Council hub · Scotland
Na h-Eileanan Siar planning applications
454 applications. 99% approved. 52 days to decide.
As of July 2026, PlanIndex holds 454 planning applications from Na h-Eileanan Siar. 336 were decided in the trailing 12 months, with 99% of clear-cut outcomes approved.
Latest applications
Data to July 2026
-
26/00290/PPD Awaiting decision
2 Caolis Vatersay Isle Of Barra HS9 5YL
Erection of domestic garage
-
26/00288/OHLSCR Awaiting decision
Overhead Line Clachan Sands Lochmaddy Isle Of North Uist
Consultation by ECU on EIA Screening Opinion for proposed new 4 x single pole HV spur from existing HV pole on 11kV line, with proposed underground LV cable connection to campsite
-
26/00289/CONSG Awaiting decision
Pier Caolis Vatersay Isle Of Barra
Consultation by Marine Directorate for EIA Screening for Marine Works for Proposed Vatersay Sheltered Berthing Facility
-
26/00286/OTHPN Awaiting decision
Peatland Restoration Gisla Uig Isle Of Lewis
Peatland restoration
-
26/00287/OTHPN Awaiting decision
Peatland Restoration 4 Morsgail Uig Isle Of Lewis
Peatland Restoration
-
26/00283/TEL Awaiting decision
Mast Stornoway Golf Club Castle Grounds Stornoway Isle Of Lewis
Replcement of 3no. existing antennas for 3no. proposed antennas; removal of 3no. existing MHA's and installation of 3no. proposed MHA's with asociated ancillary equipment on the monopole. Installation of 1no. proposed GPS node at ground level.
-
26/00282/TEL Awaiting decision
Radio Station Beinn Na Cloch Radio Station Dalbeg Carloway Isle Of Lewis
Install 2no. 600mm dishes at 8m on new mounting steelwork
-
26/00284/TEL Awaiting decision
Telecommunication Pole Tong Road Tong Isle Of Lewis
Install 9m Pole for Fixed Line Broadband Apparatus.
-
26/00274/TEL Awaiting decision
Broadband Cabinet 2 Cross Ness Isle Of Lewis
Install Fixed Line Broadband Apparatus
-
26/00275/TEL Awaiting decision
Broadband Cabinet Port Of Ness Ness Isle Of Lewis
Install Fixed Line Broadband Apparatus
Recent decisions
Data to July 2026
-
26/00276/TEL Granted
Broadband Cabinet North Tolsta Tolsta Isle Of Lewis
Install Fixed Line Broadband Apparatus
-
26/00267/TEL Granted
ESN Mast Ardhasaig North Harris Isle Of Harris
The replacement of 3no. existing antennas for 3no. proposed antennas, the removal of 3no. existing MHAs, the installation of 3no. proposed remote radio heads (RRHs) and the installation of 6no. proposed MHAs along with associated ancillary equipment on the lattice tower. The installation of 3no. proposed remote radio heads (RRHs) and the installation of 1no. proposed GPS Node at ground level. Ref 73643/AD/AIRSCALE
-
26/00144/PPD Granted
133 Craigston Castlebay Isle Of Barra
Erect house. Create access. Install private drainage system. Renewal of planning consent ref: 22/00427/PPD
-
26/00151/PPD Granted
Traigh Mhor Bridge North Tolsta Tolsta Isle Of Lewis
Replace footbridge; widen existing path; install new pedestrian gateway; replace existing tables; & provide additional bins.
-
26/00154/PPD Granted
Old Manse Baleloch Balemartin Tigh Garry Isle Of North Uist
Demolish existing ruin and erect house with associated infrastructure and services
-
26/00192/PPD Granted
Free Church Of Scotland Mission Hall Arnol Isle Of Lewis HS2 9DB
Change of use from mission hall to house
-
26/00249/MLCON Granted
Brevig Harbour Vatisker Back Isle Of Lewis
MARINE (SCOTLAND) ACT 2010, PART 4 MARINE LICENSING 00011738 - Comhairle Nan Eilean Siar - Capital Dredge and Sea Deposit, Brevig Harbour, Isle of Lewis
-
26/00165/PPD Granted
3A Claddach Kirkibost Bayhead Isle Of North Uist
Erect house with associated infrastructure and services
-
26/00086/SCO_L Decided
Barvas Moor Windfarm Barvas Moor Road Barvas Isle Of Lewis
The proposed development comprises nine wind turbines with a maximum generating capacity of up to 49MW, together with associated infrastructure.
-
26/00116/PPD Granted
Millcroft Mingarry Daliburgh Isle Of South Uist HS8 5RY
Change of use of existing outbuilding to convert into self-contained annexe for use as a short term let; create new access
Decision speed
12 months to July 2026, where both dates are published
-
Within 8 weeks the statutory target for most applications 178 53%
-
8 to 13 weeks the target band for major development 89 26%
-
Over 13 weeks often extended by agreement 69 21%
Common questions
How many planning applications does Na h-Eileanan Siar decide?
In the 12 months to July 2026, Na h-Eileanan Siar decided 336 planning applications. 99% of clear-cut outcomes were approvals.
How long does a planning decision take in Na h-Eileanan Siar?
The median time from a planning application being received to a decision was 52 days over the 12 months to July 2026. Individual cases vary with complexity and consultation responses.
How many Na h-Eileanan Siar decisions arrive within the eight week target?
Of the 336 decisions in the 12 months to July 2026 where both dates are published, 53% came within eight weeks of the application being received, and 79% within thirteen weeks.
When is planning activity busiest in Na h-Eileanan Siar?
October 2025 was the busiest month across the 12 months to July 2026, with 52 applications recorded. The monthly pattern is listed on this page.
How do I find a planning application by its reference number?
Every application indexed here has its own page at a stable address. Look the reference up in a search engine together with the council name, or browse the latest applications below. Each page shows the description, address, dates and decision as the council published them.
Cite these figures
Na h-Eileanan Siar: 454 planning applications on record as of July 2026. Trailing 12 months: 336 decided, 99% approved, median 52 days to a decision. 454 new applications received in the same period. Source: PlanIndex, planindex.co.uk.