Construct a 275 / 33kV Corshellach substation associated undertaking of earthworks formation of platform landscaping means of access means of enclosure site drainage temporary construction compounds and other associated operations on
As published by the council, reference 26/00149/APP
Application record
- Reference
- 26/00149/APP
- Type
- Application for Planning Permission
- Status
- Awaiting decision
- Received
- 5 Feb 2026
- Validated
- 27 Feb 2026
- Ward
- Forres
- Parish
- Finderne
- Decision by
- Committee - National/Major
Site history
Applications at this address on the Moray register
This site has had 2 applications since 2024.
-
24/01438/SCN Decided
Land Adjacent To Electricity Substation Berryburn Dunphail Forres Moray
Substation compound on
Timeline
Dates from the published record
-
5 Feb 2026
Received by Moray
-
27 Feb 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Moray took a median of 88 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
80 documents on file for this application
- FORRES GAZETTE - 02.09.2026
- TRANSPORTATION MANAGEMENT - UPDATED
- TRANSPORT MANAGER
- ENVIRONMENTAL HEALTH
- PRIVATE WATER SUPPLY - UPDATED
- DEVELOPER OBLIGATIONS
- MORAY FLOOD RISK MANAGEMENT
- PRIVATE WATER SUPPLIES
- ABERDEENSHIRE COUNCIL ARCHAEOLOGY SERVICE
- CONTAMINATED LAND
- HSE
- MORAY ACCESS MANAGER - HOLDING
- APPENDIX 1-1 -SCREENING OPINION
- APPENDIX 2-1 - CARBON ASSESSMENT
- APPENDIX 3-1 - SSENT GEMPS
- APPENDIX 3-3 - NOISE ASSESSMENT
- APPENDIX 3-4 - OUTDOOR LIGHTING REPORT
- APPENDIX 3-5 - TRANSPORT STATEMENT - PART 1 OF 2
- APPENDIX 3-5 - TRANSPORT STATEMENT - PART 2 OF 2
- APPENDIX 4-2 - BIODIVERSITY NET GAIN ASSESSMENT REPORT
- APPENDIX 4-3 - BNG AND IRREPLACEABLE HABITAT STRATEGY
- APPENDIX 6-1 - CA ASSETS WITHIN THE INNER STUDY AREA
- APPENDIX 6-2 - DESIGNATED CA ASSETS WITHIN THE OUTER S
- APPENDIX 7-1 - DRAINAGE IMPACT ASSESSMENT
- APPENDIX 7-2 - LEVEL 1 FLOOD RISK ASSESSMENT
- APPENDIX 8-1 - WOODLAND REPORT
- APPENDIX 8-2 - TREE REMOVAL PLAN
- CHAPTER 1 - INTRODUCTION AND BACKGROUND
- CHAPTER 2 - SITE SELECTION PROCESS
- CHAPTER 3 - THE PROPOSED DEVELOPMENT
- CHAPTER 4 - ECOLOGY
- CHAPTER 5 - LANDSCAPE AND VISUAL
- CHAPTER 6 - CULTURAL HERITAGE
- CHAPTER 7 - GEOLOGY SOILS AND WATER
- CHAPTER 8 - FORESTRY
- CHAPTER 9 - SCHEDULE OF MITIGATION
- CONSTRUCTION PLAN FLOOD RISK MAPPING
- CONTENTS AND GLOSSARY
- CONTROL BUILDING ELEVATIONS
- CONTROL BUILDING ROOF PLAN
- DESIGN AND ACCESS STATEMENT
- DRAINAGE DETAILS
- DRAINAGE DITCH LONG SECTIONS
- PROPOSED DRAINAGE LAYOUT
- EXISTING & PROPOSED PLATFORM & ACCESS ROAD SECTIONS
- EXISTING & PROPOSED SUBSTATION PLATFORM SECTIONS
- EXISTING SITE TOPOGRAPHY
- LOCATION PLAN
- FIGURE 2-1 - SUBSTATION SITE OPTIONS
- FIGURE 3-1 - THE PROPOSED DEVELOPMENT
