Planning application
Millburn Linkwood Road Elgin Moray IV30 8RD
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erect a dwellinghouse in the grounds of
As published by the council, reference 24/01873/PPP
Application record
- Reference
- 24/01873/PPP
- Type
- Planning Permission in Principle
- Status
- Awaiting decision
- Received
- 18 Dec 2024
- Validated
- 8 Jan 2025
- Ward
- Elgin City South
- Parish
- Elgin
- Decision by
- Delegated Power
- Postcode
- IV30 8RD
Site history
Applications at this address on the Moray register
This site has had 2 applications since 2024.
-
25/00947/LBC Awaiting decision
Millburn Linkwood Road Elgin Moray IV30 8RD
Form new opening and reduce height of existing wall
Timeline
Dates from the published record
-
18 Dec 2024
Received by Moray
-
8 Jan 2025
Validated
Checked as complete and ready for consideration.
-
5 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 March 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Moray took a median of 87 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
- TRANSPORTATION MANAGER - UPDATED
- DEVELOPER OBLIGATIONS REPORT
- FLOOD RISK MANAGEMENT - UPDATED
- BOUNDARY WALL CHANGES
- DRAINAGE ASSESSMENT
- SITE AND LOCATION PLAN
- OBJECTION COMMENT
- SCOTTISH WATER
- MORAY FLOOD RISK MANAGEMENT
- TRANSPORTATION MANAGER
- CONTAMINATED LAND
- OBJECTION COMMENT
- OBJECTION COMMENT
- ENVIRONMENTAL HEALTH
- LOCATION PLAN
- SITE AND LOCATION PLAN
- DESIGN AND DRAINAGE STATEMENT
- APPLICATION FOR PLANNING PERMISSION
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Moray for determination, against a statutory target of eight weeks. Over the last year Moray decided outline applications in a median of 143 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Millburn Linkwood Road Elgin Moray IV30 8RD
96% historically approved · decision due ~1 Oct
Form new opening and reduce height of existing wall
Awaiting decision Heritage and listed buildings 10 docs -
Linkwood Farm Cottages Linkwood Road Elgin Moray
Retrospective planning application for erection of 1.8m high boundary wall to rear and gable end at
Granted Full applications 3 docsSmall domestic -
6 Stillmans Wynd Elgin Moray IV30 8AD
97% historically approved · decision due ~12 Nov
Convert garage to bedroom and increase car parking area at
Awaiting decision Full applications 3 docs -
Linkwood Distillery Linkwood Road Elgin Moray IV30 8RD
Replace existing gas fired boiler with a wood pellet boiler and associated wood pellet handling and processing equipment at
Granted Full applications 15 docs -
16 Dunkinty Elgin Moray IV30 8RA
Erect single storey extension at
Granted Full applications Extension 7 docsSmall domestic -
1 Doocot Lane Elgin Moray IV30 6GF
Alter and extend dwellinghouse and retrospective consent to erect summer house at
Granted Full applications 7 docsDomestic
Other outline applications
In Moray
-
26/01247/PPP Awaiting decision
Garden Ground Of West Park House Nairn Road Forres Moray
Form 2no dwellinghouse plots in garden ground of
-
26/01191/SCO Awaiting decision
Parkmore Lime Quarry Dufftown Keith Moray AB55 4DL
EIA scoping report related to a proposed planning application for Parkmore Quarry. The proposed development involves a limited lateral extension to the quarry together with deepening of the quarry within the existing extraction footprint and is aimed at optimising the extraction of the high quality limestone reserves at the quarry. The quarry operates under Planning Permission 05/00413/MIN which expires on 21st February 2042.
-
26/01191/SCN Awaiting decision
Parkmore Lime Quarry Dufftown Keith Moray AB55 4DL
EIA scoping report related to a proposed planning application for Parkmore Quarry. The proposed development involves a limited lateral extension to the quarry together with deepening of the quarry within the existing extraction footprint and is aimed at optimising the extraction of the high quality limestone reserves at the quarry. The quarry operates under Planning Permission 05/00413/MIN which expires on 21st February 2042.
-
25/01648/PPP Withdrawn
Land Between Brae Croft And Gillymule Farm Grange Keith AB55 6TJ
Erect a dwelling and detached garage on
-
26/01133/PPP Awaiting decision
Site Adjacent To Westerton Croft Grange Keith Moray
Erect dwellinghouse and detached garage/carport on