Skip to content
PlanIndex Get alerts
Menu

Planning application

Land North Off Crymlyn Parc Skewen Neath Neath Port Talbot SA11 5RD

Awaiting decision Neath Port Talbot P2025/0286 Outline Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Outline planning application with all matters reserved for the development of up to 139 no. residential units (amended description and plans in respect of highway matters and documents dated 5.8.2026).

As published by the council, reference P2025/0286

Application record

Reference
P2025/0286
Type
Outline Application
Status
Awaiting decision
Received
24 Apr 2025
Validated
24 Apr 2025
Ward
Coedffranc West
Parish
Coedffranc Town Council
Postcode
SA11 5RD

Timeline

Dates from the published record

  1. 24 Apr 2025

    Received by Neath Port Talbot

  2. 7 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 19 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Neath Port Talbot took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Bridgend

853 applications on PlanIndex · across 21 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Neath Port Talbot for determination, against a statutory target of eight weeks. Over the last year Neath Port Talbot decided outline applications in a median of 35 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 145 Crymlyn Parc Skewen Neath Neath Port Talbot SA10 6EF

    P2023/0227 Submitted 14 Mar 2023 135m away

    Erect a single storey conservatory to the rear elevation, reposition access steps to the lower garden area, and remove rear bay window to be replaced with patio doors.

    Granted Full applications Extension Windows or glazing 6 docs
    Small domestic
  • 9 Crymlyn Gardens Skewen Neath Port Talbot SA10 6EU

    P2026/0349 Submitted 1 Jun 2026 225m away

    97% historically approved · decision due ~4 Sep

    Garage conversion to living accommodation and storeroom

    Decided
  • 106 Cae Morfa Skewen SA10 6EH

    P2021/0759 Submitted 16 Jul 2021 281m away

    Construction of a single storey rear extension

    Decided Lawful development Extension 7 docs
    Small domestic
  • 4 Back Drive Lonlas Neath Port Talbot SA10 6SB

    P2025/0816 Submitted 19 Nov 2025 377m away

    Proposed demolition of existing conservatory to facilitate a single storey side extension.

    Granted Full applications Extension Demolition
    Small domestic
  • 16 Heol Ffranc Skewen Neath Port Talbot SA10 6DH

    P2025/0692 Submitted 29 Sep 2025 402m away

    Conversion of existing detached garage to form granny annexe ancillary to the main dwelling and solely for use by family members of 16 Heol Ffranc, together with external alterations including replacing garage door with glazed windows and door (lawful development certificate proposed)

    Decided Lawful development Windows or glazing
    Domestic
  • Land To The Rear Of Land Of Former Oak Tree Park Hotel Birchgrove Swansea SA7 9JR

    2025/2590/FUL Submitted 8 Dec 2025 421m away

    82% historically approved · decision due ~9 Mar

    Retention and completion of detached outbuilding and detached dwelling (including two storey side extension, two front dormer windows, velux type windows and minor alterations to windows)

    Awaiting decision Full applications New dwelling Extension +2 15 docs
    Small domestic

In Neath Port Talbot

  • P2025/0792 Granted

    Land East Of Minyrawel Pen Yr Alltwen Rhos Pontardawe Neath Port Talbot

    Outline application for residential development for up to 8 dwellings with approval sought for access, and all other matters reserved

    12 Nov 2025 Outline
  • P2026/0224 Refused

    Land To Rear Of 9 Maes Llwynonn Cadoxton Neath Port Talbot SA10 8AQ

    Outline application for 1.no detached dwelling and associated parking with access, layout and scale to be considered (appearance and landscaping reserved).

    8 Apr 2026 Outline
  • P2026/0255 Decided

    Land North Of Giants Grave

    Request for a formal Environmental Impact Assessment (EIA) Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017 for a proposed solar development and associated works and infrastructure which will generate up to 6 Megawatts (MW) on land to the north of Giants Grave Road, Neath, SA11 2LP.

    22 Apr 2026 Outline
  • P2025/0624 Decided

    Land At Caegarw Farm Margam Neath Port Talbot SA13 2TL

    Request for Screening Opinion under Regulation 6 of the Town and Country Planning (Environment Impact Assessment) (Wales) Regulations 2017 for a proposed ground mounted 9.9MW capacity solar farm and ancillary infrastructure including security fencing, access, and landscaping works to generate power to feed into the local electricity distribution network.

    27 Aug 2025 Outline
  • P2025/0699 Decided

    Land At Crugwyllt Fawr Crugwyllt Fawr Access Road Margam Neath Port Talbot SA13 2TB

    Request for a Scoping Opinion in accordance with Regulation 14(1) of the Environmental Impact Assessment (Wales) Regulations 2017 for the construction of a 40 MW solar farm, associated ancillary infrastructure and landscape and environmental mitigation and enhancements on land (81 Ha) at Crugwyllt Fawr, Margam, Port Talbot, SA13 2TB.

    1 Oct 2025 Outline