Planning application
Blackhillock Electricity Substation Keith Moray
Relates to 22/00067/S36
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of conditions 6, 13, 15 and 18 imposed on 22/00067/S36 due to the change in bund dimensions at
As published by the council, reference 24/00986/APP
Application record
- Reference
- 24/00986/APP
- Type
- Application for Planning Permission
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 17 Jun 2024
- Validated
- 19 Jun 2024
- Decided
- 23 Oct 2024
- Ward
- Keith And Cullen
- Parish
- Strathisla
- Decision by
- Committee - National/Major
Site history
Applications at this address on the Moray register
This site has had 3 applications since 2021: 2 approved, 0 refused.
-
22/00067/S36 Granted
Blackhillock Electricity Substation Keith Moray
Install a battery energy storage system (BESS) with associated infrastucture at
-
21/01460/SCN Decided
Blackhillock Electricity Substation Keith Moray
Install a battery energy storage system (BESS) with assocaited infrastucture at
Timeline
Dates from the published record
-
17 Jun 2024
Received by Moray
-
19 Jun 2024
Validated
Checked as complete and ready for consideration.
-
23 Oct 2024
Decision issued: Permitted
-
16 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
22/00067/S36 Granted
Blackhillock Electricity Substation Keith Moray
Install a battery energy storage system (BESS) with associated infrastucture at
Documents
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 23 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Blackhillock Electricity Substation Keith Moray
Install a battery energy storage system (BESS) with associated infrastucture at
Granted 78 docs -
Blackhillock Electricity Substation Keith Moray
Install a battery energy storage system (BESS) with assocaited infrastucture at
Decided Outline -
Land South Of Blackhillock Substation Keith Moray
Installation of a synchronous compensator and ancillary infrastructure on
Withdrawn Full applications -
Blackhillock Quarry Keith Moray AB55 5PA
Proposed southern extension at
Granted Full applications Extension 16 docs -
Land South Of Blackhillock Substation Keith Moray
Installation of a synchronous compensator and ancillary infrastructure at
Decided Outline -
Blackhillock Keith Moray AB55 5PA
Screening Opinion for energy storage modules synchronised condenser housed in a building and other associated ancillary electrical infrastructure at
Decided Outline
Other full applications
In Moray
-
26/01013/APP Granted
45 Regent Street Keith Moray AB55 5DY
Proposed alterations to shop front at
-
26/01192/APP Awaiting decision
Moray Golf Club Stotfield Road Lossiemouth Moray IV31 6QS
Renew temporary planning consent ref 21/01233/APP and make permnanant the installation of coastal defence structure against the dune face permanent at
-
26/01187/APP Awaiting decision
8 Invererne Gardens Forres Moray IV36 1EE
Alter and divide garage to form garden room and garage at
-
26/01188/APP Awaiting decision
38 Braeside Keith Moray AB55 5AT
Change of use from amenity ground to garden ground at
-
26/00493/APP Withdrawn
The Clock Tower The Square Dufftown Keith Moray AB55 4AD
Alterations to form window in existing opening