Planning application
DM/2026/00800
Pwll Yr Hywaid Red House Road Llanarth Monmouthshire NP7 9UH
Proposal
Proposed agricultural building
As published by the council, reference DM/2026/00800
Timeline
Dates from the published record
-
1 Jul 2026
Received by Monmouthshire
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Monmouthshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
DM/2025/01541 Refused
Pwll Yr Hywaid Red House Road Llanarth Monmouthshire NP7 9UH
Erection of an agricultural building measuring 30.4m x 15m (2 no. machinery bays and 3 no. hay storage bays)
-
DM/2026/00148 Refused
Pwll Yr Hywaid Red House Road Llanarth Monmouthshire NP7 9UH
Proposed new machinery store and hay barn.
Other other applications
In Monmouthshire
-
DM/2026/00909 Awaiting decision
Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ
The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC.
-
DM/2026/00899 Awaiting decision
Troy View Craig-y-dorth Road Mitchel Troy Common Mitchel Troy Monmouthshire NP25 4RL
Farm implement shed
-
DM/2026/00869 Decided
Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ
The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC. Why necessary for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management. Why designed for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management.
-
DM/2026/00768 Decided
Upper Court Farm King Road Penpergwm Monmouthshire NP7 9AS
Proposed new general purpose agricultural and associated works.
-
DM/2026/00887 Awaiting decision
Land Adjacent To Wyastone Leys Fishery A40 Trunk Road From Hardwick Roundabout To Monmouth Monmouthshire
Replacement general-purpose agricultural building and associated works.