Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE

Granted Newport 26/0586

Relates to 25/0711

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

PARTIAL DISCHARGE OF CONDITIONS 10 (SERVICE TESTING AND MAINTENANCE PLAN), 16 (EXTERNAL LIGHTING), 20 (CYCLE PARKING DETAILS), 21 (EV CHARGING), 22 (TRAVEL PLAN) AND 23 (PEDESTRIAN CROSSING AND FOOTWAY) OF 25/0711 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 7 (LANDSCAPING AND PLANTING SCHEME), 10 (NOISE ASSESSMENT) AND 11 (NOISE SURVEY) OF 20/0039 ERECTION OF 4NO. THREE-STOREY DATA CENTRE BUILDINGS COMPRISING B8 USE AND ANCILLARY B1 USE, PROVISION OF EMERGENCY GENERATORS, SECURITY LODGE, HARD AND SOFT LANDSCAPING, INTERNAL ACCESS ROADS, CAR PARKING AND SUSTAINABLE DRAINAGE. AMENDMENTS INCLUDE CHANGES TO BUILDING FOOTPRINTS AND DESIGN, LOCATION OF GENERATORS, CHANGES TO DRAINAGE STRATEGY AND LANDSCAPING AND OTHER LAYOUT CHANGES

As published by the council, reference 26/0586

Application record

Reference
26/0586
Status
Decided
Decision
Granted As published: Approved
Received
30 Jul 2026
Validated
30 Jul 2026
Decided
9 Sep 2026
Ward
Tredegar Park And Marshfield
Parish
Coedkernew Community Council
Postcode
NP10 8BE

Site history

Applications at this address on the Newport register

This site has had 4 applications since 2024: 4 approved, 0 refused.

  • 26/0585 Granted

    Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    NMA APPLICATION TO VARY CONDITION 2 (NOISE) OF 24/0747 CONSTRUCTION OF AN ELECTRICITY SUBSTATION COMPOUND COMPRISING TRANSFORMERS, SWITCHGEARS AND ELECTRICAL EQUIPMENT, SURFACE WATER DRAINAGE, MEANS OF ACCESS, LANDSCAPING, THE INSTALLATION OF BURIED ELECTRICITY TRANSMISSION CIRCUITS, CREATION OF A HABITAT COMPENSATION SITE AND ASSOCIATED WORKS

    Decided 27 Aug 2026
  • 25/0710 Granted

    Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    ADVERTISEMENT CONSENT FOR DISPLAY OF 3 NO. ILLUMINATED SIGNS, 3 NO. NON ILLUMINATED SIGNS AND 1 NO. SUBSTATION ID SIGN

    Decided 23 Oct 2025 Advertising
  • 24/0680 Granted

    Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    PARTIAL DISCHARGE OF CONDITION 7 (CEMP) OF 23/0878 PROPOSED ELECTRICITY SUBSTATION COMPOUND (132/33/11KV), INCLUDING A SWITCH-ROOM BUILDING AND OUTDOOR ELECTRICAL EQUIPMENT, ENCLOSED BY A SECURITY FENCE, WITH ASSOCIATED INFRASTRUCTURE INCLUDING ACCESS, LANDSCAPING, DRAINAGE AND EARTHWORKS

    Decided 9 Oct 2024 Conditions

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Newport

  2. 7 Aug 2026

    Added to PlanIndex

  3. 9 Sep 2026

    Decision issued: Approved

  4. 10 Sep 2026

    Status changed to Decided

    Previously Awaiting decision.

Cases linked to this one on the register

  • 25/0711 Granted

    Celtic Technology Centre Celtic Way Celtic Lakes Newport NP10 8BE

    S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 4 (BOUNDARY TREATMENTS) AND 8 (LANDSCAPING) OF 23/0549 FOR S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 7 (LANDSCAPING AND PLANTING SCHEME) AND 10 (NOISE ASSESSMENT) OF 20/0039 ERECTION OF 4NO. THREE-STOREY DATA CENTRE BUILDINGS COMPRISING B8 USE AND ANCILLARY B1 USE, PROVISION OF EMERGENCY GENERATORS, SECURITY LODGE, HARD AND SOFT LANDSCAPING, INTERNAL ACCESS ROADS, CAR PARKING AND SUSTAINABLE DRAINAGE. AMENDMENTS INCLUDE CHANGES TO BUILDING FOOTPRINTS AND DESIGN, LOCATION OF GENERATORS, CHANGES TO DRAINAGE STRATEGY AND LANDSCAPING AND OTHER LAYOUT CHANGES

    Decided 31 Oct 2025 Amendments

What this grant of permission means

Newport granted permission on 9 September 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Newport's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    26/0458 Submitted 17 Jun 2026 50 yards away

    INSTALLATION OF EXTERNAL BUILDING EXTRACT DUCTS, AIR INTAKE/EXTRACT LOUVRES, CONDENSER UNITS AND ENCLOSURES AND ASSOCIATED WORKS

    Granted
  • Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    26/0585 Submitted 30 Jul 2026 50 yards away

    NMA APPLICATION TO VARY CONDITION 2 (NOISE) OF 24/0747 CONSTRUCTION OF AN ELECTRICITY SUBSTATION COMPOUND COMPRISING TRANSFORMERS, SWITCHGEARS AND ELECTRICAL EQUIPMENT, SURFACE WATER DRAINAGE, MEANS OF ACCESS, LANDSCAPING, THE INSTALLATION OF BURIED ELECTRICITY TRANSMISSION CIRCUITS, CREATION OF A HABITAT COMPENSATION SITE AND ASSOCIATED WORKS

    Granted
  • IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    25/1067 Submitted 10 Dec 2025 50 yards away

    INSTALLATION OF 1NO. GENERATOR AND ASSOCIATED FLUES & WORKS

    Granted
  • IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    24/0611 Submitted 12 Jul 2024 200 yards away

    PROPOSED PARTIAL CHANGE OF USE OF BUILDING IP5 FROM B8 STORAGE TO B1 LABORATORY USE AND ANCILLARY SPACES AND ASSOCIATED MINOR EXTERNAL WORKS

    Granted Full applications 27 docs
  • Land On The West Side Of Celtic Way Celtic Lakes Newport South Wales

    23/0996 Submitted 2 Nov 2023 250 yards away

    CONSTRUCTION OF 2NO. UNITS UNDER USE CLASS B1, B2 & B8

    Granted Full applications 46 docs
    Major scheme
  • Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS

    26/0661 Submitted 24 Aug 2026 300 yards away

    80% historically approved · decision due ~19 Oct

    PARTIAL DISCHARGE OF CONDITION 12 (TRAVEL PLAN) OF 25/0379 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 3 (LANDSCAPING), 4 (LEMP), 15 (PARKING), 16 (CYCLE STORAGE DETAILS), 17 (FOUL DRAINAGE) AND TO REMOVE CONDITION 6 (DORMICE METHOD STATEMENT) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATA CENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES ANDS OTHER ASSOCIATED WORKS. AMENDMENTS INCLUDE CHANGES TO LAYOUT AND LANDSCAPING TO ACCOMMODATE SAB REQUIREMENTS, AMENDMENTS AND ADDITIONS TO ADMIN AND DATA HALL BUILDINGS, DESIGN AND SPECIFICATION OF GENERATORS, REVISIONS TO EXTERNAL LIGHTING AND REVISED DETAILS OF ANCILLARY STRUCTURES INCLUDING NEW CONDITION FOR FUTURE PRIMARY SUBSTATION

    Decided Demolition 6 docs