Planning application
Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
NMA APPLICATION TO VARY CONDITION 2 (NOISE) OF 24/0747 CONSTRUCTION OF AN ELECTRICITY SUBSTATION COMPOUND COMPRISING TRANSFORMERS, SWITCHGEARS AND ELECTRICAL EQUIPMENT, SURFACE WATER DRAINAGE, MEANS OF ACCESS, LANDSCAPING, THE INSTALLATION OF BURIED ELECTRICITY TRANSMISSION CIRCUITS, CREATION OF A HABITAT COMPENSATION SITE AND ASSOCIATED WORKS
As published by the council, reference 26/0585
Application record
- Reference
- 26/0585
- Status
- Decided
- Received
- 30 Jul 2026
- Validated
- 30 Jul 2026
- Postcode
- NP10 8BE
Timeline
Dates from the published record
-
30 Jul 2026
Received by Newport
-
11 Aug 2026
Added to PlanIndex
-
30 Aug 2026
Status changed to Decided
Previously Awaiting decision.
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Newport is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE
81% historically approved · decision due ~11 Sep
INSTALLATION OF EXTERNAL BUILDING EXTRACT DUCTS, AIR INTAKE/EXTRACT LOUVRES, CONDENSER UNITS AND ENCLOSURES AND ASSOCIATED WORKS
Awaiting decision -
Celtic Technology Centre Celtic Way Celtic Lakes Newport South Wales NP10 8BE
81% historically approved · decision due ~24 Sep
PARTIAL DISCHARGE OF CONDITIONS 10 (SERVICE TESTING AND MAINTENANCE PLAN), 16 (EXTERNAL LIGHTING), 20 (CYCLE PARKING DETAILS), 21 (EV CHARGING), 22 (TRAVEL PLAN) AND 23 (PEDESTRIAN CROSSING AND FOOTWAY) OF 25/0711 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 7 (LANDSCAPING AND PLANTING SCHEME), 10 (NOISE ASSESSMENT) AND 11 (NOISE SURVEY) OF 20/0039 ERECTION OF 4NO. THREE-STOREY DATA CENTRE BUILDINGS COMPRISING B8 USE AND ANCILLARY B1 USE, PROVISION OF EMERGENCY GENERATORS, SECURITY LODGE, HARD AND SOFT LANDSCAPING, INTERNAL ACCESS ROADS, CAR PARKING AND SUSTAINABLE DRAINAGE. AMENDMENTS INCLUDE CHANGES TO BUILDING FOOTPRINTS AND DESIGN, LOCATION OF GENERATORS, CHANGES TO DRAINAGE STRATEGY AND LANDSCAPING AND OTHER LAYOUT CHANGES
Awaiting decision -
IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE
81% historically approved · decision due ~12 Aug
INSTALLATION OF 1NO. GENERATOR AND ASSOCIATED FLUES & WORKS
Decided -
IP5 Celtic Way Celtic Lakes Newport South Wales NP10 8BE
PROPOSED PARTIAL CHANGE OF USE OF BUILDING IP5 FROM B8 STORAGE TO B1 LABORATORY USE AND ANCILLARY SPACES AND ASSOCIATED MINOR EXTERNAL WORKS
Granted Full applications 27 docs -
Land On The West Side Of Celtic Way Celtic Lakes Newport South Wales
CONSTRUCTION OF 2NO. UNITS UNDER USE CLASS B1, B2 & B8
Granted Full applications 46 docsMajor scheme -
Quinn Radiators Celtic Way Celtic Lakes Newport NP10 8FS
81% historically approved · decision due ~19 Oct
PARTIAL DISCHARGE OF CONDITION 12 (TRAVEL PLAN) OF 26/0379 S73 APPLICATION TO VARY CONDITIONS 1 (APPROVED PLANS), 3 (LANDSCAPING), 4 (LEMP), 15 (PARKING), 16 (CYCLE STORAGE DETAILS), 17 (FOUL DRAINAGE) AND TO REMOVE CONDITION 6 (DORMICE METHOD STATEMENT) OF 24/0006 DEMOLITION OF REMAINDER OF EXISTING PRINCIPAL BUILDING AND REMAINING STRUCTURES AND CONSTRUCTION OF NEW DATA CENTRE (USE CLASS B8) ACROSS TWO MAIN BUILDINGS PLUS ANCILLARY STRUCTURES ANDS OTHER ASSOCIATED WORKS. AMENDMENTS INCLUDE CHANGES TO LAYOUT AND LANDSCAPING TO ACCOMMODATE SAB REQUIREMENTS, AMENDMENTS AND ADDITIONS TO ADMIN AND DATA HALL BUILDINGS, DESIGN AND SPECIFICATION OF GENERATORS, REVISIONS TO EXTERNAL LIGHTING AND REVISED DETAILS OF ANCILLARY STRUCTURES INCLUDING NEW CONDITION FOR FUTURE PRIMARY SUBSTATION
Awaiting decision Demolition