Planning application
Lands immediately West of Creagh Roundabout and Approx. 150M East of No 38-40 Hillhead Road (The Elk Complex), Toomebridge, Antrim
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed erection of an electric vehicle ("EV") charging hub to include HGV EV charging bays, improved vehicular accesses from Hillhead Road and Creagh Business Park all associated site works including amenity pod, boundary fencing, canopies, lighting columns and closed circuit tv columns
As published by the council, reference LA09/2026/0733/F
Application record
- Reference
- LA09/2026/0733/F
- Type
- Full
- Status
- Awaiting decision
- Received
- 21 Jul 2026
- Validated
- 31 Jul 2026
- Ward
- Ballymaguigan
- Parish
- Moyola
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
21 Jul 2026
Received by Mid Ulster
-
31 Jul 2026
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 104 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
49 documents on file for this application
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- SUPPORT RHA
- DFI ROADS MAGHERAFELT TEAM 1
- STANDARD NN LETTER (BULK)
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- ACKNOWLEDGE APP AND FEE RECEIPT
- SITE LOCATION
- PRELIMINARY ECOLOGICAL APPRAISAL
- PRELIMINARY RISK ASSESSMENT
- TRANSPORT ASSESSMENT FORM
- DRAINAGE ASSESSMENT
- OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- OUTDOOR LIGHTING REPORT
- ISOLUX LIGHT PLAN
- LIGHTING IMPACT ASSESSMENT
- SUPPORTING, PLANNING, DESIGN & ACCESS STATEMENT
- PROPOSED SITE SECTIONS
- PROPOSED SITE PLAN
- NIE KIOSK- FLOOR PLANS AND ELEVATIONS
- LIGHT AND FENCE SPECS
- HGV PODS
- HGC KIOSK- FLOOR PLANS & ELEVATIONS
- HGV CHARGER PLANS
- HGV CANOPY PLAN
- HGV CANOPY ELEVATIONS
- FENCING AND LIGHTING PLANS
- EXISTING SITE PLAN
- EV CHARGER ELEVATIONS
- EV CANOPY ELEVATIONS
- EV CANOPY ELEVATIONS
- EV CABINET- FLOOR PLANS & ELEVATIONS
- CLIENT KIOSK- FLOOR PLANS AND ELEVATIONS
- CANOPY PLAN
- AMENITY POD- FLOOR PLANS & ELEVATIONS
- HGV ARRANGEMENT
- HGV TRACKING
- P1 FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 112 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Lands immediately West of Creagh Roundabout and Approx. 150M East of No 38-40 Hillhead Road (The Elk Complex), Toomebridge,
97% historically approved · decision due ~16 Sep
Advertising consent for erection of 1 no. wall mounted signage and 1 no. illuminated totem display signage to include digital display screen
Awaiting decision Advertising 10 docs -
Uform 8 Creagh Business Park Hillhead Road Toome
Installation of roof mounted Solar PV Panels
Granted Full applications 8 docs -
15 Blackpark Road Toome BT41 3SL
Alterations and extension to existing dwelling
Granted Full applications Extension 12 docsDomestic -
6 Creagh Industrial Park Toome
Side extension to the existing storage and distribution unit, erection of a roof over the existing concrete yard area, change of cladding colour to main entrance, and formation of a new vehicular exit point
Granted Full applications Extension 24 docs -
3 Creagh Business Park Hillhead Road Toomebridge BT41 3UF
2 no industrial buildings for manufacturing of modular buildings and the alterations to existing buildings to include the provision of new offices and new facade to existing building with provision of canteen facilities to separate existing unit
Granted Full applications 31 docs -
Lands adjacent to and Immeditially North East of Unit 3 Creagh Business Park Toomebridge
97% historically approved · decision due ~6 Jan
Extension to curtilage of existing premises to provide storage
Awaiting decision Extension
Other full applications
In Mid Ulster
-
LA09/2026/0704/F Decided
14 Glenmaquill Road Magherafelt BT45 5EW
Extension to dwelling
-
LA09/2023/0545/F Decided
134 Ballyronan Road Magherafelt BT45 6HR
Retention of Agricultural Storage / Livestock Building over an Existing Farm Tank
-
LA09/2026/0628/F Decided
1 Coole Cottages Coalisland BT71 5DN
Alteration and extension to provide a single storey extension to side of dwelling to accommodate a kitchen/dining and 2 no. additional bedrooms
-
LA09/2026/0503/F Decided
Land Approx. 75M SE of 21 Iniscarn Road Moneymore Londonderry BT45 7RH
New agricultural access Laneway.
-
LA09/2024/0872/F Decided
5 Annagher Road Coalisland BT71 4NE
Demolition of existing dwelling and replace with two semi detached dwellings