Planning application

P2026/0255

Land North Of Giants Grave

Decided Neath Port Talbot Screening Opinion

Proposal

Request for a formal Environmental Impact Assessment (EIA) Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017 for a proposed solar development and associated works and infrastructure which will generate up to 6 Megawatts (MW) on land to the north of Giants Grave Road, Neath, SA11 2LP.

As published by the council, reference P2026/0255

Timeline

Dates from the published record

  1. 22 Apr 2026

    Received by Neath Port Talbot

  2. 22 May 2026

    Decision issued: EIA Development

  3. 28 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • P2026/0221 Awaiting decision

    83A Llansawel Crescent Briton Ferry Neath Port Talbot SA11 2UW

    Construction of a single storey rear extension to existing shop and air conditioning system.

    7 Apr 2026 481m away Full applications

In Neath Port Talbot

  • P2026/0421 Decided

    42km Off SW Coast Of Pembrokeshire

    DNS EIA scoping consultation: Gwynt Glas Offshore Wind Farm a large-scale floating offshore wind energy project

    29 Jun 2026 Outline
  • P2026/0426 Awaiting decision

    Cryddan Brook Flood Alleviation Scheme Melyn Neath

    Request for Screening opinion under Regulation 6 of the Town and Country Planning (Environment Impact Assessment) (Wales) Regulations 2017 for a proposed Flood Alleviation Scheme

    30 Jun 2026 Outline
  • P2025/0792 Granted

    Land East Of Minyrawel Pen Yr Alltwen Rhos Pontardawe Neath Port Talbot

    Outline application for residential development for up to 8 dwellings with approval sought for access, and all other matters reserved

    12 Nov 2025 Outline
  • P2026/0410 Awaiting decision

    Abernant Colliery Pontardawe SA8 4SX

    Request for Screening opinion under Regulation 6 of the Town and Country Planning (Environment Impact Assessment) (Wales) Regulations 2017 for a proposed biomass gasification Combined Heat and Power (CHP) waste-to-hydrogen production facility

    18 Jun 2026 Outline
  • P2026/0328 Decided

    Cymmer Port Talbot

    Request for Screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017, for the Proposed Cymmer Carriageway Realignment Works.

    21 May 2026 Outline