Planning application
Portgordon Maltings Buckie Moray AB56 5BU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of a buried pipeline from the Portgordon Maltings to the MLWS at Tannachy Sands and a 1000m3 tank at
As published by the council, reference 21/01711/APP
Application record
- Reference
- 21/01711/APP
- Type
- Application for Planning Permission
- Status
- Decided
- Decision
- Permitted
- Received
- 28 Oct 2021
- Validated
- 1 Nov 2021
- Decided
- 7 Feb 2022
- Ward
- Fochabers Lhanbryde
- Parish
- Lennox
- Decision by
- Delegated Power
- Postcode
- AB56 5BU
Site history
Applications at this address on the Moray register
This site has had 4 applications since 2021: 2 approved, 0 refused.
-
22/01509/HAZNOT Awaiting decision
Portgordon Maltings Buckie Moray AB56 5BU
Hazardous Substance Consent Notification for
-
21/01605/APP Granted
Portgordon Maltings Buckie Moray AB56 5BU
Application to Phase the development of the Coreside Anaerobic Digestion (AD) facility to demarcate the consented AD site into 2 phases with the addition of additional biomethane processing infrastructure at
-
21/01449/SCN Decided
Portgordon Maltings Buckie Moray AB56 5BU
Proposed Portgordon Biomethane Connection Pipeline at
Timeline
Dates from the published record
-
28 Oct 2021
Received by Moray
-
1 Nov 2021
Validated
Checked as complete and ready for consideration.
-
7 Feb 2022
Decision issued: Permitted
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 7 February 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Portgordon Maltings Buckie Moray AB56 5BU
96% historically approved · decision due ~9 Dec
Hazardous Substance Consent Notification for
Awaiting decision Other -
Mains Of Tannachy Portgordon Buckie Moray AB56 5BU
Erect an agricultural store at
Granted Prior approval 7 docs -
Mains Of Tannachy Portgordon Buckie Moray AB56 5BU
Erect an agricultural store at
Granted Prior approval 7 docs -
Land Adjacent To 6A Garden Lane Portgordon Buckie Moray
Change of use of waste ground to garden ground and erect 1800mm high fence on
Granted Full applications 6 docsSmall domestic -
-
14 Stewart Street Portgordon Buckie Moray AB56 2QT
Erect replacement dwellinghouse and garage at
Granted Full applications 8 docsDomestic
Other full applications
In Moray
-
26/00390/APP Granted
Brodieshill Farmhouse Forres Moray IV36 2QU
Change of use of children's play unit to letting unit at
-
25/01064/APP Granted
Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray
Retrospective consent to site and operate a mobile sauna for 4 days a week on
-
26/00677/APP Granted
Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray
Change existing metal halide floodlighting to LED at
-
26/01105/APP Awaiting decision
27 Cuthil Road Keith Moray AB55 5AS
Retrospective application to replace timber garage with steel framed metal clad garage at
-
26/00757/APP Granted
Tarnash Farm Keith Moray AB55 5PB
Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at