Planning application
Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
S42 to vary condition 3 and condition 20 of the original planning consent ref 21/00020/EIA at
As published by the council, reference 23/01165/APP
Application record
- Reference
- 23/01165/APP
- Type
- Application for Planning Permission
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 11 Jul 2023
- Validated
- 24 Jul 2023
- Decided
- 16 Feb 2024
- Ward
- Speyside Glenlivet
- Parish
- Dufftown & District
- Decision by
- Committee - National/Major
Site history
Applications at this address on the Moray register
This site has had 4 applications since 2021: 3 approved, 1 refused.
-
24/00532/APP Granted
Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray
Installation and operation of 1x wind turbine (up to 200m to blade tip) with associated infrastructure for a period of 35 years in association with ref 23/01165/APP (PPA-300-2066) at
-
23/00144/APP Granted
Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray
Upgrade works to the existing access track running south of the A920 to
-
21/00020/EIA Refused
Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray
Installation and operation of a wind farm comprising seven turbines with a generating capacity of up to 46.2MW an electricity storage facility with a maximum capacity of 3MW and associated infrastructure on
Timeline
Dates from the published record
-
11 Jul 2023
Received by Moray
-
24 Jul 2023
Validated
Checked as complete and ready for consideration.
-
16 Feb 2024
Decision issued: Permitted
-
5 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
24/00532/APP Granted
Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray
Installation and operation of 1x wind turbine (up to 200m to blade tip) with associated infrastructure for a period of 35 years in association with ref 23/01165/APP (PPA-300-2066) at
- Application: 21/00020/EIA (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
- DECISION NOTICE - APPROVED
- REPORT
- INFORMATION PACK
- TURBINE ELEVATIONS 200M - APPROVED
- SITE LOCATION PLAN - APPROVED
- SITE LAYOUT - APPROVED
- LOCATION PLAN - APPROVED
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 16 February 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray
Installation and operation of a wind farm comprising seven turbines with a generating capacity of up to 46.2MW an electricity storage facility with a maximum capacity of 3MW and associated infrastructure on
Refused Outline 25 docs
Other full applications
In Moray
-
26/00863/APP Granted
30 - 32 Mid Street Keith Moray
Internal alterations and extensions for two townhouses at
-
26/00898/APP Granted
4 Seafield Place Cullen Buckie Moray AB56 4TF
Erect single storey extension at
-
26/00868/APP Granted
The Breamou Inn 1 Cooper Street Hopeman Elgin Moray IV30 5SD
Alter and extend existing bar/restaurant at
-
26/00840/APP Granted
30 Crown Street Portgordon Buckie Moray AB56 5RD
Single storey rear extension including surface water soakaway at
-
26/00979/APP Granted
Delnabo Keepers Cottage Tomintoul Ballindalloch Moray AB37 9HT
Extend dwellinghouse at