Planning application
Dorenell Wind Farm Lower Cabrach Huntly Moray AB54 4ES
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construct and operate a wind energy generating station of 67 wind turbines with ground to blade tip heights varying of 149.9m to 250m with associated infrastructure and includes a battery energy storage system at
As published by the council, reference 25/01005/S36
Application record
- Reference
- 25/01005/S36
- Type
- Dealt With By Scottish Executive
- Status
- Awaiting decision
- Received
- 14 Aug 2025
- Validated
- 14 Aug 2025
- Ward
- Speyside Glenlivet
- Parish
- Dufftown & District
- Decision by
- Committee - National/Major
- Postcode
- AB54 4ES
Timeline
Dates from the published record
-
14 Aug 2025
Received by Moray
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Moray took a median of 87 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Ramboll UK Limited Agent, registered in London
Active · incorporated 1998 · London
15 applications on PlanIndex · across 6 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDorenell Windfarm Extension Limited Applicant, registered in Cardiff
Active · incorporated 2020 · Cardiff
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
268 documents on file for this application
- PRIVATE WATER SUPPLIES - UPDATED
- TRANSPORTATION MANAGER - HOLDING
- PRIVATE WATER SUPPLY - HOLDING
- PRIVATE WATER SUPPLIES - HOLDING
- PRIVATE WATER SUPPLIES - HOLDING - HYDROLOGICAL ASSESSMENT
- PRIVATE WATER SUPPLIES - HOLDING - NAMED WATERCOURSES
- MORAY FLOOD RISK MANAGEMENT
- ABERDEENSHIRE COUNCIL ARCHAEOLOGY SERVICE
- DEVELOPER OBLIGATION RESPONSE
- VOLUME 2 - FIGURE 9.11 PEAT RESTORATION AREAS
- VOLUME 2 - FIGURE 9.11A PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11B PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11C PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11D PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11E PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11F PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11G PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11H PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11I PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.11J PEAT RESTRORATION AREAS
- VOLUME 2 - FIGURE 9.12 PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12A PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12C PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12B PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12D PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12E PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12F PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12G PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12H PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12I PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 9.12J PEAT;AND CONDITION ASSESSMENT
