Planning application

Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

Awaiting decision Moray 20/01522/HAZNOT Hazard Notification

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Hazardous Substance Consent Notification for

As published by the council, reference 20/01522/HAZNOT

Application record

Reference
20/01522/HAZNOT
Type
Hazard Notification
Status
Awaiting decision
Received
12 Nov 2020
Validated
12 Nov 2020
Ward
Speyside Glenlivet
Parish
Dufftown & District
Postcode
AB55 4DH

Site history

Applications at this address on the Moray register

This site has had 10 applications since 2020: 5 approved, 2 refused.

  • 25/01478/APP Granted

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Part internal refurbishment of existing building extension and associated external works

    Decided 5 Feb 2026 Full applications
  • 23/02063/APP Granted

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Demolition of existing store removal of external tank and erect extension to existing tun room at

    Decided 29 Feb 2024 Full applications
  • 23/01985/APP Granted

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Installation and operation of secondary digester tank with alterations to existing concrete containment bund at

    Decided 28 Mar 2024 Full applications
  • 23/01981/SCN Decided

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Install a secondary digester tank with alterations to an existing concrete containment bund all works to be located within existing consented anaerobic digestion facility and energy plant at

    Decided 18 Jan 2024 Outline
  • 23/01715/CLP Refused

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Installation of a filtration concentration building alterations and extensions to existing concrete containment bund and installation of secondary pre-treatment tanks at the anaerobic digestion facility and energy plant at

    Decided 8 Nov 2023 Lawful development
  • 23/01530/CLP Refused

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Install a secondary digester tank with alterations to an existing concrete containment bund all works to be located within existing consented anaerobic digestion facility and energy plant at

    Decided 16 Oct 2023 Lawful development
  • 22/00249/APP Granted

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Erection of a marquee building from April to July at

    Decided 22 Apr 2022 Full applications
  • 20/01046/HAZ Granted

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Application for hazardous substance consent at

    Decided 15 Oct 2021 Other
  • 20/00750/APP Withdrawn

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Relocation of SuDS basin servicing new warehousing original approval under application 19/00923/APP at

    Decided 10 Aug 2020 Full applications

Timeline

Dates from the published record

  1. 12 Nov 2020

    Received by Moray

  2. 9 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 7 January 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Moray took a median of 82 days over the applications it decided in the last year.

What happens while it is decided

This application is with Moray for determination, against a statutory target of eight weeks. Over the last year Moray's median decision took 82 days. More in our guide to how long planning decisions take.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Moray

  • 25/01116/APP Granted

    Land At Rosarie Quarry Keith Moray

    Part retrospective planning permission for the construction of agricultural road initial hard rock mineral extraction and mineral processing and construction of temporary junction and part new planning permission for extension of hard rock mineral extraction processing area new access junction and creation of ecological/biodiversity buffer and associated ancillary quarry infrastructure on

    8 Sep 2025 Other
  • 25/01298/HAZ Granted

    Dailuaine Distillery Carron Aberlour Moray AB38 7RE

    Hazardous Substances Consent to store ethanol/water mixture at

    8 Oct 2025 Other
  • 26/00180/HAZ Awaiting decision

    Glendullan Distillery Dufftown Keith Moray AB55 4DJ

    Hazardous Substance consent for ethanol/water mix at

    10 Feb 2026 Other
  • 26/00093/HAZ Awaiting decision

    Glenrothes Distillery Burnside Street Rothes Aberlour Moray AB38 7AA

    Hazardous Substance Consent for ethanol at

    26 Jan 2026 Other
  • 26/00077/HAZ Awaiting decision

    Balvenie Distillery Dufftown Keith Moray AB55 4BB

    Hazardous Substance Consent increase in ethanol and diesel at

    22 Jan 2026 Other