fabric canopy

    1 Jul 2026 Full applications
  • 15 High Street Brimington Chesterfield Derbyshire S43 1DE

    Retrospective application for wooden shelter

    22 May 2026 Full applications
  • CHE/26/00769/FUL Awaiting decision

    Cannon Mill Dock Walk Chesterfield Derbyshire S40 2AB

    Change of use to office accommodation, external alterations and associated works

    1 Sep 2026 Full applications
  • 4 Station Road Barrow Hill Chesterfield Derbyshire S43 2NL

    Erection of a rear dormer roof and further works to the rear, to facilitate change of use to form a separate ground floor shop and 2 upper floor flats

    17 Oct 2025 Full applications
  • 16 The Green Hasland Chesterfield Derbyshire S41 0LJ

    Change of use from a dwelling to a massage/wellness therapy service/business (Use Class E)

    6 Jul 2026 Full applications