- VOLUME 2 - FIGURE 10.1 STUDY AREA
- VOLUME 2 - FIGURE 10.2 TRAFFIC COUNT LOCATIONS
- VOLUME 2 - FIGURE 10.3 PERSONAL INJURY ACCIDENT LOCATION PLAN
- VOLUME 2 - FIGURE 10.4 ABNORMAL INDIVIDUAL ROUTE DELIVERY PLAN
- VOLUME 2 - FIGURE 11.1 CONSTRUCTION NOISE ASSESSMENT STUDY AREA
- VOLUME 2 - FIGURE 11.2 OPERATIONAL NOISE ASSESSMENT & NOISE MONITORING LOCATIONS
- VOLUME 2 - FIGURE 11.3 CUMULATIVE WIND TURBINE LOCATIONS
- VOLUME 3 - VIEWPOINT N4 UPPER CABRACH
- VOLUME 3 - VIEWPOINT N9 GLENBUCHAT CASTLE
- VOLUME 3 - VIEWPOINT N12 COMMUNITY HALL BRAES OF GLENLIVET
- VOLUME 3 - VIEWPOINT 1 CREAG AN SGOR
- VOLUME 3 - VIEWPOINT 2 THE BUCK
- VOLUME 3 - VIEWPOINT 3 LITTLE GEAL CHARN
- VOLUME 3 - VIEWPOINT 4A-C UPPER CABRACH
- VOLUME 3 - VIEWPOINT 4D UPPER CABRACH
- VOLUME 3 - VIEWPOINT 5 LOWER CABRACH NR FORMER CHURCH
- VOLUME 3 - VIEWPOINT6 MINOR ROAD NEAR BADENYON
- VOLUME 3 - VIEWPOINT 7 MINOR ROAD BETWEEN COULL OF NEWE & GLEN BUCHAT
- VOLUME 3 - VIEWPOINT 8 RIVER DEVERON VALLEY
- VOLUME 3 - VIEWPOINT 9 GLENBUCHAT CASTLE
- VOLUME 3 - VIEWPOINT 10 CARN MOR IN THE LADDER HILLS
- VOLUME 3 - VIEWPOINT 11 BENNEWE
- VOLUME 3 - VIEWPOINT 12 COMMUNITY HALL BRAES OF GELNLIVET
- VOLUME 3 - VIEWPOINT 13A TOM TRUMPER NEAR COLLEGE OF SCALLAN
- VOLUME 3 - VIEWPOINT 13B TOM TRUMPER SUMMIT
- VOLUME 3 - VIEWPOINT 14 BEN RINNES
- VOLUME 3 - VIEWPOINT 15 TAP O' NOTH
- VOLUME 3 - VIEWPOINT 16 CARN DAIMH SPEYSIDE WAY
- VOLUME 3 - VIEWPOINT 17 TOMINTOUL
- VOLUME 3 - VIEWPOINT 18 SUIE VIEWPOINT CORREEN HILLS
- VOLUME 3 - VIEWPOINT 19 CAIRNAGOUR HILL
- VOLUME 3 - VIEWPOINT 20 CREAGAN A' CHAISE IN THE HILLS OF CROMDALE
- VOLUME 3 - VIEWPOINT 21 MEIKLE BALLOCH HILL
- VOLUME 3 - VIEWPOINT 22 OXEN CRAIG BENNACHIE
- VOLUME 3 - VIEWPOINT 23 BEN AVON
- VOLUME 3 - VIEWPOINT 24 CAIRNGORMS
- VOLUME 3 - VIEWPOINT 25 LOCHNAGAR
- VOLUME 3 - VIEWPOINT 6.3 SCHEDULE MONUMENT (SM11681) CNOC CAILLICHE
- VOLUME 3 - VIEWPOINT 6.4 SCHEDULE MONUMENT (SM13746) FORT CRAIG DORNEY
- VOLUME 3 - VIEWPOINT 6.5 SCHEDULE MONUMENT (SM63) TAO O' NORTH FORT
- VOLUME 3 - VIEWPOINT 6.6 SCHEULE MONUMENT (SM90151) GLENBUCHAT CASTLE
- VOLUME 3 - VIEWPOINT 6.7 SCHEULE MONUMENT (SM90024) AUCHINDOUN CASTLE - CASTLE &
- VOLUME 4 TECH APPENDIX 1.1 CONSULATION REGISTER
- VOLUME 4 - TECH APPENDIX 2.1 OUTLINE CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN
- VOLUME 4 - TECH APPENDIX 2.2 HIGH LEVEL ENVIRONMENTAL REVIEW OF ABNORMAL INDIVIS
- VOLUME 4 - TECH APPENDIX 2.3 BORROW PIT ASSESSMENT
- VOLUME 4 - TECH APPENDIX 2.4 CARBON BALANCE ASSESSMENT
- VOLUME 4 - TECH APPENDIX 3.1 LANDSCAPE DESIGN STATEMENT
- VOLUME 4 - TECH APPENDIX 5.1 LANDSCAPE & VISUAL IMPACT ASSESSMENT
- VOLUME 4 - TECH APPENDIX 5.2 VIEWPOINT ANALYSIS
- VOLUME 4 - TECH APPENDIX 5.3 RESIDENTIAL VISUAL AMENITY ASSESSMENT
- VOLUME 4 - TECH APPENDIX 5.4 NIGHT TIME LANDSCAPE & VISUAL IMPACT ASSESSMENT
