Planning application
Portgordon Maltings Buckie Moray AB56 5BU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of a buried pipeline from the Portgordon Maltings to the MLWS at Tannachy Sands and a 1000m3 tank at
As published by the council, reference 21/01711/APP
Application record
- Reference
- 21/01711/APP
- Type
- Application for Planning Permission
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 28 Oct 2021
- Validated
- 1 Nov 2021
- Decided
- 7 Feb 2022
- Ward
- Fochabers Lhanbryde
- Parish
- Lennox
- Decision by
- Delegated Power
- Postcode
- AB56 5BU
Site history
Applications at this address on the Moray register
This site has had 5 applications since 2019: 3 approved, 0 refused.
-
22/01509/HAZNOT Awaiting decision
Portgordon Maltings Buckie Moray AB56 5BU
Hazardous Substance Consent Notification for
-
21/01605/APP Granted
Portgordon Maltings Buckie Moray AB56 5BU
Application to Phase the development of the Coreside Anaerobic Digestion (AD) facility to demarcate the consented AD site into 2 phases with the addition of additional biomethane processing infrastructure at
-
21/01449/SCN Decided
Portgordon Maltings Buckie Moray AB56 5BU
Proposed Portgordon Biomethane Connection Pipeline at
-
19/00919/HAZ Granted
Portgordon Maltings Buckie Moray AB56 5BU
Application for Hazardous Substance consent for
Timeline
Dates from the published record
-
28 Oct 2021
Received by Moray
-
1 Nov 2021
Validated
Checked as complete and ready for consideration.
-
7 Feb 2022
Decision issued: Permitted
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 7 February 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Portgordon Maltings Buckie Moray AB56 5BU
96% historically approved · decision due ~9 Dec
Hazardous Substance Consent Notification for
Awaiting decision Other -
Mains Of Tannachy Portgordon Buckie Moray AB56 5BU
Replace existing agricultural building with new agricultural building at
Granted Full applications 8 docs -
Mains Of Tannachy Portgordon Buckie Moray AB56 5BU
Erect an agricultural store at
Granted Prior approval 7 docs -
Mains Of Tannachy Portgordon Buckie Moray AB56 5BU
Erect an agricultural store at
Decided Prior approval 7 docs -
Land Adjacent To 6A Garden Lane Portgordon Buckie Moray
Change of use of waste ground to garden ground and erect 1800mm high fence on
Granted Full applications 6 docsSmall domestic -
Other full applications
In Moray
-
26/00863/APP Granted
30 - 32 Mid Street Keith Moray
Internal alterations and extensions for two townhouses at
-
26/00898/APP Granted
4 Seafield Place Cullen Buckie Moray AB56 4TF
Erect single storey extension at
-
26/00868/APP Granted
The Breamou Inn 1 Cooper Street Hopeman Elgin Moray IV30 5SD
Alter and extend existing bar/restaurant at
-
26/00840/APP Granted
30 Crown Street Portgordon Buckie Moray AB56 5RD
Single storey rear extension including surface water soakaway at
-
26/00979/APP Granted
Delnabo Keepers Cottage Tomintoul Ballindalloch Moray AB37 9HT
Extend dwellinghouse at