Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE

Awaiting decision Newport 26/0586

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

PARTIAL DISCHARGE OF CONDITIONS 10 (SERVICE TESTING AND MAINTENANCE PLAN), 16 (EXTERNAL LIGHTING), 20 (CYCLE PARKING DETAILS), 21 (EV CHARGING), 22 (TRAVEL PLAN) AND 23 (PEDESTRIAN CROSSING AND FOOTWAY) OF 25/0711 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 7 (LANDSCAPING AND PLANTING SCHEME), 10 (NOISE ASSESSMENT) AND 11 (NOISE SURVEY) OF 20/0039 ERECTION OF 4NO. THREE-STOREY DATA CENTRE BUILDINGS COMPRISING B8 USE AND ANCILLARY B1 USE, PROVISION OF EMERGENCY GENERATORS, SECURITY LODGE, HARD AND SOFT LANDSCAPING, INTERNAL ACCESS ROADS, CAR PARKING AND SUSTAINABLE DRAINAGE. AMENDMENTS INCLUDE CHANGES TO BUILDING FOOTPRINTS AND DESIGN, LOCATION OF GENERATORS, CHANGES TO DRAINAGE STRATEGY AND LANDSCAPING AND OTHER LAYOUT CHANGES

As published by the council, reference 26/0586

Application record

Reference
26/0586
Status
Awaiting decision
Received
30 Jul 2026
Validated
30 Jul 2026
Ward
Tredegar Park And Marshfield
Parish
Coedkernew Community Council
Postcode
NP10 8BE

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Newport

  2. 7 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Newport took a median of 64 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file

69 applications on PlanIndex · across 41 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

What happens while it is decided

The process from here

This application is with Newport for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Newport is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    26/0458 Submitted 17 Jun 2026 0m away

    81% historically approved · decision due ~11 Sep

    INSTALLATION OF EXTERNAL BUILDING EXTRACT DUCTS, AIR INTAKE/EXTRACT LOUVRES, CONDENSER UNITS AND ENCLOSURES AND ASSOCIATED WORKS

    Awaiting decision
  • Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    26/0585 Submitted 30 Jul 2026 0m away

    81% historically approved · decision due ~24 Sep

    NMA APPLICATION TO VARY CONDITION 2 (NOISE) OF 24/0747 CONSTRUCTION OF AN ELECTRICITY SUBSTATION COMPOUND COMPRISING TRANSFORMERS, SWITCHGEARS AND ELECTRICAL EQUIPMENT, SURFACE WATER DRAINAGE, MEANS OF ACCESS, LANDSCAPING, THE INSTALLATION OF BURIED ELECTRICITY TRANSMISSION CIRCUITS, CREATION OF A HABITAT COMPENSATION SITE AND ASSOCIATED WORKS

    Decided
  • IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    25/1067 Submitted 10 Dec 2025 0m away

    81% historically approved · decision due ~12 Aug

    INSTALLATION OF 1NO. GENERATOR AND ASSOCIATED FLUES & WORKS

    Decided
  • IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE

    24/0611 Submitted 12 Jul 2024 168m away

    PROPOSED PARTIAL CHANGE OF USE OF BUILDING IP5 FROM B8 STORAGE TO B1 LABORATORY USE AND ANCILLARY SPACES AND ASSOCIATED MINOR EXTERNAL WORKS

    Granted Full applications 27 docs
  • Land On The West Side Of Celtic Way Celtic Lakes Newport South Wales

    23/0996 Submitted 2 Nov 2023 238m away

    CONSTRUCTION OF 2NO. UNITS UNDER USE CLASS B1, B2 & B8

    Granted Full applications 46 docs
    Major scheme
  • Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS

    26/0661 Submitted 24 Aug 2026 258m away

    81% historically approved · decision due ~19 Oct

    PARTIAL DISCHARGE OF CONDITION 12 (TRAVEL PLAN) OF 26/0379 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 3 (LANDSCAPING), 4 (LEMP), 15 (PARKING), 16 (CYCLE STORAGE DETAILS), 17 (FOUL DRAINAGE) AND TO REMOVE CONDITION 6 (DORMICE METHOD STATEMENT) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATA CENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES ANDS OTHER ASSOCIATED WORKS. AMENDMENTS INCLUDE CHANGES TO LAYOUT AND LANDSCAPING TO ACCOMMODATE SAB REQUIREMENTS, AMENDMENTS AND ADDITIONS TO ADMIN AND DATA HALL BUILDINGS, DESIGN AND SPECIFICATION OF GENERATORS, REVISIONS TO EXTERNAL LIGHTING AND REVISED DETAILS OF ANCILLARY STRUCTURES INCLUDING NEW CONDITION FOR FUTURE PRIMARY SUBSTATION

    Awaiting decision Demolition