Skip to content
PlanIndex Get alerts
Menu

Planning application

Onshore Transmission Works Spiorad Na Mara Offshore Wind Farm Barvas Isle Of Lewis

Awaiting decision Na h-Eileanan Siar 26/00167/PPDM Planning Permission (Detailed) Maj-Nat

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction, operation and decommissioning of onshore electricity transmission infrastructure associated with the Spiorad na Mara Offshore Windfarm, comprising: up to 12 electricity cables and associated transmission joint bays (TJBs) to the landfall point; up to two onshore substations (one located at landfall and one to the southwest of Stornoway); underground electricity cables and associated infrastructure connecting the TJBs and onshore substation(s) with the SSEN Lewis Hub; temporary and permanent access roads and tracks; and associated access, ancillary infrastructure and works. [Note: The period for representations to be submitted to Comhairle nan Eilean Siar closed on 12 August 2026]

As published by the council, reference 26/00167/PPDM

Application record

Reference
26/00167/PPDM
Type
Planning Permission (Detailed) Maj-Nat
Status
Awaiting decision
Received
8 May 2026
Validated
2 Jun 2026
Ward
An Taobh Siar Agus Nis
Parish
Barvas & Brue
Decision by
Committe / Comhairle Decision

Timeline

Dates from the published record

  1. 8 May 2026

    Received by Na h-Eileanan Siar

  2. 2 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 28 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Na h-Eileanan Siar took a median of 58 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 24/00327/PAN (Decided)
  • Application: 25/00131/PAN (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