- VOLUME 4 - TECH APPENDIX 6.1 CULTURAL HEROITAGE BASELINE & STAGE 1 SETTING ASSES
- VOLUME 4 - TECH APPENDIX 7.1 LEGISLATION & POLICY
- VOLUME 4 - TECH APPENDIX 8.2 COLLISION RISK MODEL
- VOLUME 4 - TECH APPENDIX 8.5 SAHDOW HABITATS REGULATIONS APPRAISAL ORNITHOLOGY
- VOLUME 4 - TECH APPENDIX 9.1 GOOD PRACTICE METHODS
- VOLUME 4 - TECH APPENDIX 9.2 APPENDIX I
- VOLUME 4 - TECH APPENDIX 9.2 APPENDIX II
- VOLUME 4 - TECH APPENDIX 9.2 APPENDIX III
- VOLUME 4 - TECH APPENDIX 9.2 APPENDIX IV
- VOLUME 4 - TECH APPENDIX 9.2 PEAT SURVEY REPORT
- VOLUME 4 - TECH APPENDIX 9.3 OUTLINE PEAT MANAGEMENT PLAN
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.1 ELEVATION
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.2 SLOPE
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.3 GEOLOGY
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.4 HYDROLOGY
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.5 GEOMORPHOLOGY & LAND USE
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.6A PEAT DEPTH WITH PROBE LOCATIONS
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.6B PEAT DEPTH WITH PROBE LOCATIONS
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.7 FACTOR OF SAFETY
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.8 CONTRIBUTORY FACTORS
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.9 LANDSLIDE LIKELIYHOOD
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.10 SOURCE & ROUTE ZONES
- VOLUME 4 - TECH APPENDIX FIGURE 9.4.11 CALCULATED RISK
- VOLUME 4 - TECH APPENDIX FIGURE 9.4 ANNEX 1
- VOLUME 4 - TECH APPENDIX FIGURE 9.4 PEAT LANDSLIDE RISK HAZARD ASSESSMENT
- VOLUME 4 - TECH APPENDIX FIGURE 9.5 WATERCOURSE CROSSING INVENTORY
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1A POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1B POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1C POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1D POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1E POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1F POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1G POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1H POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1I POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6.1J POTENTIAL GROUND WATER TERRESTRIAL ECOSYS
- VOLUME 4 - TECH APPENDIX FIGURE 9.6 GROUNDWATER DEPENDENT TERRESTRIL ECCOSYSTEMS
- VOLUME 4 - TECH APPENDIX FIGURE 9.7.1 WATER ABSTRATIONS
- VOLUME 4 - TECH APPENDIX FIGURE 9.7 PRIVATE WATER SUPPLY & ABSTRATION ASSESSMENT
- VOLUME 4 - TECH APPENDIX FIGURE 9.8 ANNEX 1 OBERSERVATION FROM SITE WALKOVER
- VOLUME 4 - TECH APPENDIX FIGURE 9.8 PAT CONDITION ASSESSMENT
- VOLUME 4 - TECH APPENDIX FIGURE 10.1 TRNSPORT ASSESSMENT PART 1
- VOLUME 4 - TECH APPENDIX FIGURE 10.1 TRNSPORT ASSESSMENT PART 2
- VOLUME 4 - TECH APPENDIX FIGURE 11.1 CONSTRUCTION NOISE ASSESSMENT
- VOLUME 4 - TECH APPENDIX FIGURE 112 OPERATIONAL NOISE REPORT PART 1
