Skip to content
PlanIndex Get alerts
Menu

Planning application

Rear of 164 Buckingham Road Bletchley

Granted Milton Keynes 19/03136/FUL Full planning permission

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Propoesd new dwelling and associated works

As published by the council, reference 19/03136/FUL

Application record

Reference
19/03136/FUL
Type
Full planning permission
Status
Decision Made
Decision
Application permitted
Received
20 Nov 2019
Validated
11 Dec 2019
Decided
5 Feb 2020
Ward
Bletchley Park (Historic 2026)
Parish
West Bletchley
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 20 Nov 2019

    Received by Milton Keynes

  2. 11 Dec 2019

    Validated

    Checked as complete and ready for consideration.

  3. 5 Feb 2020

    Decision issued: Application permitted

  4. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25 Colchester Walk Bletchley Milton Keynes MK3 6AW

    20/01819/FUL Submitted 29 Jul 2020 69m away

    Single storey rear extension

    Granted Full applications Extension 7 docs
    Small domestic
  • 12 St Augustus Close Bletchley Milton Keynes MK3 5HF

    19/03106/FUL Submitted 20 Nov 2019 145m away

    Single storey side extension

    Granted Full applications Extension 9 docs
    Small domestic
  • 139 BUCKINGHAM ROAD, BLETCHLEY, MILTON KEYNES, MK3 5JD

    PLN/2026/1435 Submitted 7 Jul 2026 153m away

    Approval of details required by condition 3 (door details) of permission ref. PLN/2025/2035

    Refused Conditions 3 docs
  • 137 BUCKINGHAM ROAD, BLETCHLEY, MILTON KEYNES, MK3 5JD

    PLN/2025/2192 Submitted 16 Oct 2025 153m away

    Variation of Condition 2 (hard and soft landscaping) in order to change the condition to a compliance condition, requiring compliance with the submitted landscaping details (relating to permission ref. 19/01538/FUL for the erection of a single storey rear extension and addition of additional storey (Part Retrospective))

    Granted Amendments Extension 5 docs
    Small domestic
  • 139 BUCKINGHAM ROAD, BLETCHLEY, MILTON KEYNES, MK3 5JD

    PLN/2025/2035 Submitted 29 Sep 2025 153m away

    Listed Building Consent for the replacement of the existing exterior rear door (from kitchen to garden). Repair & retain existing door frame

    Granted Heritage and listed buildings 12 docs
  • The Old Swan, 8 Shenley Road, Bletchley, Milton Keynes, MK3 6EZ

    PLN/2026/0545 Submitted 13 Mar 2026 195m away

    Advertisement consent for display of 1x pictorial projecting sign, 1x fascia sign, 2 set of sign written text and logo, 3x welcome signs, 1x directional panel to existing post, and 1x car park directional sign

    Granted Advertising 5 docs

In Milton Keynes

  • PLN/2025/2661 Refused

    117 QUEENSWAY, BLETCHLEY, MILTON KEYNES, MK2 2DH

    Change of use to include Sui Generis laundromat, installation of laundry equipment and external alterations

    15 Dec 2025 Full applications
  • PLN/2026/1401 Granted

    BRITISH TELECOM, SILVER STREET, NEWPORT PAGNELL, MK16 0EJ

    Installation of ventilation louvres within existing ground floor windows to the north elevation

    2 Jul 2026 Full applications
  • PLN/2026/1150 Withdrawn

    Calverton Cottage, Calverton, Milton Keynes, MK19 6ED

    New building with hardstanding in adjacent field to include two stables, workshop and tractor storage including new gated ramped pathway, new hardstanding for vehicles with access, proposed landscaping/biodiversity enhancements, increase in land levels, alterations to the gate and walls of the existing vehicle access

    1 Jun 2026 Full applications
  • PLN/2026/0575 Refused

    George House, Crosslands, Stantonbury, Milton Keynes, MK14 6DB

    Use of land to extend existing site for temporary housing of homeless persons including replacement office building (Use Class E(g)(i)) and erection of ancillary shed

    17 Mar 2026 Full applications
  • PLN/2026/0959 Granted

    11-16 Juniper Gardens, Walnut Tree, Milton Keynes MK7 7LZ

    Replacement windows to all elevations and floors

    11 May 2026 Full applications