193 documents on file for this application

  • FORESTRY - RESPONSE Consultation · 16 Sep 2026
  • FLOOD RISK - RESPONSE Consultation · 07 Sep 2026
  • REPRESENTATION 1028 Other · 07 Sep 2026
  • REPRESENTATION 1045 Other · 07 Sep 2026
  • REPRESENTATION 1053 Other · 07 Sep 2026
  • (85-128) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (798-1047) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (589-797) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (350-588) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (326-349) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (176-325) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (135-175) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (129-134) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (1048-1210) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • (01-84) REPRESENTATIONS LIST - AS AT 03.09.26 Other · 03 Sep 2026
  • NATURE.SCOT - RESPONSE Consultation · 14 Aug 2026
  • ENVIRONMENTAL HEALTH - RESPONSE Consultation · 13 Aug 2026
  • ROADS - RESPONSE Consultation · 13 Aug 2026
  • OHFT - RESPONSE Consultation · 13 Aug 2026
  • PUBLIC INFORMATION NOTE 3 Other · 13 Aug 2026
  • SEPA - RESPONSE Consultation · 12 Aug 2026
  • HES - RESPONSE Consultation · 12 Aug 2026
  • ARCHAEOLOGY - RESPONSE Consultation · 12 Aug 2026
  • SSEN TRANSMISSION - RESPONSE Consultation · 12 Aug 2026
  • STORNOWAY COMMUNITY COUNCIL - RESPONSE Consultation · 11 Aug 2026
  • UIG COMMUNITY COUNCIL - RESPONSE Consultation · 11 Aug 2026
  • LANDSCAPE - EXTERNAL CONSULTANT RESPONSE Consultation · 11 Aug 2026
  • RSPB - RESPONSE Consultation · 11 Aug 2026
  • TRANSPORT SCOTLAND - RESPONSE Consultation · 10 Aug 2026
  • TRANSPORT SCOTLAND - RESPONSE ON DEVELOPMENT AFFECTING TRUNK ROADS AND SPECIAL R Consultation · 10 Aug 2026
  • SANDWICK COMMUNITY COUNCIL - RESPONSE Consultation · 10 Aug 2026
  • SHAWBOST COMMUNITY COUNCIL - RESPONSE Consultation · 10 Aug 2026
  • ECONOMIC DEVELOPMENT - RESPONSE Consultation · 07 Aug 2026
  • ECONOMIC DEVELOPMENT - EXTERNAL CONSULTANT RESPONSE Consultation · 07 Aug 2026
  • NORTH LOCHS COMMUNITY COUNCIL - RESPONSE Consultation · 07 Aug 2026
  • BUILDING STANDARDS - RESPONSE Consultation · 29 Jul 2026
  • SSEN - RESPONSE Consultation · 03 Jul 2026
  • HIAL - RESPONSE Consultation · 01 Jul 2026
  • OFCOM - RESPONSE Consultation · 26 Jun 2026
  • REPRESENTATION 25 Other · 25 Jun 2026
  • BRITISH HORSE SOCIETY Consultation · 24 Jun 2026
  • LARGE VEHICLE GUIDANCE Consultation · 24 Jun 2026
  • GATES GUIDANCE Consultation · 24 Jun 2026
  • EXTENSION TO DETERMINATION PERIOD Other · 24 Jun 2026
  • PUBLIC INFORMATION NOTE 2 Other · 24 Jun 2026
  • MOD - RESPONSE Consultation · 19 Jun 2026
  • MET OFFICE RESPONSE Consultation · 16 Jun 2026
  • SCOTTISH WATER - RESPONSE Consultation · 16 Jun 2026
  • NATS RESPONSE Consultation · 12 Jun 2026
  • EG ADVERT Other · 12 Jun 2026
  • PUBLIC INFORMATION NOTE 1 Other · 11 Jun 2026
  • SG ADVERT Other · 11 Jun 2026
  • PRESS ADVERT - PRESS PUBLICATION DATE 11.06.26 Other · 09 Jun 2026
  • LIST OF NOTIFIED NEIGHBOURS Other · 09 Jun 2026
  • APPENDIX - OFFSHORE EIA REPORT (LINK TO) Other · 08 Jun 2026
  • PLANNING APPLICATION FORM Application Form · 02 Jun 2026
  • 02 SITE PLAN SHEETS 1-13 Drawing · 02 Jun 2026
  • 01 LOCATION PLAN Drawing · 02 Jun 2026
  • 04 LANDFALL SUBSTN LAYOUT Drawing · 02 Jun 2026
  • 11 GRID SUBSTN LAYOUT Drawing · 02 Jun 2026
  • 10 GRID SUBSTN ELEVATIONS Drawing · 02 Jun 2026
  • 05 LANDFALL SUBSTN 138KV BLDG ELEVATIONS & PLAN Drawing · 02 Jun 2026
  • 06 LANDFALL SUBSTN 275 KV BLDG ELEVATIONS & PLAN Drawing · 02 Jun 2026
  • 08 GRID SUBSTN 275 KV BLDG ELEVATIONS & PLAN Drawing · 02 Jun 2026
  • 09 GRID SUBSTN 400 KV BLDG ELEVATIONS & PLAN Drawing · 02 Jun 2026
  • NON TECHNICAL SUMMARY EIA Report - Vol 1 · 11 May 2026
  • EIA CHAPTER 01 - INTRODUCTION EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 02 - POLICY AND LEGISLATIVE CONTEXT EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 03 - PROJECT DESCRIPTION EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 04 - CONSIDERATION OF ALTERNATIVES EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 05 - APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 06 - SOCIO ECONOMICS EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 07 - CLIMATE RESILIENCE EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 08 - GREENHOUSE GASES EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 09 - LVIA EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 10 - ONSHORE ECOLOGY AND ORNITHOLOGY EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 11 - ONSHORE ARCHAEOLOGY AND CULTURAL HERITAGE EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 12 - TRAFFIC AND ACCESS EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 14 - HYDROLGY AND HYDROGEOLOGY EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 15 - AIRBORNE NOISE AND VIBRATION EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 16 - AIR QUALITY EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 17 - LAND USE EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 18 - HUMAN HEALTH EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 19 - SIGNIFICANT RESIDUAL EFFECTS EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 20 - SCHEDULE OF EIAR COMMITMENTS EIA Report - Vol 2 · 11 May 2026
