Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS

Awaiting decision Newport 26/0661

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

PARTIAL DISCHARGE OF CONDITION 12 (TRAVEL PLAN) OF 26/0379 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 3 (LANDSCAPING), 4 (LEMP), 15 (PARKING), 16 (CYCLE STORAGE DETAILS), 17 (FOUL DRAINAGE) AND TO REMOVE CONDITION 6 (DORMICE METHOD STATEMENT) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATA CENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES ANDS OTHER ASSOCIATED WORKS. AMENDMENTS INCLUDE CHANGES TO LAYOUT AND LANDSCAPING TO ACCOMMODATE SAB REQUIREMENTS, AMENDMENTS AND ADDITIONS TO ADMIN AND DATA HALL BUILDINGS, DESIGN AND SPECIFICATION OF GENERATORS, REVISIONS TO EXTERNAL LIGHTING AND REVISED DETAILS OF ANCILLARY STRUCTURES INCLUDING NEW CONDITION FOR FUTURE PRIMARY SUBSTATION

As published by the council, reference 26/0661

Application record

Reference
26/0661
Status
Awaiting decision
Received
24 Aug 2026
Validated
24 Aug 2026
Postcode
NP10 8FS

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by Newport

  2. 27 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Newport took a median of 64 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Newport for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Newport is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS

    26/0448 Submitted 15 Jun 2026 0m away

    81% historically approved · decision due ~10 Aug

    PARTIAL DISCHARGE OF CONDITION 14 (AIR QUALITY MANAGEMENT PLAN) OF 25/0379 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 3 (LANDSCAPING), 4 (LEMP), 15 (PARKING), 16 (CYCLE STORAGE DETAILS), 17 (FOUL DRAINAGE) AND TO REMOVE CONDITION 6 (DORMICE METHOD STATEMENT) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATA CENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES ANDS OTHER ASSOCIATED WORKS. AMENDMENTS INCLUDE CHANGES TO LAYOUT AND LANDSCAPING TO ACCOMMODATE SAB REQUIREMENTS, AMENDMENTS AND ADDITIONS TO ADMIN AND DATA HALL BUILDINGS, DESIGN AND SPECIFICATION OF GENERATORS, REVISIONS TO EXTERNAL LIGHTING AND REVISED DETAILS OF ANCILLARY STRUCTURES INCLUDING NEW CONDITION FOR FUTURE PRIMARY SUBSTATION

    Decided Demolition
  • Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS

    26/0485 Submitted 1 Jul 2026 0m away

    81% historically approved · decision due ~26 Aug

    NON-MATERIAL AMENDMENT TO PLANNING PERMISSION 25/0379 FOR: 1. ENTRANCE REALIGNMENT, 2. ADDITIONAL PEDESTRIAN CROSSING 3. SUBSTATION FENCING AND HARD SURFACES SURROUNDING & 4. EASTERN ENTRANCE BELL MOUTH AND COORDINATED AROUND EXISTING UNDERGROUND DUCTING

    Decided
  • Quinn Radiators Celtic Way Celtic Lakes Newport South Wales NP10 8FS

    25/0616 Submitted 31 Jul 2025 1m away

    PARTIAL DISCHARGE OF CONDITION 11 (MATERIALS) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATA CENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES ANDS OTHER ASSOCIATED WORKS

    Granted Conditions Demolition 10 docs
  • Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS

    25/1016 Submitted 26 Nov 2025 73m away

    PARTIAL DISCHARGE OF CONDITION 10 (DETAILS OF FUTURE PRIMARY SUBSTATION) OF 25/0379 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 3 (LANDSCAPING), 4 (LEMP), 15 (PARKING), 16 (CYCLE STORAGE DETAILS), 17 (FOUL DRAINAGE) AND TO REMOVE CONDITION 6 (DORMICE METHOD STATEMENT) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATA CENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES ANDS OTHER ASSOCIATED WORKS. AMENDMENTS INCLUDE CHANGES TO LAYOUT AND LANDSCAPING TO ACCOMMODATE SAB REQUIREMENTS, AMENDMENTS AND ADDITIONS TO ADMIN AND DATA HALL BUILDINGS, DESIGN AND SPECIFICATION OF GENERATORS, REVISIONS TO EXTERNAL LIGHTING AND REVISED DETAILS OF ANCILLARY STRUCTURES INCLUDING NEW CONDITION FOR FUTURE PRIMARY SUBSTATION

    Granted Conditions Demolition 17 docs
  • Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS

    24/0909 Submitted 8 Nov 2024 73m away

    PARTIAL DISCHARGE OF CONDITION 2 (CEMP) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATACENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES AND OTHER ASSOCIATED WORKS

    Granted Conditions Demolition 8 docs
  • Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS

    24/0888 Submitted 4 Nov 2024 73m away

    PARTIAL DISCHARGE OF CONDITION 4 (LANDSCAPE AND ECOLOGICAL MANAGEMENT PLAN) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATACENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES ANDS OTHER ASSOCIATED WORKS

    Granted Conditions Demolition 9 docs