- VOLUME 4 - TECH APPENDIX FIGURE 112 OPERATIONAL NOISE REPORT PART 2
- VOLUME 4 - TECH APPENDIX FIGURE 112 OPERATIONAL NOISE REPORT PART 3
- VOLUME 4 - TECH APPENDIX FIGURE 112 OPERATIONAL NOISE REPORT PART 4
- VOLUME 2 - FIGURE 1.1 SITE LOCATION
- VOLUME 2 - FIGURE 2.1 SITE LAYOUT
- VOLUME 2 - FIGURE 2.2 TYPICAL TURBINE ELEVATIONS
- VOLUME 2 - FIGURE 2.3 TYPICAL TURBINE FOUNDATION DETAIL
- VOLUME 2 - FIGURE 2.4 TYPICAL CRANE HARDSTANDING(VESTAS V162)
- VOLUME 2 - FIGURE 2.5A NORTHERN SITE ACCESS JUNCTION GENERAL ARRANGEMENT
- VOLUME 2 - FIGURE 2.5B NORTHER SITE ACCESS GENERAL ARRANGEMENT & VISIBILITY
- VOLUME 2 - FIGURE 2.7 TYPICAL CABLE TRENCH DETAIL
- VOLUME 2 - FIGURE 2.6 TYPICAL ACCESS TRACK DETAIL
- VOLUME 2 - FIGURE 2.8 TYPICAL WATER CROSSING METHOD
- VOLUME 2 - FIGURE 2.9 TYPICAL BATTERY STORAGE CONTAINER ELEVATIONS
- VOLUME 2 - FIGURE 2.10 INDICATIVE ONSITE SUBSTATION & BATTERY ENERGY STORAGE SY
- VOLUME 2 - FIGURE 2.11 INDICATIVE ONSITE SUBSTATION & BATTERY ENERGY STORAGE SY
- VOLUME 2 - FIGURE 2.12 TYPICAL ANEMOMETER MAST ELEVATIONS
- VOLUME 2 - FIGURE 2.13 TYPICAL CONSTRUCTION COMPUND LAYOUT
- VOLUME 2 - FIGURE 3.1A DESIGN ITERATION 1 - SCOPING (98) TURBINES DESIGN
- VOLUME 2 - FIGURE 3.1B INITIAL CONSTRUCTION MAP (JULY 2023)
- VOLUME 2 - FIGURE 3.2A DESIGN ITERATION 2 - ENVIRONMENTAL & TECHNIVCAL (81 TURBI
- VOLUME 2 - FIGURE 3.2B DESIGN CONSIDERATION (MARCH 2024)
- VOLUME 2 - FIGURE 3.3A DESIGN ITERATION 3 - CONSULATION ROUND 1 (74 TURBINES)
- VOLUME 2 - FIGURE 3.3B DESIGN CONSIDERATION (MAY 2024)
- VOLUME 2 - FIGURE 3.4A DESIGN ITERATION 4 - ENVIRONMENTAL & TECHNICAL (71 TURBIN
- VOLUME 2 - FIGURE 3.4B PEAT & HYDROLOGY (DEC 2024)
- VOLUME 2 - FIGURE 3.4C DESIGN CONSIDERATION (DEC 2024)
- VOLUME 2 - FIGURE 3.5A DESIGN ITERATION 5 - CONSULATION ROUND 2 (68 TURBINES)
- VOLUME 2 - FIGURE 3.5B DESIGN CONSIDERATION (FEB 2025)
- VOLUME 2 - FIGURE 3.5C LOSSIEMOUTH RADA (68 TURBINES)
- VOLUME 2 - FIGURE 3.5D BUCHAN RADAR (68 TURBINES)
- VOLUME 2 - FIGURE 3.6A DESIGN ITERATION 6 - DESIGN FREEZE (67 TURBINES)
- VOLUME 2 - FIGURE 3.6B DESIGN CONSIDERATIONS (APRIL 2025)
- VOLUME 2 - FIGURE 3.7 DESIGN EVOLUTION - SCOPING 2023 TODESIGN FREEZE 2025
- VOLUME 2 - FIGURE 5.1 LANDSCAPE & VISUAL STUDY AREA
- VOLUME 2 - FIGURE 5.2A ZONE OF THEORETICAL VUSUBILITY (ZTV) TO BALDE TIP WITH VI
- VOLUME 2 - FIGURE 5.2B ZONE OF THEORETICAL VUSUBILITY (ZRV) TO HUB HEIGHT WITH V
- VOLUME 2 - FIGURE 5.2C ZONE OF THEORETICAL VUSUBILITY (ZRV) TO MID TOWER WITH VI
- VOLUME 2 - FIGURE 5.2D (LOW RES) ZONE OF THEORETICAL VISIBILITY (ZTV) TO BLADE T
- VOLUME 2 - FIGURE 5.2E DETAILED 10KM ZONE OF THEORETICAL VISIBILITY (ZTV) TO BLA
- VOLUME 2 - FIGURE 5.3A CUMULATIVE WIND FARMS WITHIN 45KM
- VOLUME 2 - FIGURE 5.3B CUMULATIVE WIND FARMS WITHIN 10KM
- VOLUME 2 - FIGURE 5.3C CUMULATIVE ZONE OF THEORETICAL VISIBILITY - EXISTING DORE