  • EIA CHAPTER 21 - COMBINED AND WHOLE PROJECT ASSESSMENT EIA Report - Vol 2 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 01 - INTRODUCTION EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 03 - PROJECT DESCRIPTION EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 04 - CONSIDERATION OF ALTERNATIVES EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 05 - APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 06 - SOCIO ECONOMICS EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 10 - ONSHORE ECOLOGY AND ORNITHOLOGY EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 11 - ONSHORE ARCHAEOLOGY AND CULTURAL HERITAGE EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 12 - TRAFFIC AND ACCESS EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND PART 1 EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND PART 2 EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND PART 3 EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 13 - PEAT, GEOLOGY, SOILS AND CONTAMINATED LAND PART 4 EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 14 - HYDROLOGY & HYDROGEOLOGY EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 15 - AIRBORNE NOISE AND VIBRATION EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 16 - AIR QUALITY EIA Report - Vol 3 · 11 May 2026
  • EIA FIGURES FOR CHAPTER 17 - LAND USE, TOURISM AND RECREATION EIA Report - Vol 3 · 11 May 2026
  • 09.31_VP54_CREED BRIDGE CAR PARK EIA Report - Vol 4 · 11 May 2026
  • 09.30 RATHAD A BHUNA EIA Report - Vol 4 · 11 May 2026
  • 09.29_VP52 PENTLAND ROAD WEST EIA Report - Vol 4 · 11 May 2026
  • 09.28_VP51_MARYBANK PICNIC BENCHES EIA Report - Vol 4 · 11 May 2026
  • 09.27_VP50 CNOC NA CROIC SOUTHERN PATH EIA Report - Vol 4 · 11 May 2026
  • 09.26_VP49_A859 CREED ENTERPRISE PARK EIA Report - Vol 4 · 11 May 2026
  • 09.25_VP48 ARNISH ROAD EIA Report - Vol 4 · 11 May 2026
  • 09.24_VP47 PENTLAND ROAD MARYBANK EIA Report - Vol 4 · 11 May 2026
  • 09.23_VP46_A859/B897 JUNCTION WEST OF STORNOWA EIA Report - Vol 4 · 11 May 2026
  • 09.22_VP45 LEWIS WAR MEMORIAL EIA Report - Vol 4 · 11 May 2026
  • 09.21_VP21_A857 INLAND SOUTH OF BARVAS EIA Report - Vol 4 · 11 May 2026
  • 09.20_VP44 MORVEN MINOR ROAD EIA Report - Vol 4 · 11 May 2026
  • 09.19_VP43 DRUIM NAN CARNAN EIA Report - Vol 4 · 11 May 2026
  • 09.18_VP13 BARVAS EIA Report - Vol 4 · 11 May 2026
  • 09.17_VP11 NORTH OF BRUE EIA Report - Vol 4 · 11 May 2026
  • 09.16_VP10 BARVAS BEACH EIA Report - Vol 4 · 11 May 2026
  • 09.15_VP9 UPPER BARVAS EIA Report - Vol 4 · 11 May 2026
  • 09.14_VP8 UPPER BARVAS CEMETERY EIA Report - Vol 4 · 11 May 2026
  • 09.13_VP7 CLACH AN TRUSEIL EIA Report - Vol 4 · 11 May 2026
  • 09.12_VP5 SHADER EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A16.1 DUST IMPACT ASSESSMENT, TRAFFIC MODEL INPUTS AND RESULTS EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A15.5 OPERATIONAL NOISE ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A15.4 CONSTRUCTION TRAFFIC NOISE ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A15.3 CONSTRUCTION NOISE AND VIBRATION ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A15.2 BASELINE NOISE SURVEY EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A15.1 LEGISLATION, POLICIES, AND PLANS AND GUIDANCE EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A14.3 SCHEDULE OF WATERCOURSE CROSSINGS EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A14.2 GDWTE ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A14.1 FLOOD RISK ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A13.2 PRELIMINARY GEO-ENVIRONMENTAL RISK ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A13.1 PLHRA_WEBSITE LINK EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A12.1 ABNORMAL LOAD ROUTE ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A11.5 ONSHORE OUTLINE WRITTEN SCHEME OF INVESTIGATION EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A11.4 TRIAL TRENCHING REPORT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A11.3 CULTURAL HERITAGE BASELINE REPORT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A11.2 GAZETTEER EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A11.1 CULTURAL HERITAGE LEGISLATION, POLICIES, PLANS AND GUIDANCE EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.7 HABITAT LOSS RATIONALE AND CALCULATIONS EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.6 SCREENING OF ECOLOGICAL FEATURES RATIONALE EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.5 ONSHORE AQUATIC HABITAT SURVEY EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.4 ORNITHOLOGY TECHNICAL REPORT YEAR 2 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.3 ORNITHOLOGY TECHNICAL REPORT YEAR 1 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.2 HABITATS AND VEGETATION SURVEY