Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Chapel Street Keith Moray AB55 5AD

Granted Moray 22/01699/APP Application for Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Install replacement grey UPVC windows and doors at

As published by the council, reference 22/01699/APP

Application record

Reference
22/01699/APP
Type
Application for Planning Permission
Status
Decided
Decision
Permitted
Received
17 Nov 2022
Validated
18 Nov 2022
Decided
24 Mar 2023
Ward
Keith And Cullen
Parish
Keith
Decision by
Delegated Power
Postcode
AB55 5AD

Timeline

Dates from the published record

  1. 17 Nov 2022

    Received by Moray

  2. 18 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 24 Mar 2023

    Decision issued: Permitted

  4. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Chapel Street Keith Moray AB55 5AD

    22/01700/LBC Submitted 17 Nov 2022 0m away

    Install replacement windows and doors at

    Granted Heritage and listed buildings Windows or glazing 10 docs
  • 56 Land Street Keith Moray AB55 5AW

    25/00201/APP Submitted 24 Feb 2025 49m away

    Change of use from former commercial store back to residential area inclusive of bedroom and bathroom at

    Granted Full applications 5 docs
  • 56 Land Street Keith Moray AB55 5AW

    25/00202/LBC Submitted 24 Feb 2025 49m away

    Internal alterations to ground floor blocking up existing openings and two replacement windows at

    Granted Heritage and listed buildings Windows or glazing 5 docs
  • 51 Mid Street Keith Moray AB55 5AH

    25/00058/LBC Submitted 16 Jan 2025 114m away

    Stonework and roof repairs at

    Granted Heritage and listed buildings 5 docs
  • 30 - 32 Mid Street Keith Moray

    22/01228/APP Submitted 22 Aug 2022 137m away

    Redevelopment of existing buildings and proposed extension to form new build flats

    Granted Full applications New dwelling Extension 7 docs
  • 30 - 32 Mid Street Keith Moray

    26/00863/APP Submitted 10 Jul 2026 137m away

    97% historically approved · decision due ~7 Sep

    Internal alterations and extensions for two townhouses at

    Awaiting decision Full applications Extension 10 docs

In Moray

  • 26/00390/APP Granted

    Brodieshill Farmhouse Forres Moray IV36 2QU

    Change of use of children's play unit to letting unit at

    1 Apr 2026 Full applications
  • 25/01064/APP Granted

    Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray

    Retrospective consent to site and operate a mobile sauna for 4 days a week on

    28 Aug 2025 Full applications
  • 26/00677/APP Granted

    Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray

    Change existing metal halide floodlighting to LED at

    29 May 2026 Full applications
  • 26/01105/APP Awaiting decision

    27 Cuthil Road Keith Moray AB55 5AS

    Retrospective application to replace timber garage with steel framed metal clad garage at

    1 Sep 2026 Full applications
  • 26/00757/APP Granted

    Tarnash Farm Keith Moray AB55 5PB

    Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at

    16 Jun 2026 Full applications