- VOLUME 2 - FIGURE 5.3D CUMULATIVE ZONE OF THEORETICAL VISIBILITY EXISTING & CONS
- VOLUME 2 - FIGURE 5.3E CUMULATIVE ZONE OF THEORETICAL VISIBILITY - OTHER WIND FA
- VOLUME 2 - FIGURE 5.3F CUMULATIVE ZONE OFTHEORETICAL VISIBILITY - OTHER WIND FAR
- VOLUME 2 - FIGURE 5.4.1 LIGHTING STRATEGY
- VOLUME 2 - FIGURE 5.4.2 BASELINE SATELLITE MAP & STUDY AREA
- VOLUME 2 - FIGURE 5.4.3A ZONE OF THEORETICAL VISIBILITY (ZTV) TO HUB HEIGHT WITH
- VOLUME 2 - FIGURE 5.4.4A LIGHT INTENSITY ZONE OF THEORETICAL VISIBILITY (ZTV) WI
- VOLUME 2 - FIGURE 5.4..4B LIGHT INTENSITY ZONE OF THEORETICAL VIZIBILITY (ZTV) W
- VOLUME 2 - FIGURE 5.4A LANDSCAPE CHARACTER
- VOLUME 2 - FIGURE 5.4B DETAILED LANDSCAPE CHARACTER
- VOLUME 2 - FIGURE 5.5 LANDSCAPE PLANNING DESIGANTIONS
- VOLUME 2 - FIGURE 5.6 WILD LAND AREAS WITH GARDEN & DESIGN LANDSCAPES
- VOLUME 2 - FIGURE 5.7 NATIONAL & LONG DISTANCE ROUTES MOUNTAIN-HILL SUMMITS & MA
- VOLUME 2 - FIGURE 5.8 LOCAL RECREATIONAL ROUTES MOUNTAIL - HILL SUMMITS & MAIN T
- VOLUME 2 - FIGURE 5.9A SEQUENTIAL ROUTE ASSESSMENT - A941
- VOLUME 2 - FIGURE 5.9B- D SEQUENTIAL ROUTE ASSESSMENT - A941
- VOLUME 2 - FIGURE 5.10A RESIDENTAIL VISUAL AMINTY ASSESSMENT -- RESIDENTAIL PROP
- VOLUME 2 - FIGURE 5.10B RESIDENTIAL VIEWPOINT 1
- VOLUME 2 - FIGURE 5.10C RESIDENTIAL VIEWPOINT 1
- VOLUME 2 - FIGURE 5.10D RESIDENTIAL VIEWPOINT 1
- VOLUME 2 - FIGURE 5.10E RESIDENTIAL VIEWPOINT 2
- VOLUME 2 - FIGURE 5.10F RESIDENTIAL VIEWPOINT 2
- VOLUME 2 - FIGURE 5.10G RESIDENTIAL VIEWPOINT 2
- VOLUME 2 - FIGURE 5.10H RESIDENTIAL VIEWPOINT 2
- VOLUME 2 - FIGURE 5.10I RESIDENTIAL VIEWPOINT 3
- VOLUME 2 - FIGURE 5.10J RESIDENTIAL VIEWPOINT 3
- VOLUME 2 - FIGURE 5.10K RESIDENTIAL VIEWPOINT 3
- VOLUME 2 - FIGURE 6.1 KNOWN HERITAGE ASSESTS WITHIN THE SITE
- VOLUME 2 - FIGURE 6.2 CUMULATIVE HERITAGE VIEWPOINTS WITHIN CULTURAL HERITAGE ST
- VOLUME 2 - FIGURE 7.1 SITE LOCATION & DESIGNATED SITES
- VOLUME 2 - FIGURE 7.3A NATIONAL VEGITATION CLASSIFICATION COMMUNITIES MAP 1 OF 3
- VOLUME 2 - FIGURE 7.3B NATIONAL VEGITATION CLASSIFICATION COMMUNITIES MAP 2 OF 3
- VOLUME 2 - FIGURE 7.3C NATIONAL VEGITATION CLASSIFICATION COMMUNITIES MAP 3 OF 3
- VOLUME 2 - FIGURE 7..4A STATIC BAT DETECTOR LOCATIONS
- VOLUME 2 - FIGURE 8.1 SITE LOCATION & DESIGNATS SITES
- VOLUME 2 - FIGURE 8.2 SITE BOUNDARY VANTAGE POINT LOCATIONS & 180 ACRES
- VOLUME 2 - FIGURE 9.1 HYDROLOGIAL SETTING
- VOLUME 2 - FIGURE 9.2 NATIONAL SOIL MAP OF SCOTLAND
- VOLUME 2 - FIGURE 9.3 SCOTTISH NATURAL HERITAGE CARBON & PEATLAND MAP 2016
- VOLUME 2 - FIGURE 9.4 SUPERFICIAL GEOLOGY
- VOLUME 2 - FIGURE 9.5 BEDROCK GEOLOGY
