Skip to content
PlanIndex Get alerts
Menu

Planning application

8 LUDLOW CLOSE, BLETCHLEY, MILTON KEYNES, MK3 6BB

Awaiting decision Milton Keynes PLN/2026/1783 Prior approval: Larger home extension

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Prior Approval of single storey rear extension, with eaves of 3m metres and maximum height of 3m metres, extending 4.5 metres from the original rear wall

As published by the council, reference PLN/2026/1783

Application record

Reference
PLN/2026/1783
Type
Prior approval: Larger home extension
Status
Under Consultation
Received
21 Aug 2026
Validated
2 Sep 2026
Ward
Bletchley West
Parish
West Bletchley
Decision by
Delegated Decision
Postcode
MK3 6BB

Timeline

Dates from the published record

  1. 21 Aug 2026

    Received by Milton Keynes

  2. 2 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 28 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Milton Keynes took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Milton Keynes for determination, against a statutory target of eight weeks. Over the last year Milton Keynes decided prior approval applications in a median of 42 days. More in our guide to how long planning decisions take.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Milton Keynes

  • PLN/2026/1366 Granted

    41 LORINER PLACE, DOWNS BARN, MILTON KEYNES, MK14 7PU

    Prior Approval of single storey rear extension, with eaves of 2.92 metres and maximum height of 3.67 metres, extending 4.05 metres from the original rear wall

    29 Jun 2026 Prior approval
  • PLN/2026/1481 Granted

    10 LOUGHBOROUGH DRIVE, BROUGHTON, MILTON KEYNES, MK10 7DZ

    Prior Approval of single storey rear extension, with eaves of 2.75 metres and maximum height of 3 metres and extending 5.25 metres from the original rear wall

    13 Jul 2026 Prior approval
  • PLN/2026/1315 Granted

    BLETCHLEY LEISURE CENTRE, PRINCES WAY, BLETCHLEY, MILTON KEYNES, MK2 2HQ

    Prior notification for the installation of 254 roof-mounted photovoltaic (PV) solar panels (154.9kWp total installed capacity) on the north and south-facing pitched roof slopes of the existing leisure centre building, including associated mounting equipment, cabling, electrical infrastructure, and all ancillary works

    19 Jun 2026 Prior approval
  • PLN/2026/1215 Granted

    AFL Telecommunications Uk Ltd, Davy Avenue , Knowlhill , Milton Keynes, MK5 8ND

    Prior notification for the installation of a 336.3kWp solar PV system with 708 panels split on two roofs. Will be on a pitched standing seam mounting roof system.

    8 Jun 2026 Prior approval
  • PLN/2026/1740 Awaiting decision

    Nimbus House, Maidstone Road, Kingston, Milton Keynes, MK10 0BD

    Prior Approval for the proposed installation of a Solar Photovoltaic (PV) system mounted on the existing metal trapezoidal sheet roof of the building

    18 Aug 2026 Prior approval