Skip to content
PlanIndex Get alerts
Menu

Planning application

St Brendans Hospital Horve Castlebay Isle Of Barra HS9 5XE

Awaiting decision Na h-Eileanan Siar 26/00292/PPD Planning Permission (Detailed)

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replace external boiler with new packaged plantroom. Extension of existing concrete base.

As published by the council, reference 26/00292/PPD

Application record

Reference
26/00292/PPD
Type
Planning Permission (Detailed)
Status
Awaiting decision
Received
24 Jul 2026
Validated
19 Aug 2026
Ward
Barraigh Agus Bhatarsaigh
Parish
Castlebay & Vatersay
Decision by
Delegate Decision
Postcode
HS9 5XE

Timeline

Dates from the published record

  1. 24 Jul 2026

    Received by Na h-Eileanan Siar

  2. 19 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Na h-Eileanan Siar took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Na h-Eileanan Siar for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 87 Horve Castlebay Isle Of Barra HS9 5XE

    26/00255/PPD Submitted 3 Jul 2026 98m away

    99% historically approved · decision due ~11 Sep

    Refurbishment of existing black house, including; new roof structure and roofing material, replacement chimney (non-functional), replacement windows, doors and roof lights, new rainwater goods and drainage arrangements, formation of new vehicle access and hardstanding, erection of new boundary fence, gate and bin store area, and shed within residential curtilage.

    Awaiting decision Full applications Loft or dormer Roofing +1 14 docs
    Small domestic
  • 87 Horve Castlebay Isle Of Barra HS9 5XE

    26/00256/LBC Submitted 6 Jul 2026 98m away

    99% historically approved · decision due ~11 Sep

    Refurbishment of existing black house, replacement of roof structure, roof covering, deconstruction and replacement of defective chimney. Replacement of external windows, doors and roof lights. Internal refurbishment.

    Awaiting decision Heritage and listed buildings Loft or dormer Roofing +1 15 docs
  • St Brendans Home & Hospice Horve Castlebay Isle Of Barra HS9 5XE

    05/00312/NID Submitted 19 May 2005 151m away

    Re-roof Building

    Granted Roofing
  • Fire Station St Brendan Road Castlebay Isle Of Barra HS9 5XE

    09/00011/TEL Submitted 9 Jan 2009 151m away

    Install Antenna onto Existing Pole Mount at 6.4M

    Granted Telecoms 2 docs
  • Fire Station St Brendan Road Castlebay Isle Of Barra HS9 5XE

    08/00545/TEL Submitted 5 Dec 2008 151m away

    Install 0.58m Antenna on existing pole mount

    Decided Telecoms
  • 1 Maol Domhnaich Castlebay Isle Of Barra HS9 5XP

    12/00691/PPD Submitted 26 Nov 2012 162m away

    Install Air Source Heat Pumps externally at No's 1, 2, 7, 8 & 10 Maol Domhnaich, Castlebay

    Granted Full applications 10 docs

In Na h-Eileanan Siar

  • 23/00507/PPD Granted

    Workshop Carloway Pier Knock Carloway Isle Of Lewis

    Site portable unit for a community workshop for marine plastic recycling solutions

    12 Nov 2023 Full applications
  • 26/00082/PPD Granted

    Creed Lodge Lochs Road Lochs Isle Of Lewis HS2 9JN

    Erect small single storey extension to Grade C listed building. Replace existing windows.

    4 Mar 2026 Full applications
  • 26/00229/PPD Granted

    8 Leanish Castlebay Isle Of Barra HS9 5UW

    Extension to rear of property

    16 Jun 2026 Full applications
  • 26/00227/PPD Granted

    Pod 3 Borve Berneray Isle Of North Uist

    Change of use of Land to site a caravan (pod) for use for short term holiday let with associated access and infrastructure

    15 Jun 2026 Full applications
  • 26/00222/PPD Granted

    Chalets 244 Bruernish Northbay Isle Of Barra

    Change of use of land to Site 2no. Caravans (pods) to be used for short term let & create access road and parking and install drainage

    10 Jun 2026 Full applications