Planning application

Switching Station Balallan Lochs Isle Of Lewis

Awaiting decision Na h-Eileanan Siar 26/00168/PPDM Planning Permission (Detailed) Maj-Nat

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a 132 kV switching station, electrical installations, earthworks to form the switching station and cable sealing end platforms and access, and associated works to include formation of access, drainage, boundary treatment and peat management and the temporary formation of construction laydown and welfare areas.

As published by the council, reference 26/00168/PPDM

Application record

Reference
26/00168/PPDM
Type
Planning Permission (Detailed) Maj-Nat
Status
Awaiting decision
Received
11 May 2026
Validated
8 Jun 2026
Ward
Sgire Nan Loch
Parish
Kinloch
Decision by
Committe / Comhairle Decision

Timeline

Dates from the published record

  1. 11 May 2026

    Received by Na h-Eileanan Siar

  2. 8 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 3 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Na h-Eileanan Siar took a median of 58 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 18/00472/CONSG (Decided)
  • Application: 19/00148/CONSG (Decided)
  • Application: 25/00119/SCO_L (Decided)
  • Application: 25/00262/PAN (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

116 documents on file for this application

  • SCOTTISH FORESTRY Consultation · 16 Sep 2026
  • CONSULTANT RECIEW OF LVIA Consultation · 14 Sep 2026
  • SEPA RESPONSE Consultation · 10 Sep 2026
  • PEAT DEPTH WITH EARTHWORKS Supporting Information · 17 Aug 2026
  • PEATLAND CONDITION ASSESSMENT Supporting Information · 17 Aug 2026
  • APPLICANT RESPONSE TO SEPA Supporting Information · 17 Aug 2026
  • ARCHAEOLOGICAL RESPONSE Consultation · 27 Jul 2026
  • ROADS RESPONSE Consultation · 17 Jul 2026
  • ENVRONMENTAL HEALTH RESPONSE Consultation · 16 Jul 2026
  • ECONOMIC DEVELOPMENT RESPONSE Consultation · 16 Jul 2026
  • ECONOMIC DEVELOPMENT RESPONSE - TECHNICAL REVIEW OF SOCIO-ECONOMIC IMPACT ASSESS Consultation · 16 Jul 2026
  • TRANSPORT SCOTLAND RESPONSE Consultation · 16 Jul 2026
  • TRANSPORT SCOTLAND - TR/NPA/2 FORM Consultation · 16 Jul 2026
  • PAIRC COMMUNITY COUNCIL RESPONSE Consultation · 15 Jul 2026
  • HIAL RESPONSE Consultation · 14 Jul 2026
  • SEPA Consultation · 29 Jun 2026
  • TRANSPORT SCOTLAND - EXSTENSION OF TIME Other · 26 Jun 2026
  • SCOTTISH WATER RESPONSE Consultation · 19 Jun 2026
  • HISTORIC ENVIRONMENT SCOTLAND RESPONSE Consultation · 19 Jun 2026
  • EG ADVERT Other · 19 Jun 2026
  • SG ADVERT Other · 18 Jun 2026
  • SSEN RESPONSE Consultation · 17 Jun 2026
  • NATS RESPONSE Consultation · 16 Jun 2026
  • JOINT RADIO COMPANY RESPONSE Consultation · 16 Jun 2026
  • SSEN TRANSMISSION RESPONSE Consultation · 16 Jun 2026
  • MET OFFICE RESPONSE Consultation · 16 Jun 2026
  • 01 LOCATION PLAN Drawing · 12 Jun 2026
  • SITE DRAINAGE ARRANGEMENTS 1 OF 4 Other · 25 May 2026
  • SITE DRAINAGE ARRANGEMENTS 2 OF 4 Other · 25 May 2026
  • SITE DRANAGE ARRANGEMENTS 3 OF 4 Other · 25 May 2026
  • SITE DRAINAGE ARRANGEMENTS 4 OF 4 Other · 25 May 2026
  • EIAR VOL 1_NON-TECHNICAL SUMMARY EIA Report - Vol 1 · 11 May 2026
  • EIAR VOL 2_CHAPTER 1 INTRODUCTION EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 10 TRANSPORT AND ACCESS EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 11 SUMMARY OF RESIDUAL EFFECTS EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 12 SCHEDULE OF MITIGATION EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 2 PROPOSED DEVELOPMENT DESCRIPTION EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 3 SITE SELECTION AND ALTERNATIVES EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 4 EIA PROCESS EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 5 LANDSCAPE AND VISUAL EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 6 CULTURAL HERITAGE EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 7 BIODIVERSITY EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 8 WATER EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_CHAPTER 9 PEAT EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL 2_COVER PAGE EIA Report - Vol 2 · 11 May 2026
  • EIAR VOL4_COVER AND CONTENTS EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL3A_COVER AND CONTENTS EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3A_FIGURES 1_1-4_1 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3A_FIGURES 10-1-10_2 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3A_FIGURES 5_1-5_6 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3A_FIGURES 6_1-6_2 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3A_FIGURES 7_1-7_4 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3A_FIGURES 7_5-7_7 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3A_FIGURES 8_1-8_2 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3A_FIGURES 9_1-9_3 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_COVER AND CONTENTS EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_0A-B_VIEWPOINT 04 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_11A-B_VIEWPOINT 05 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_12A-B_VIEWPOINT 06 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_13A-B_VIEWPOINT 07 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_14A-B_VIEWPOINT 08 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_15A-B_VIEWPOINT 09 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_16A-B_VIEWPOINT 10 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_17A-B_VIEWPOINT 11 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_7A-B_VIEWPOINT 01 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_8A-B_VIEWPOINT 02 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL3B_FIGURES 5_9A-B VIEWPOINT 03 EIA Report - Vol 3 · 11 May 2026
