Skip to content
PlanIndex Get alerts
Menu

Planning application

18B Garrygall Castlebay Isle Of Barra

Awaiting decision Na h-Eileanan Siar 26/00092/PPD Planning Permission (Detailed)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erect dwelling house, vehicle access and associated parking. Renewal of previous consent 22/00332/PPD

As published by the council, reference 26/00092/PPD

Application record

Reference
26/00092/PPD
Type
Planning Permission (Detailed)
Status
Awaiting decision
Received
9 Mar 2026
Validated
18 Mar 2026
Ward
Barraigh Agus Bhatarsaigh
Parish
Castlebay & Vatersay
Decision by
Delegate Decision

Timeline

Dates from the published record

  1. 9 Mar 2026

    Received by Na h-Eileanan Siar

  2. 18 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Na h-Eileanan Siar took a median of 58 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Per Soderqvist Architect Ltd Agent, an architecture practice registered in Glasgow

Active · incorporated 2020 · Glasgow

5 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

  • 13 SITE PLAN - PROPOSED Drawing · 14 Sep 2026
  • BS - RESPONSE Consultation · 14 Sep 2026
  • SEPA - RESPONSE Consultation · 19 Aug 2026
  • SW - RESPONSE Consultation · 11 Aug 2026
  • 04A AMENDED SITE LAYOUT Drawing · 10 Aug 2026
  • 12 LONG SECTION - PROPOSED Drawing · 10 Aug 2026
  • SCOTTISH WATER - RESPONSE Consultation · 31 Mar 2026
  • ROADS - RESPONSE Consultation · 31 Mar 2026
  • GB ADVERT Other · 30 Mar 2026
  • LIST OF NEIGHBOURS NOTIFIED Other · 18 Mar 2026
  • 11 EXISTING SITE PLAN Drawing · 09 Mar 2026
  • 02 PROPOSED SITE PLAN SCALE 500 Drawing · 09 Mar 2026
  • 03 PROPOSED SITE PLAN SCALE 200 Drawing · 09 Mar 2026
  • 08 PROPOSED SITE SECTIONS 1 Drawing · 09 Mar 2026
  • 09 PROPOSED SITE SECTIONS 2 Drawing · 09 Mar 2026
  • 06 PROPOSED FLOOR PLAN Drawing · 09 Mar 2026
  • 07 PROPOSED ROOF PLAN Drawing · 09 Mar 2026
  • 05 PROPOSED ELEVATIONS Drawing · 09 Mar 2026
  • 10 PROPOSED SECTIONS Drawing · 09 Mar 2026
  • 01 LOCATION PLAN Drawing · 09 Mar 2026
  • APPLICATION FORM Application Form · 09 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Na h-Eileanan Siar for determination, against a statutory target of eight weeks. Over the last year Na h-Eileanan Siar decided full applications in a median of 80 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Na h-Eileanan Siar

  • 23/00507/PPD Granted

    Workshop Carloway Pier Knock Carloway Isle Of Lewis

    Site portable unit for a community workshop for marine plastic recycling solutions

    Received 12 Nov, published by the council 4 Aug 2026 Full applications
  • 26/00301/PPD Granted

    Storage Container Port Of Ness Ness Isle Of Lewis

    Siting of 3x shipping containers.

    Received 5 Aug, published by the council 22 Aug 2026 Full applications
  • 26/00293/PPD Granted

    Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET

    Erect storage building

    Received 27 Jul, published by the council 4 Aug 2026 Full applications
  • 26/00100/PPD Granted

    Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT

    Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.

    Received 13 Mar, published by the council 27 Jul 2026 Full applications
  • 26/00342/PPD Granted

    Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH

    Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.

    Received 28 Aug, published by the council 1 Sep 2026 Full applications