Planning application

Blackhillock Electricity Substation Keith Moray

Granted Moray 24/00986/APP Application for Planning Permission

Relates to 22/00067/S36

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of conditions 6, 13, 15 and 18 imposed on 22/00067/S36 due to the change in bund dimensions at

As published by the council, reference 24/00986/APP

Application record

Reference
24/00986/APP
Type
Application for Planning Permission
Status
Decided
Decision
Granted As published: Permitted
Received
17 Jun 2024
Validated
19 Jun 2024
Decided
23 Oct 2024
Ward
Keith And Cullen
Parish
Strathisla
Decision by
Committee - National/Major

Site history

Applications at this address on the Moray register

This site has had 3 applications since 2021: 2 approved, 0 refused.

  • 22/00067/S36 Granted

    Blackhillock Electricity Substation Keith Moray

    Install a battery energy storage system (BESS) with associated infrastucture at

    Decided 1 Jun 2022
  • 21/01460/SCN Decided

    Blackhillock Electricity Substation Keith Moray

    Install a battery energy storage system (BESS) with assocaited infrastucture at

    Decided 21 Dec 2021 Outline

Timeline

Dates from the published record

  1. 17 Jun 2024

    Received by Moray

  2. 19 Jun 2024

    Validated

    Checked as complete and ready for consideration.

  3. 23 Oct 2024

    Decision issued: Permitted

  4. 16 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 22/00067/S36 Granted

    Blackhillock Electricity Substation Keith Moray

    Install a battery energy storage system (BESS) with associated infrastucture at

    Decided 1 Jun 2022

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Moray granted permission on 23 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Moray

  • 26/01013/APP Granted

    45 Regent Street Keith Moray AB55 5DY

    Proposed alterations to shop front at

    Received 12 Aug, published by the council 16 Aug 2026 Full applications
  • 26/01192/APP Awaiting decision

    Moray Golf Club Stotfield Road Lossiemouth Moray IV31 6QS

    Renew temporary planning consent ref 21/01233/APP and make permnanant the installation of coastal defence structure against the dune face permanent at

    Received 17 Sep, published by the council 19 Sep 2026 Full applications
  • 26/01187/APP Awaiting decision

    8 Invererne Gardens Forres Moray IV36 1EE

    Alter and divide garage to form garden room and garage at

    Received 16 Sep, published by the council 19 Sep 2026 Full applications
  • 26/01188/APP Awaiting decision

    38 Braeside Keith Moray AB55 5AT

    Change of use from amenity ground to garden ground at

    Received 16 Sep, published by the council 19 Sep 2026 Full applications
  • 26/00493/APP Withdrawn

    The Clock Tower The Square Dufftown Keith Moray AB55 4AD

    Alterations to form window in existing opening

    Received 21 Apr, published by the council 27 Jul 2026 Full applications