Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Maol Domhnaich Castlebay Isle Of Barra HS9 5XP

Granted Na h-Eileanan Siar 12/00691/PPD Planning Permission (Detailed)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Install Air Source Heat Pumps externally at No's 1, 2, 7, 8 & 10 Maol Domhnaich, Castlebay

As published by the council, reference 12/00691/PPD

Application record

Reference
12/00691/PPD
Type
Planning Permission (Detailed)
Status
Decided
Decision
Application Permitted with conditions
Received
26 Nov 2012
Validated
14 Dec 2012
Decided
28 Mar 2013
Ward
Barraigh Agus Uibhist A Deas
Parish
Castlebay & Vatersay
Decision by
Delegated Decision
Postcode
HS9 5XP

Timeline

Dates from the published record

  1. 26 Nov 2012

    Received by Na h-Eileanan Siar

  2. 14 Dec 2012

    Validated

    Checked as complete and ready for consideration.

  3. 28 Mar 2013

    Decision issued: Application Permitted with conditions

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Tigh Ceilidh Maol Domhnaich Castlebay Isle Of Barra HS9 5XP

    11/00363/COU Submitted 19 Jul 2011 0m away

    Change of use from Taigh Ceilidh to dwellinghouse

    Granted Full applications 8 docs
    Domestic
  • St Brendans Home & Hospice Horve Castlebay Isle Of Barra HS9 5XE

    05/00312/NID Submitted 19 May 2005 75m away

    Re-roof Building

    Granted Roofing
  • Fire Station St Brendan Road Castlebay Isle Of Barra HS9 5XE

    09/00011/TEL Submitted 9 Jan 2009 75m away

    Install Antenna onto Existing Pole Mount at 6.4M

    Granted Telecoms 2 docs
  • Fire Station St Brendan Road Castlebay Isle Of Barra HS9 5XE

    08/00545/TEL Submitted 5 Dec 2008 75m away

    Install 0.58m Antenna on existing pole mount

    Decided Telecoms
  • 87 Horve Castlebay Isle Of Barra HS9 5XE

    26/00256/LBC Submitted 6 Jul 2026 75m away

    99% historically approved · decision due ~11 Sep

    Refurbishment of existing black house, replacement of roof structure, roof covering, deconstruction and replacement of defective chimney. Replacement of external windows, doors and roof lights. Internal refurbishment.

    Awaiting decision Heritage and listed buildings Loft or dormer Roofing +1 15 docs
  • 87 Horve Castlebay Isle Of Barra HS9 5XE

    26/00255/PPD Submitted 3 Jul 2026 76m away

    99% historically approved · decision due ~11 Sep

    Refurbishment of existing black house, including; new roof structure and roofing material, replacement chimney (non-functional), replacement windows, doors and roof lights, new rainwater goods and drainage arrangements, formation of new vehicle access and hardstanding, erection of new boundary fence, gate and bin store area, and shed within residential curtilage.

    Awaiting decision Full applications Loft or dormer Roofing +1 14 docs
    Small domestic

In Na h-Eileanan Siar

  • 23/00507/PPD Granted

    Workshop Carloway Pier Knock Carloway Isle Of Lewis

    Site portable unit for a community workshop for marine plastic recycling solutions

    12 Nov 2023 Full applications
  • 26/00082/PPD Granted

    Creed Lodge Lochs Road Lochs Isle Of Lewis HS2 9JN

    Erect small single storey extension to Grade C listed building. Replace existing windows.

    4 Mar 2026 Full applications
  • 26/00229/PPD Granted

    8 Leanish Castlebay Isle Of Barra HS9 5UW

    Extension to rear of property

    16 Jun 2026 Full applications
  • 26/00227/PPD Granted

    Pod 3 Borve Berneray Isle Of North Uist

    Change of use of Land to site a caravan (pod) for use for short term holiday let with associated access and infrastructure

    15 Jun 2026 Full applications
  • 26/00222/PPD Granted

    Chalets 244 Bruernish Northbay Isle Of Barra

    Change of use of land to Site 2no. Caravans (pods) to be used for short term let & create access road and parking and install drainage

    10 Jun 2026 Full applications