Skip to content
PlanIndex Get alerts
Menu

Planning application

27 Cuthil Road Keith Moray AB55 5AS

Awaiting decision Moray 26/01105/APP Application for Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Retrospective application to replace timber garage with steel framed metal clad garage at

As published by the council, reference 26/01105/APP

Application record

Reference
26/01105/APP
Type
Application for Planning Permission
Status
Awaiting decision
Received
1 Sep 2026
Validated
1 Sep 2026
Ward
Keith And Cullen
Parish
Keith
Postcode
AB55 5AS

Comment by 15 September 2026

The council is taking comments on this application until then. Have your say on Moray's portal.

Timeline

Dates from the published record

  1. 1 Sep 2026

    Received by Moray

  2. 4 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Moray took a median of 82 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Moray for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 56 Land Street Keith Moray AB55 5AW

    25/00201/APP Submitted 24 Feb 2025 143m away

    Change of use from former commercial store back to residential area inclusive of bedroom and bathroom at

    Granted Full applications 5 docs
  • 56 Land Street Keith Moray AB55 5AW

    25/00202/LBC Submitted 24 Feb 2025 143m away

    Internal alterations to ground floor blocking up existing openings and two replacement windows at

    Granted Heritage and listed buildings Windows or glazing 5 docs
  • 9 Chapel Street Keith Moray AB55 5AD

    22/01699/APP Submitted 17 Nov 2022 186m away

    Install replacement grey UPVC windows and doors at

    Granted Full applications Windows or glazing 11 docs
  • 9 Chapel Street Keith Moray AB55 5AD

    22/01700/LBC Submitted 17 Nov 2022 186m away

    Install replacement windows and doors at

    Granted Heritage and listed buildings Windows or glazing 10 docs
  • Site To The Rear Of 8 Seafield Walk Seafield Walk Keith AB55 5BW

    26/00796/PPP Submitted 24 Jun 2026 206m away

    96% historically approved · decision due ~19 Aug

    Proposed dwellinghouse on

    Awaiting decision Outline 18 docs
    Domestic
  • Site Adjacent To 8 Seafield Walk Keith AB55 5BW

    26/00135/APP Submitted 3 Feb 2026 212m away

    Erect 1no dwellinghouse with double garage linked by car port on

    Granted Full applications 7 docs
    Domestic

In Moray

  • 26/00390/APP Granted

    Brodieshill Farmhouse Forres Moray IV36 2QU

    Change of use of children's play unit to letting unit at

    1 Apr 2026 Full applications
  • 25/01064/APP Granted

    Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray

    Retrospective consent to site and operate a mobile sauna for 4 days a week on

    28 Aug 2025 Full applications
  • 26/00677/APP Granted

    Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray

    Change existing metal halide floodlighting to LED at

    29 May 2026 Full applications
  • 26/00757/APP Granted

    Tarnash Farm Keith Moray AB55 5PB

    Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at

    16 Jun 2026 Full applications
  • 26/00662/APP Granted

    Glendullan Distillery Dufftown Keith Moray AB55 4DJ

    Convert existing oil bund into new process building for the installation of new heat pumps at

    27 May 2026 Full applications