Planning application
Beasdaire 5B Rushgarry Berneray Isle Of North Uist
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erect house with associated infrastructure and services for short term let
As published by the council, reference 26/00219/PPD
Application record
- Reference
- 26/00219/PPD
- Type
- Planning Permission (Detailed)
- Status
- Awaiting decision
- Received
- 9 Jun 2026
- Validated
- 17 Jun 2026
- Ward
- Uibhist A Tuath
- Parish
- Berneray
- Decision by
- Delegate Decision
Timeline
Dates from the published record
-
9 Jun 2026
Received by Na h-Eileanan Siar
-
17 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Na h-Eileanan Siar took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
- ARCHAEOLOGICAL REPORT
- ENVIRONMENTAL HEALTH - RESPONSE
- SG ADVERT
- SCOTTISH WATER - RESPONSE
- BUILDING STANDARDS - RESPONSE
- 01 LOCATION PLAN
- 02 SITE PLAN
- DESIGN STATEMENT
- APPLICATION FORM
- 03 SOUTH EAST AND NORTH WEST ELEVATIONS
- 04 SOUTH WEST AND NORTH EAST ELEVATIONS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Na h-Eileanan Siar for determination, against a statutory target of eight weeks. Over the last year Na h-Eileanan Siar decided full applications in a median of 80 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Na h-Eileanan Siar
-
23/00507/PPD Granted
Workshop Carloway Pier Knock Carloway Isle Of Lewis
Site portable unit for a community workshop for marine plastic recycling solutions
-
26/00301/PPD Granted
Storage Container Port Of Ness Ness Isle Of Lewis
Siting of 3x shipping containers.
-
26/00293/PPD Granted
Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET
Erect storage building
-
26/00100/PPD Granted
Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT
Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.
-
26/00342/PPD Granted
Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH
Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.