Planning application
27 Cuthil Road Keith Moray AB55 5AS
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Retrospective application to replace timber garage with steel framed metal clad garage at
As published by the council, reference 26/01105/APP
Application record
- Reference
- 26/01105/APP
- Type
- Application for Planning Permission
- Status
- Awaiting decision
- Received
- 1 Sep 2026
- Validated
- 1 Sep 2026
- Ward
- Keith And Cullen
- Parish
- Keith
- Postcode
- AB55 5AS
Comment by 15 September 2026
The council is taking comments on this application until then. Have your say on Moray's portal.
Timeline
Dates from the published record
-
1 Sep 2026
Received by Moray
-
4 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Moray took a median of 82 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Moray for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
56 Land Street Keith Moray AB55 5AW
Change of use from former commercial store back to residential area inclusive of bedroom and bathroom at
Granted Full applications 5 docs -
56 Land Street Keith Moray AB55 5AW
Internal alterations to ground floor blocking up existing openings and two replacement windows at
Granted Heritage and listed buildings Windows or glazing 5 docs -
9 Chapel Street Keith Moray AB55 5AD
Install replacement grey UPVC windows and doors at
Granted Full applications Windows or glazing 11 docs -
9 Chapel Street Keith Moray AB55 5AD
Install replacement windows and doors at
Granted Heritage and listed buildings Windows or glazing 10 docs -
Site To The Rear Of 8 Seafield Walk Seafield Walk Keith AB55 5BW
96% historically approved · decision due ~19 Aug
Proposed dwellinghouse on
Awaiting decision Outline 18 docsDomestic -
Site Adjacent To 8 Seafield Walk Keith AB55 5BW
Erect 1no dwellinghouse with double garage linked by car port on
Granted Full applications 7 docsDomestic
Other full applications applications
In Moray
-
26/00390/APP Granted
Brodieshill Farmhouse Forres Moray IV36 2QU
Change of use of children's play unit to letting unit at
-
25/01064/APP Granted
Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray
Retrospective consent to site and operate a mobile sauna for 4 days a week on
-
26/00677/APP Granted
Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray
Change existing metal halide floodlighting to LED at
-
26/00757/APP Granted
Tarnash Farm Keith Moray AB55 5PB
Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at
-
26/00662/APP Granted
Glendullan Distillery Dufftown Keith Moray AB55 4DJ
Convert existing oil bund into new process building for the installation of new heat pumps at