Planning application
Mortlach Distillery Fife Street Dufftown Keith Moray AB55 4AQ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Hazardous Substances Consent to store ethanol/water mixture at
As published by the council, reference 25/01295/HAZ
Application record
- Reference
- 25/01295/HAZ
- Type
- Hazardous Substances
- Status
- Awaiting decision
- Received
- 8 Oct 2025
- Validated
- 10 Nov 2025
- Ward
- Speyside Glenlivet
- Parish
- Dufftown & District
- Decision by
- Delegated Power
- Postcode
- AB55 4AQ
Timeline
Dates from the published record
-
8 Oct 2025
Received by Moray
-
10 Nov 2025
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Moray took a median of 88 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Diageo Scotland Limited Applicant, registered in Edinburgh
Active · incorporated 1877 · Edinburgh
6 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
- SITE LAYOUT
- SEPA
- NORTHERN SCOT - 21.11.2025
- SITE LOCATION PLAN
- GENERAL ARRANGEMENT
- PROCESS BUILDING GROUND FLOOR PLAN
- PROCESS BUILDING FIRST FLOOR PLAN
- DUTY FREE WAREHOUSE 3&5 GROUND FLOOR PLAN
- DUTY FREE WAREHOUSE 4&6 FIRST FLOOR PLAN
- SPIRIT TANKER LOADING GENERAL ARRANGEMENT
- COVERING LETTER
- HAZARDOUS SUBSTANCES
- LOCATION PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Moray for determination, against a statutory target of eight weeks. Over the last year Moray's median decision took 88 days. More in our guide to how long planning decisions take.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Site Adjacent To Tommridh Cowie Avenue Dufftown Keith Moray
Erect a dwellinghouse and associated works on
Granted Full applications 10 docsDomestic -
Abbeyfield 55 Fife Street Dufftown Keith Moray AB55 4AP
Use 3 of 5 bedrooms to be used as en-suite guest accommodation at
Granted Full applications 7 docs -
Clan Y Mor 51 Fife Street Dufftown Keith Moray AB55 4AP
Upgrade existing stone outbuilding and new connection link to existing timber shed at
Granted Heritage and listed buildings 9 docsSmall domestic -
Clan Y Mor 51 Fife Street Dufftown Keith Moray AB55 4AP
Retrospective consent to upgrade existing stone outbuilding and new connection link to existing timber shed at
Granted Full applications 8 docsSmall domestic -
40 Church Street Dufftown Keith Moray AB55 4AR
Proposed renovation formation of balcony and minor internal alterations at
Granted Full applications 6 docs -
Ben Main 49 Fife Street Dufftown Keith Moray AB55 4AP
Widen gateway by approximately 1000mm at
Granted Full applications 10 docs
Other less common application types
In Moray
-
25/01116/APP Granted
Land At Rosarie Quarry Keith Moray
Part retrospective planning permission for the construction of agricultural road initial hard rock mineral extraction and mineral processing and construction of temporary junction and part new planning permission for extension of hard rock mineral extraction processing area new access junction and creation of ecological/biodiversity buffer and associated ancillary quarry infrastructure on
-
25/01298/HAZ Granted
Dailuaine Distillery Carron Aberlour Moray AB38 7RE
Hazardous Substances Consent to store ethanol/water mixture at
-
25/00354/MIN Refused
Land To South-east Of Dykeside Farm Birnie Elgin
The extraction of sand and gravel by quarrying and the operation of a ready mix concrete plant on
-
26/00180/HAZ Awaiting decision
Glendullan Distillery Dufftown Keith Moray AB55 4DJ
Hazardous Substance consent for ethanol/water mix at
-
26/00093/HAZ Awaiting decision
Glenrothes Distillery Burnside Street Rothes Aberlour Moray AB38 7AA
Hazardous Substance Consent for ethanol at