  • EIAR VOL4_TA 1_1_TECHNICAL TEAM EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 2_1_SSEN GEMPS EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 2_2_SSEN SPPS EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 4_1_EIA SCOPING REPORT EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 4_2_EIA SCOPING OPINION EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 4_3_CONSULTATION REGISTER EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 5_1_LANDSCAPE AND VISUAL ASSESSMENT METH EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 5_2_VIEWPOINT ANALYSIS EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 5_3 LVIA COLOUR STUDY PART 1 EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 5_3 LVIA COLOUR STUDY PART 2 EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 5_3 LVIA COLOUR STUDY PART 3 EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 6_1_CULTURAL HERITAGE ASSESSMENT METHODO EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 6_2_CULTURAL HERITAGE ASSETS ISA EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 7_1_ECOLOGY AND ORNITHOLOGY ASSESSMENT M EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 7_2_HABITAT REGULATIONS APPRAISAL EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 7_4_OUTLINE HABITAT MANAGEMENT PLAN EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 8_1_WATER ENVIRONMENT ASSESSMENT METHODO EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 8_2_DRAINAGE IMPACT ASSESSMENT2_PART1 EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 8_2_DRAINAGE IMPACT ASSESSMENT2_PART2 EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 8_3_FLOOD RISK ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 9_1_PEAT DEPTH REPORT EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 9_2_OUTLINE PEAT MANAGEMENT PLAN EIA Report - Vol 4 · 11 May 2026
  • APPLICATION FORM Application Form · 11 May 2026
  • PLANNING STATEMENT Planning Statement · 11 May 2026
  • BIODIVERSITY NET GAIN ASSESSMENT REPORT Supporting Information · 11 May 2026
  • EIAR VOL4_TA 10_1_OUTLINE CTMP EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 9_3_PLHRA PART 1 EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 9_3_PLHRA PART 2 EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 9_3_PLHRA PART 3 EIA Report - Vol 4 · 11 May 2026
  • EIAR VOL4_TA 9_4 CARBON BALANCE ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • PAC REPORT PART 1 Other · 11 May 2026
  • PAC REPORT PART 2 Other · 11 May 2026
  • PAC REPORT PART 3 Other · 11 May 2026
  • PAC REPORT PART 4 Other · 11 May 2026
  • PAC REPORT PART 5 Other · 11 May 2026
  • SOCIO ECONOMIC IMPACT REPORT Supporting Information · 11 May 2026
  • 02 SITE PLAN Drawing · 11 May 2026
  • 13 EXISTING SITE PLAN Drawing · 11 May 2026
  • 03 NORTH AND EAST ELEVATIONS Drawing · 11 May 2026
  • 04 SOUTH AND WEST ELEVATIONS Drawing · 11 May 2026
  • 07 NORTH AND EAST SECTIONS Drawing · 11 May 2026
  • 08 SOUTH AND WEST SECTIONS Drawing · 11 May 2026
  • 11 EARTHWORKS AND LONGSECTION Drawing · 11 May 2026
  • 12 EARTHWORKS AND LONGSECTION 2 Drawing · 11 May 2026
  • 10 ACCESS DETAILS Drawing · 11 May 2026
  • 09 TYPICAL ROAD SECTIONS Drawing · 11 May 2026
  • 05 FLOOR PLAN Drawing · 11 May 2026
  • 06 ROOFPLAN Drawing · 11 May 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Na h-Eileanan Siar for determination, against a statutory target of eight weeks. Over the last year Na h-Eileanan Siar decided full applications in a median of 80 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Na h-Eileanan Siar

  • 23/00507/PPD Granted

    Workshop Carloway Pier Knock Carloway Isle Of Lewis

    Site portable unit for a community workshop for marine plastic recycling solutions

    Received 12 Nov, published by the council 4 Aug 2026 Full applications
  • 26/00301/PPD Granted

    Storage Container Port Of Ness Ness Isle Of Lewis

    Siting of 3x shipping containers.

    Received 5 Aug, published by the council 22 Aug 2026 Full applications
  • 26/00293/PPD Granted

    Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET

    Erect storage building

    Received 27 Jul, published by the council 4 Aug 2026 Full applications
  • 26/00100/PPD Granted

    Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT

    Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.

    Received 13 Mar, published by the council 27 Jul 2026 Full applications
  • 26/00342/PPD Granted

    Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH

    Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.

    Received 28 Aug, published by the council 1 Sep 2026 Full applications