REPORT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.2 HABITATS AND VEGETATION SURVEY REPORT ANNEXES PART 3 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.2 HABITATS AND VEGETATION SURVEY REPORT ANNEXES PART 2 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.2 HABITATS AND VEGETATION SURVEY REPORT ANNEXES PART 1 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A10.1 ECOLOGICAL DESK STUDY EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A09.3 COLOUR STUDY EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A09.2 FIGURES AND VISUALISATIONS PART 1 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A09.2 FIGURES AND VISUALISATIONS PART 2 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A09.2 FIGURES AND VISUALISATIONS PART 3 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A09.2 FIGURES AND VISUALISATIONS PART 4 EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A09.2 FIGURES AND VISUALISATIONS COVER WEBSITE LINKS EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A09.1 LVIA METHODOLOGY EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A07.1 CLIMATE CHANGE VULNERABILITY ASSESSMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A06.2 FOCUS GROUP SUMMARY REPORT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A06.1 DETAILED SOCIAL AND ECONOMIC BASELINE EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A05.3 OFFSHORE PROJECT DESCRIPTION SUMMARY EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A05.2 ONSHORE STAKEHOLDER CONSULTATION AND ENGAGEMENT EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A05.1 EIA REGULATIONS REQUIREMENTS EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A03.1 CROSSING SCHEDULE EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A01.2 COMPETENT EXPERTS EIA Report - Vol 4 · 11 May 2026
  • APPENDIX A01.1 GLOASSARY AND ABBREVIATIONS EIA Report - Vol 4 · 11 May 2026
  • 06.9 - ONSHORE PAC REPORT PART 4 EIA Report - Vol 6 · 11 May 2026
  • 06.9 - ONSHORE PAC REPORT PART 3 EIA Report - Vol 6 · 11 May 2026
  • 06.9 - ONSHORE PAC REPORT PART 2 EIA Report - Vol 6 · 11 May 2026
  • 06.9 - ONSHORE PAC REPORT PART 1 EIA Report - Vol 6 · 11 May 2026
  • 06.8 OUTLINE SOIL AND PEAT MANAGEMENT EIA Report - Vol 6 · 11 May 2026
  • 06.7 OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN EIA Report - Vol 6 · 11 May 2026
  • 06.6 OUTLINE CEMP EIA Report - Vol 6 · 11 May 2026
  • 06.5 OUTLINE BIRD PROTECTION PLAN EIA Report - Vol 6 · 11 May 2026
  • 06.4 OUTLINE BREP EIA Report - Vol 6 · 11 May 2026
  • 06.3 ONSHORE RIAA EIA Report - Vol 6 · 11 May 2026
  • 06.2 DESIGN AND ACCESS STATEMENT EIA Report - Vol 6 · 11 May 2026
  • APPENDIX 9.2 LIST OF FIGURES/VISUALISATIONS EIA Report - Vol 4 · 11 May 2026
  • SPIORAD NA MARA ONSHORE TRANSMISSION WORKS PLANNING STATEMENT Planning Statement · 08 May 2026
  • 14 INDICATIVE JOINT BAY AND LINK BOX PLAN AND SECTION Drawing · 08 May 2026
  • 03 LANDFALL SUBSTN SITE PLAN Drawing · 08 May 2026
  • 17 SUBSTN 1 TEMP CONSTRUCTION COMPOUNDS Drawing · 08 May 2026
  • 16 LANDFALL HDD TEMP CONSTRUCTION COMPOUND Drawing · 08 May 2026
  • 19 TYPICAL CABLE CORRIDOR TEMP CONSTRUCTION COMPOUNDS Drawing · 08 May 2026
  • 20 TYPICAL CABLE HDD CORRIDOR TEMP CONSTRUCTION COMPOUND Drawing · 08 May 2026
  • 13 INDICATIVE CABLE TRENCH DETAILS Drawing · 08 May 2026
  • 21 ACCESS JUNCTION TO LANDFALL Drawing · 08 May 2026
  • 23 TYPICAL CABLE CORRIDOR BELL MOUTH ACCESS Drawing · 08 May 2026
  • 15 TYPICAL HDD RIVER CROSSING ALIGNMENT AND PROFILE Drawing · 08 May 2026
  • 12 2XHDD LANDFALL CABLE ROUTE PLAN Drawing · 08 May 2026
  • 22 ACCESS TO SUBSTN 2 Drawing · 08 May 2026
  • 18 SUBSTN 2 TEMP CONSTRUCTION COMPOUND Drawing · 08 May 2026
  • 07 GRID SUBSTN SITE PLAN Drawing · 08 May 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Na h-Eileanan Siar for determination, against a statutory target of eight weeks. Over the last year Na h-Eileanan Siar decided full applications in a median of 80 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Na h-Eileanan Siar

  • 23/00507/PPD Granted

    Workshop Carloway Pier Knock Carloway Isle Of Lewis

    Site portable unit for a community workshop for marine plastic recycling solutions

    Received 12 Nov, published by the council 4 Aug 2026 Full applications
  • 26/00301/PPD Granted

    Storage Container Port Of Ness Ness Isle Of Lewis

    Siting of 3x shipping containers.

    Received 5 Aug, published by the council 22 Aug 2026 Full applications
  • 26/00293/PPD Granted

    Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET

    Erect storage building

    Received 27 Jul, published by the council 4 Aug 2026 Full applications
  • 26/00100/PPD Granted

    Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT

    Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.

    Received 13 Mar, published by the council 27 Jul 2026 Full applications
  • 26/00342/PPD Granted

    Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH

    Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.

    Received 28 Aug, published by the council 1 Sep 2026 Full applications