Planning application
Portgordon Maltings Buckie Moray AB56 5BU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application for Hazardous Substance consent for
As published by the council, reference 19/00919/HAZ
Application record
- Reference
- 19/00919/HAZ
- Type
- Hazardous Substances
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 24 Jul 2019
- Validated
- 12 Aug 2019
- Decided
- 26 May 2021
- Ward
- Fochabers Lhanbryde
- Decision by
- Delegated Power
- Postcode
- AB56 5BU
Site history
Applications at this address on the Moray register
This site has had 5 applications since 2019: 3 approved, 0 refused.
-
22/01509/HAZNOT Awaiting decision
Portgordon Maltings Buckie Moray AB56 5BU
Hazardous Substance Consent Notification for
-
21/01711/APP Granted
Portgordon Maltings Buckie Moray AB56 5BU
Installation of a buried pipeline from the Portgordon Maltings to the MLWS at Tannachy Sands and a 1000m3 tank at
-
21/01605/APP Granted
Portgordon Maltings Buckie Moray AB56 5BU
Application to Phase the development of the Coreside Anaerobic Digestion (AD) facility to demarcate the consented AD site into 2 phases with the addition of additional biomethane processing infrastructure at
-
21/01449/SCN Decided
Portgordon Maltings Buckie Moray AB56 5BU
Proposed Portgordon Biomethane Connection Pipeline at
Timeline
Dates from the published record
-
24 Jul 2019
Received by Moray
-
12 Aug 2019
Validated
Checked as complete and ready for consideration.
-
26 May 2021
Decision issued: Permitted
-
19 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 26 May 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Portgordon Maltings Buckie Moray AB56 5BU
Application to Phase the development of the Coreside Anaerobic Digestion (AD) facility to demarcate the consented AD site into 2 phases with the addition of additional biomethane processing infrastructure at
Granted Full applications 5 docs -
Land Approximately 150 Metres To The West Of The Portgordon Maltings Buckie
Construction and operation of an aerobic digestion facility and energy centre with associated landscaping and drainage works on
Granted Full applications 14 docs -
Land Approximately 200 Metres To The West Of The Portgordon Maltings Buckie Moray
Construction and operation of an aerobic digestion facility and energy centre with associated works
Granted Full applications 12 docs -
Land To South Of Crisp Maltings Portgordon Buckie Moray
Section 42 application to remove Condition 13 of planning permission 24/01376/APP relating to EV charging unit at
Withdrawn Full applications 5 docs -
Land To South Of Crisp Maltings Portgordon Buckie Moray
Erect maturation warehousing development and ancillary buildings/structure (sprinkler tanks/pump house/shed/charging shed/welfare building) land engineering (cut and fill bridging of Core Burn and associated engineering and infrastructure works including formation of access and sub-station on
Granted Full applications 60 docsSmall domestic -
Phase 2 Tynetside Portgordon Maltings Buckie Moray
Amend site layout approved under ref 21/01605/APP at
Granted Full applications 11 docs
Other less common application types
In Moray
-
25/01116/APP Granted
Land At Rosarie Quarry Keith Moray
Part retrospective planning permission for the construction of agricultural road initial hard rock mineral extraction and mineral processing and construction of temporary junction and part new planning permission for extension of hard rock mineral extraction processing area new access junction and creation of ecological/biodiversity buffer and associated ancillary quarry infrastructure on
-
25/01298/HAZ Granted
Dailuaine Distillery Carron Aberlour Moray AB38 7RE
Hazardous Substances Consent to store ethanol/water mixture at
-
25/00354/MIN Refused
Land To South-east Of Dykeside Farm Birnie Elgin
The extraction of sand and gravel by quarrying and the operation of a ready mix concrete plant on
-
26/00180/HAZ Awaiting decision
Glendullan Distillery Dufftown Keith Moray AB55 4DJ
Hazardous Substance consent for ethanol/water mix at
-
26/00093/HAZ Awaiting decision
Glenrothes Distillery Burnside Street Rothes Aberlour Moray AB38 7AA
Hazardous Substance Consent for ethanol at