Planning application

Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray

Granted Moray 23/00144/APP Application for Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Upgrade works to the existing access track running south of the A920 to

As published by the council, reference 23/00144/APP

Application record

Reference
23/00144/APP
Type
Application for Planning Permission
Status
Decided
Decision
Permitted
Received
31 Jan 2023
Validated
1 Feb 2023
Decided
25 Sep 2023
Ward
Speyside Glenlivet
Parish
Dufftown & District
Decision by
Delegated Power

Site history

Applications at this address on the Moray register

This site has had 3 applications since 2023: 3 approved, 0 refused.

  • 24/00532/APP Granted

    Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray

    Installation and operation of 1x wind turbine (up to 200m to blade tip) with associated infrastructure for a period of 35 years in association with ref 23/01165/APP (PPA-300-2066) at

    Decided 14 Jun 2024 Full applications
  • 23/01165/APP Granted

    Garbet Windfarm Site 5.5km Southeast Of Dufftown Moray

    S42 to vary condition 3 and condition 20 of the original planning consent ref 21/00020/EIA at

    Decided 16 Feb 2024 Full applications

Timeline

Dates from the published record

  1. 31 Jan 2023

    Received by Moray

  2. 1 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 25 Sep 2023

    Decision issued: Permitted

  4. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Moray granted permission on 25 September 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Moray

  • 26/00390/APP Granted

    Brodieshill Farmhouse Forres Moray IV36 2QU

    Change of use of children's play unit to letting unit at

    1 Apr 2026 Full applications
  • 25/01064/APP Granted

    Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray

    Retrospective consent to site and operate a mobile sauna for 4 days a week on

    28 Aug 2025 Full applications
  • 26/00677/APP Granted

    Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray

    Change existing metal halide floodlighting to LED at

    29 May 2026 Full applications
  • 26/01105/APP Awaiting decision

    27 Cuthil Road Keith Moray AB55 5AS

    Retrospective application to replace timber garage with steel framed metal clad garage at

    1 Sep 2026 Full applications
  • 26/00757/APP Granted

    Tarnash Farm Keith Moray AB55 5PB

    Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at

    16 Jun 2026 Full applications