Planning application
Letterfourie House Drybridge Buckie Moray AB56 5JP
Works: Loft or dormer
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Internal alterations and amendments to roof lights
As published by the council, reference 26/00277/LBC
Application record
- Reference
- 26/00277/LBC
- Type
- Listed Building Consent
- Status
- Awaiting decision
- Received
- 5 Mar 2026
- Validated
- 6 Mar 2026
- Ward
- Keith And Cullen
- Parish
- Buckie & District
- Decision by
- Delegated Power
- Postcode
- AB56 5JP
Timeline
Dates from the published record
-
5 Mar 2026
Received by Moray
-
6 Mar 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Moray took a median of 88 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 25/00079/LBC (Decided)
- Application: 86/00597/LBC (Decided)
- Application: 92/01401/FUL (Decided)
- Application: 92/01402/LBC (Decided)
- Scottishbuildingwarrant: 26/00200/BW (Pending Consideration)
Who's behind it
Company information only, from the register and Companies House
CM DESIGN Agent, a design practice registered in Bolton
Dissolved · incorporated 1991 · Bolton
22 applications on PlanIndex · across 8 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
- HISTORIC ENVIRONMENT SCOTLAND
- THE BANFFSHIRE - 17.03.2026
- SITE AND LOCATION PLAN
- LISTED BUILDING BUILDING CONSENT
- ELEVATIONS
- GROUND FLOOR FIREPLACES
- EXISTING GROUND FLOOR PLAN
- FIRST FLOOR PLAN - ROOF LIGHTS
- EXISTING LOWER GROUND FLOOR PLAN
- PROPOSED LOWER GROUND FLOOR PLAN
- EXISTING GROUND FLOOR PLAN - WEST WING
- LOWER GROUND FLOOR PLAN - EAST WING
- EXISTING GROUND FLOOR PLAN - EAST WING
- PROPOSED GROUND FLOOR PLAN - WEST WING
- EXISTING SECOND FLOOR PLAN
- PROPOSED GROUND FLOOR PLAN - EAST WING
- EXISTING LOWER GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN - EAST WING
- EXISTING LOWER GROUND FLOOR PLAN
- PROPOSED GROUND FLOOR PLAN - WEST WING
- EXISTING FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- SUPPORTING STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Moray for determination, against a statutory target of eight weeks. Over the last year Moray decided heritage and listed building applications in a median of 78 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Braeside Drybridge Buckie Moray AB56 5JB
Alter dwellinghouse and new composite deck at
Granted Full applications 13 docsDomestic
Other heritage and listed building applications
In Moray
-
26/00926/LBC Granted
214 Seatown Cullen Buckie Moray AB56 4SJ
Alter and extend dwellinghouse at
-
26/01167/LBC Awaiting decision
94 High Street Elgin Moray IV30 1BJ
Installation of combined defibrillator and bleed kit cabinet to external wall of Nationwide Building Society branch
-
26/01131/LBC Awaiting decision
St Giles And St Columbas South Church Office Duff Avenue Elgin Moray IV30 1QS
Replace existing plain glass window on the south elevation with a new stain glass window at
-
26/01072/LBC Awaiting decision
52 Seafield Street Cullen Buckie Moray AB56 4SW
Installation of secondary glazing to windows at
-
26/00782/LBC Granted
Spynie Parish Church Elgin Moray IV30 8XJ
Remove wooden pews benches partitions platforms and steps wood panelling within existing church at