- FIGURE 3_2A - VP1 FARQUHAR FARM - LOCATION PLAN
- FIGURE 3-2B - VIEWPOINT FROM FARQUHAR FARM - BASELINE
- FIGURE 3-2C - VIEWPOINT FROM FARQUHAR FARM - PHOTOMONT
- FIGURE 3-2D - VIEWPOINT FROM FARQUHAR FARM - PHOTOMONT
- FIGURE 3-2E - VIEWPOINT FROM FARQUHAR FARM - PHOTOMONT
- FIGURE 4-1 - SITES DESIGNATED FOR NATURE CONSERVATION
- FIGURE 5-1 - STUDY AREA WITH ZTV
- FIGURE 5-2 - DESIGNATED AND PROTECTED LANDSCAPES WITH
- FIGURE 5-3 - LANDSCAPE CHARACTER TYPES WITH ZTV
- FIGURE 5-4 - VISUAL RECEPTORS INCLUDED WITHIN ASSESSME
- FIGURE 5-5 - CUMULATIVE DEVELOPMENTS
- FIGURE 5-6 - LANDSCAPE MITIGATION PROPOSAL
- FIGURE 6-1 - CULTURAL HERITAGE ASSETS WITHIN THE INNER
- FIGURE 6-2 - DESIGNATED CULTURAL HERITAGE ASSETS WITHI
- FIGURE 7-1 - LOCAL HYDROLOGY
- FIGURE 7-2 - SUPERFICIAL GEOLOGY
- FIGURE 7-3 - PEATLAND CLASSIFICATION
- FIGURE 7-4 - PEAT DEPTH PLAN
- FIGURE 8-1 - FORESTRY STUDY AREA
- LOCATION PLANS
- PERMANENT INTERNAL ROAD ARRANGEMENTS PLAN AND DETAIL
- PLANNING STATEMENT - INCLUDING COMPLIANCE STATEMENT
- APPLICATION FOR PLANNING PERMISSION
- PRE-APPLICATION CONSULTATION REPORT
- PROPOSED SITE PLAN
- PROPOSED SITE TOPOGRAPHY
- SITE PLAN FLOOD RISK MAPPING
- SITE WATER SUPPLY LAYOUT
- TEMPORARY DRAINAGE LAYOUT
- TEMPORARY SITE COMPOUND AND ACCESS
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Moray for determination, against a statutory target of eight weeks. Over the last year Moray decided full applications in a median of 96 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land To West Of Berryburn Substation Moray
Development of a battery energy storage system on
Decided Outline 2 docs -
Land West Of Electricity Substation Berryburn Dunphail Forres Moray
Development of a battery energy storage system on
Decided Outline 2 docs -
Land At Clash Gour Dunphail Forres Moray
Install and keep a 275kilovolt (kv) steel lattice overhead electricity line (OHL) located approximately 10km south of Forres and 22km south-west of Elgin on
Decided Outline
Other full applications
In Moray
-
26/00659/APP Granted
The Lairds Apartment Brodie Castle Brodie Forres Moray IV36 2TE
Change of use from short term let to apartment/rooms to be used as part of castle tour
-
26/00723/APP Granted
6 Cuttlebrae Cottages Clochan Buckie Moray AB56 5HS
Demolish existing extension erect new extension and alterations to dwellinghouse at
-
26/00260/APP Granted
Glen Keith Distillery Station Road Keith Moray AB55 5BU
Proposed extension to form chiller room at
-
26/00925/APP Granted
214 Seatown Cullen Buckie Moray AB56 4SJ
Alter and extend dwellinghouse at
-
26/01173/APP Awaiting decision
Maryfield Findhorn Forres Moray IV36 3YY
Renewal planning consent 23/00839/APP to alter dwellinghouse to form attic accommodation at