Planning application
3 Creagh Business Park Hillhead Road Toomebridge BT41 3UF
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
2 no industrial buildings for manufacturing of modular buildings and the alterations to existing buildings to include the provision of new offices and new facade to existing building with provision of canteen facilities to separate existing unit
As published by the council, reference LA09/2022/1431/F
Application record
- Reference
- LA09/2022/1431/F
- Type
- Full
- Status
- Permission Granted
- Decision
- Granted As published: Permission Granted
- Received
- 27 Sep 2022
- Validated
- 27 Sep 2022
- Decided
- 20 Feb 2023
- Ward
- Ballymaguigan
- Parish
- Moyola
- Decision by
- Delegated Decision
- Postcode
- BT41 3UF
Timeline
Dates from the published record
-
27 Sep 2022
Received by Mid Ulster
-
20 Feb 2023
Decision issued: Permission Granted
-
16 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
P McVey Building Systems Applicant, registered in Antrim
Active · incorporated 2015 · Antrim
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
- DELEGATED REPORT (DEL)
- FULL - PERMISSION GRANTED
- APPROVED DRAWINGS
- APPROVED DRAWINGS
- APPROVED DRAWINGS
- EIA SCREENING
- EIA - 2017 NOT REQUIRED REG 12
- HRA SCREENING
- MID ULSTER DISTRICT COUNCIL ENVIRONMENTAL HEALTH
- STANDARD NN LETTER (BULK)
- STANDARD CONSULTATION LETTER
- DFI ROADS MAGHERAFELT TEAM 1
- DFI ROADS MAGHERAFELT TEAM 1
- NI WATER DEVELOPER SERVICES
- NI WATER DEVELOPER SERVICES
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD NN LETTER (BULK)
- STANDARD CONSULTATION LETTER
- EXISTING PLANS
- ACKNOWLEDGE APP AND FEE RECEIPT
- ACKNOWLEDGE APP AND FEE RECEIPT
- APPLICATION FORM P1
- SITE LOCATION PLAN
- BLOCK PLAN
- PROPOSED FLOOR PLANS
- PROPOSED FLOOR PLANS
- PROPOSED FLOOR PLANS
- EXISTING AND PROPOSED PLANS
- EXISTING PLANS
- EXISTING PLANS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Mid Ulster granted permission on 20 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Lands adjacent to and Immeditially North East of Unit 3 Creagh Business Park Toomebridge
97% historically approved · decision due ~6 Jan
Extension to curtilage of existing premises to provide storage
Awaiting decision Extension -
6 Creagh Industrial Park Toome
Side extension to the existing storage and distribution unit, erection of a roof over the existing concrete yard area, change of cladding colour to main entrance, and formation of a new vehicular exit point
Granted Full applications Extension 24 docs -
Uform 8 Creagh Business Park Hillhead Road Toome
Installation of roof mounted Solar PV Panels
Granted Full applications 8 docs -
Lands immediately West of Creagh Roundabout and Approx. 150M East of No 38-40 Hillhead Road (The Elk Complex), Toomebridge, Antrim
100% historically approved · decision due ~25 Sep
Proposed erection of an electric vehicle ("EV") charging hub to include HGV EV charging bays, improved vehicular accesses from Hillhead Road and Creagh Business Park all associated site works including amenity pod, boundary fencing, canopies, lighting columns and closed circuit tv columns
Awaiting decision Full applications 49 docs -
Lands immediately West of Creagh Roundabout and Approx. 150M East of No 38-40 Hillhead Road (The Elk Complex), Toomebridge,
97% historically approved · decision due ~16 Sep
Advertising consent for erection of 1 no. wall mounted signage and 1 no. illuminated totem display signage to include digital display screen
Awaiting decision Advertising 10 docs
Other full applications
In Mid Ulster
-
LA09/2026/0805/F Decided
Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG
Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H
-
LA09/2026/1126/F Awaiting decision
49 Church Street Cookstown BT80 8HT
Retention of single storey rear replacement extension with internal alterations to dwelling
-
LA09/2025/0520/F Decided
2 Lisnamuck Road Tobermore BT45 5QF
Production facility shed for the manufacture of decorative paving and walling products
-
LA09/2026/0726/F Decided
Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR
Extension and alterations to dwelling
-
LA09/2025/0955/F Decided
Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN
3 No. Glamping Pods, Parking, Landscaping and Associated Site Works