- VOLUME 2 - FIGURE 9.6 HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6A HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6B HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6C HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6D HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6E HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6F HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6G HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6H HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6I HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.6J HYDROLOGICAL FEATURES
- VOLUME 2 - FIGURE 9.7 HYDROLOGICAL REGIME
- VOLUME 2 - FIGURE 9.8 GROUNBD WATER DEPENDENT TERRESTRIAL ECOSYSTEMS
- VOLUME 2 - FIGURE 9.9 DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9A DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9B DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9C DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9D DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9E DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9F DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9G DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9H DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9I DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.9J DEPTH OF PENETRATION & PROBING LOCATIONS
- VOLUME 2 - FIGURE 9.10 ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10A ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10B ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10C ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10D ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10E ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10F ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10G ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10H ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10I ESIIMATED PEAT DEPTH
- VOLUME 2 - FIGURE 9.10J ESIIMATED PEAT DEPTH
- EIA VOLUME 1 - WRITTEN STATEMENT COVER PAGE
- EIA VOLUME 2 - FIGURES COVER PAGE & CONTENTS
- EIA VOLUME 3 - VISUALISATION COVER PAGE & CONTENTS
- EIA VOLUME 4 - TECHNICAL APPENDICES COVER PAGE & CONTENTS
- EIAR NON TECHNICAL SUMMARY
- PRE APPLICATION CONSULATION REPORT
- SOCIO-ECONOMIC IMPACT ASSESSMENT REPORT
- VOLUME 1 - CHAPTER 1 INTRODUCTION
- VOLUME 1 - CHAPTER 2 PROJECT DESCRIPTION
- VOLUME 1 - CHAPTER 3 ALTERNATIVES & DESIGN EVOLUTION
- VOLUME 1 - CHAPTER 4 PLANNING & LEGISLATIVE FRAMEWORK
- VOLUME 1 - CHAPTER 5 LANDSCAPE & VISUAL
- VOLUME 1 - CHAPTER 6 CULTURAL HERITAGE
- VOLUME 1 - CHAPTER 8 ORNITHOLOGY
- VOLUME 1 - CHAPTER 9 HYDROLOGY HYDTOGEOLOGY GEOLOGY & PEAT
- VOLUME 1 - CHAPTER 10 TRAFFIC & TRANSPORT
- VOLUME 1 - CHAPTER 11 NOISE & VIBRATION
- VOLUME 1 - CHAPTER 12 AVIATION
- VOLUME 1 - CHAPTER 13 SUMMARY OF EFFECTS & ENVIRONMENTAL MITIGATION
- VOLUME 1 - WRITTEN STATEMENT
- STATUTORY NOTICE
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Moray for determination, against a statutory target of eight weeks. Over the last year Moray's median decision took 87 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Moray's portal will say. Our guide explains the common types.