Planning application

Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

Granted Monmouthshire DM/2026/00909

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC.

As published by the council, reference DM/2026/00909

Application record

Reference
DM/2026/00909
Status
Decided
Decision
Granted As published: Approve
Received
23 Jul 2026
Validated
23 Jul 2026
Decided
27 Aug 2026
Ward
Mitchel Troy And Trellech
Parish
Mitchel Troy Community Council
Decision by
Delegated Officer
Postcode
NP25 4DZ

Site history

Applications at this address on the Monmouthshire register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • DM/2026/00869 Decided

    Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

    The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC. Why necessary for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management. Why designed for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management.

    Decided 21 Jul 2026

Timeline

Dates from the published record

  1. 23 Jul 2026

    Received by Monmouthshire

  2. 28 Jul 2026

    Added to PlanIndex

  3. 27 Aug 2026

    Decision issued: Approve

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

  • AN FURTHER DETAILS APPROVED Decision · 27 Aug 2026
  • MCC LEAD LOCAL FLOOD AUTHORITY COMMENT Consultee Comment · 19 Aug 2026
  • MCC BIODIVERSITY Consultee Comment · 17 Aug 2026
  • SAB Consultee Comment · 29 Jul 2026
  • NATURAL_FLOOD_MANAGEMENT_PROPOSALS Other · 23 Jul 2026
  • POND SITE MAP Drawing · 23 Jul 2026
  • AGRICULTURAL APPLICATION Application Form · 23 Jul 2026
  • LOCATION PLAN Drawing · 23 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Monmouthshire granted permission on 27 August 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Monmouthshire's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

    DM/2026/00869 Submitted 16 Jul 2026 50 yards away

    The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC. Why necessary for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management. Why designed for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management.

    Decided 6 docs
  • White House Cottage Bryngwyn Road Dingestow Monmouth Monmouthshire NP25 4DT

    DM/2023/00392 Submitted 13 Mar 2023 200 yards away

    It is proposed to build a detached garage to the rear of the existing property. it is not proposed to alter any entrance into the property, but a not granular hard standing it to be constructed.

    Granted Lawful development 6 docs